Loading...
LLA-Engineering Memo of Compliance with Easement Deferral-PLN20180027.pdfY MEMORANDUM Date: August 21, 2018 To: Brad Shipley, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20180027 — Lot Line Adjustment Edmonds Lutheran Church — 23525 84t" Ave W Engineering has reviewed the subject application and found the information provided is consistent with Title 18 Edmonds Community Development Code & Engineering standards. As shown on the survey prepared by Core Design and dated May 1, 2018, Lot B is encumbered by existing easements. No changes to the easements are proposed or approved with this lot line adjustment. It shall be noted that a building permit (BLD20171842) was issued for improvements within proposed Lots A & B. With construction of these improvements, a sanitary sewer easement will be required across Lot A. The owner has requested the recording of the sanitary sewer easement be placed as a condition on the building permit, requiring recording of the easement prior to final certificate of occupancy (see attached). Thank you. City of Edmonds '.,�DESIGN `_ V July 31, 2018 Q W Jeanie McConnell City of Edmonds, Engineering Program Manager U 121 5' Avenue North Edmonds, WA 98020 Re: PLN20180027 Lot Line Adjustment Edmonds Lutheran Church - 23525 — 841h Ave W. CORE Project No. 17201 V Dear Jeanie, This letter is a request to defer the requirement to record any easements between the two new lots of the Lot Line Adjustment and add it as a condition to the receipt of final Certificate of Occupancy for Building Permit BLD20171842. Sincerely, CORE DESIGN, INC. Glenn R. Sp rag L Principal, Sr. Project Surveyor Patrick Brady, Project Manage Edmonds Lutheran Church