Loading...
LL-07-87 Staff Report.pdf CITY OF EDMONDS PLANNING DIVISION REVIEW OF A PROPOSED LOT LINE ADJUSTMENT FILE # LL-07-87 CONTACT PERSON/AGENT Charles Greenberg APPLICANT Charles and Marsha Greenberg PROPERTY OWNER Charles and Marsha Greenberg rd PROPERTY LOCATION 155 3 Avenue South rd PROJECT DESCRIPTION Lot line adjustment between 145 and 155 3 Avenue South A. INTRODUCTION During the review of building permit BLD-2005-0722, it was recognized that the Third and Dayton building encroached slightly onto the property directly to the north (Beresford Law Office). The proposed lot line adjustment will resolve the encroachment. The applicant is rd proposing to adjust the lot line between the two parcels; Parcel A is 145 3 Avenue South (ID rd 27032300405400) and Parcel B is 155 3 Avenue South (ID 27032300405600). Approximately 45 square feet of land will be transferred from Parcel A to Parcel B. The proposed new property line separating these parcels is approximately 0.56’ to 0.65’ north of the existing property line as shown in Attachment 3. B. ANALYSIS OF DESIGN: 1. Number of Lots Involved: Prior to Lot Line Adjustment - 2; Post Adjustment - 2 2. Lot Area: a. Total Lot Area: 13,142 square feet b. Area of each lot: Existing sf (gross) Proposed sf (gross) Parcel A 8,642 8,597 Parcel B 4,500 4,545 3. Topographical Consideration: The proposed adjustment is not influenced by a topographical consideration. 4. Flag Lot Determination: The subject parcels are not considered flag lots. 5. Corner Lot Determination: Parcel B is a corner lot. 6. Comprehensive Plan: Both parcels are defined as Downtown Mixed Commercial within the Downtown/Waterfront Activity Center. The current proposal meets the intent of the Comprehensive Plan. 7. Zoning Ordinance: The proposal meets the intent of the Zoning Ordinance (ECDC 20.75.050). Both parcels are currently zoned Downtown Mixed Commercial (BD-2). LL-2007-87 Page 2 of 3 8. Access: Existing access will not change as a result of the proposed adjustment. C. ENVIRONMENTAL ASSESSMENT: 1. SEPA Determination: Not required for this proposal. 2. Shoreline Master Program: Exempt from Shoreline Master Program permits. 3. Critical Area Determination: Not required for this proposal. D. REQUIRED IMPROVEMENTS AND DEDICATIONS: The Engineering Division has reviewed the application and is not requiring any improvements or dedications. E. DECISION: Approved with the following conditions: 1.Include the lot line adjustment file number LL-2007-0087 on the documents to be recorded. 2.Make sure all documents to be recorded meet the Snohomish County Auditor’s requirements for recording, including all signatures in black ink. 3.Submit the documents to be recorded to the City of Edmonds’ Planning Division for review prior to recording. Documents must have the city’s approval before they can be recorded. 4.Once the final documents are approved by the City, the applicant must record the approved documents with Snohomish County Auditor’s office. 5.After recording, please provide the City of Edmonds Planning Division with three copies of the recorded documents with the recording number on them. The City will not consider the lot line adjustment to be complete until this is done. F. ATTACHMENTS: 1. Vicinity / Zoning Map 2. Application 3.Preliminary Lot Line Adjustment Map 4. Preliminary Parcel Legal Descriptions I have determined that the application is complete and have reviewed the application for lot line adjustment pursuant to Chapters 20.75 and 20.95 of the Edmonds Community Development Code. November 27 , 2007 Michael Clugston, Planning Division Date -------------------------------------------------------------------------------------------------------------------------- RECONSIDERATION OF DECISION A request for reconsideration or clarification of this decision may be made by filing a letter and fee with the Planning Department within ten (10) working days of the date of decision. THE RIGHT TO APPEAL LL-2007-87 Page 3 of 3 This decision may be appealed to the Hearing Examiner. In this case, a written letter and other items needed to appeal must be submitted to the Planning Division within fourteen (14) calendar days of the date of decision. Please contact the Planning Division for information. Note that per ECDC 20.105.010.A.2, appeals of lot line adjustments are limited to appeals by the applicant only of a denial of a requested lot line adjustment application. TIME LIMITS FOR RECONSIDERATION AND APPEALS The time limits for reconsiderations and appeals run concurrently. If a request for reconsideration is filed before the time limit for filing an appeal has expired, the time “clock” for filing an appeal is stopped until a decision on the reconsideration request is completed. Once the staff has issued his/her decision on the reconsideration request, the time clock for filing an appeal continues from the point it was stopped. For example, if a request is filed on day 5 of the appeal period, an individual would have 9 more days in which to file an appeal after the staff issues their decision on the reconsideration request. City of Edmonds, Attn.: Planning Division 121 - 5th Avenue North Edmonds, Washington 98020 PARTIES OF RECORD: Planning Division Charles and Marsha Greenberg rd 126 3 Avenue South Edmonds, WA 98020