LLA-Engineering Memo of Compliance with Easement Deferral-PLN20180027.pdfY MEMORANDUM
Date: August 21, 2018
To: Brad Shipley, Associate Planner
From: Jeanie McConnell, Engineering Program Manager
Subject: PLN20180027 — Lot Line Adjustment
Edmonds Lutheran Church — 23525 84t" Ave W
Engineering has reviewed the subject application and found the information provided is
consistent with Title 18 Edmonds Community Development Code & Engineering standards.
As shown on the survey prepared by Core Design and dated May 1, 2018, Lot B is
encumbered by existing easements. No changes to the easements are proposed or approved
with this lot line adjustment.
It shall be noted that a building permit (BLD20171842) was issued for improvements within
proposed Lots A & B. With construction of these improvements, a sanitary sewer easement
will be required across Lot A. The owner has requested the recording of the sanitary sewer
easement be placed as a condition on the building permit, requiring recording of the easement
prior to final certificate of occupancy (see attached).
Thank you.
City of Edmonds
'.,�DESIGN
`_
V
July 31, 2018
Q
W
Jeanie McConnell
City of Edmonds, Engineering Program Manager
U 121 5' Avenue North
Edmonds, WA 98020
Re: PLN20180027 Lot Line Adjustment
Edmonds Lutheran Church - 23525 — 841h Ave W.
CORE Project No. 17201
V
Dear Jeanie,
This letter is a request to defer the requirement to record any easements between the two new lots of the
Lot Line Adjustment and add it as a condition to the receipt of final Certificate of Occupancy for Building
Permit BLD20171842.
Sincerely,
CORE DESIGN, INC.
Glenn R. Sp rag L
Principal, Sr. Project Surveyor
Patrick Brady, Project Manage