LTR-Items to complete prior to release of bond, 3-6-08.pdflr)c. 1a'(P
CITY Off' ' DON D
121 5TH AVENUE NORTH o EDMONDS, WA 98020 m 425-771-022D - FAX 425-771-0221
Website: www.c€.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
January 7, 2011
Mr. Jurgen Sauerland
PMA Development Services LLC
19217 36th Ave W. Ste. 106
Lynnwood, WA 98036
RE: Performance Bond for Short Plat 05-172
Dear Mr. Sauerland,
MIKE COOPER
MAYOR
I am sending the following corrections to you in response to Asset Managements calls to release your
bond. As you know, the performance bond was never released so has been in placed for over four
years. We are inspecting the short plat improvements as a "nnaintenance" final inspection. Therefore
we have inspected all the improvements for condition and have listed below the following corrections
that must be addressed prior to bond release. Once the corrections are resolved, the bond will be
released without the requirement of a partial bond for maintenance since adequate time has passed to
determine the quality of workmanship and materials of the improvements. I have included a letter sent
to Mike Arnim in March of 2008 listing corrections necessary at that time, several of which are still
outstanding.
The following items must be addressed before the performance bond can be released:
I) Complete inside drop in side sewer manhole where lateral ties in.
2) Replace damaged sewer lateral pipe at connection inside manhole (see pic)
3) Redo asphalt patch in front of curb and gutter, Disintegrating in patches.
4) Redo asphalt patch in alley where connection was made to sewer manhole.
5) Crushed rock needed at backside of asphalt ramp, northwest comer.
Please call for an inspection as soon as you have completed the requirements listed above. If you have
,any questions regarding any of these requirements, please call Jeanie McConnell or myself at 425-771-
0220.
Sincerely;
( (x,11
JoAnne Zulauf
Engineer Technician
Public Works Division
425-7710220 x-1324
zulauf@ci.edmonds.wa.us
Eng: Private Dove] opment/Bond Release
fncor��orc�i�c A��g��s �I17 1890
Sister City - Hekinan, Japan
GARY HAAKENSON
MAYOR
121 51H AVENUE NORTH EDMONDS, WA 98020 ° (425) 771-0220 ° FAX (425) 771-0221
Wet)site: v,n ad.edmonds.wa.us
DEVELOPMENT SERVICES DEPAR T MLNl'
I i g()Q Planning - Building - Engineering
March 6, 2008
Mike Arnim
PMA Development Corp.
19400 33rd Ave W. Ste. 200
Lynnwood, WA 98036
RE: Erasion Control Corrections
Performance Bond for Short plat 05-172
Dear Mr-. Arnim,
I ant writing this letter regarding the results of the February 9, 2008 inspection of your short plat at
1128 Viewland Way.
There are erosion control issues on the site that are hazardons and need to be corrected
immediately. Please contact the lEngineeidng department by March 13, 2000 Vvith your dans and
timeline to complete the work necessary.
1) Stabilize louver lot landscape.
2) Install permanent hillside stnbilization.
The following are remaining issues that must be addressed before the performance bond can be
released:
Complete inside drop in side sewer manhole where lateral ties in.
} Replace CB lid at NW coiner of lower lot with vaned grate.
3 Redo asphalt patch in font of curb and gutter. Disintegrating in patches.
Replace damaged lower lot curb and gutter at curb cut.
--5) Provide access to inspect lower lot drainage system.
---6-) Remove construction debris from lower lot.
-S ,7) Remove dirt and debris from street.
i18) Replace CB lid at NE corner of upper Iot with vaned grate, complete mudding.
6.9-9) Unblock open drain line at NE corner of upper lot.
OI,1 0) provide copy of recorded short plat for City of Edmonds records.
please call for a reinspection as soon as you have completed the requirements listed above. If you have
any questions regarding any of these requirements, please call either Ed Sibrel or myself at 425-771-
0220.
Sincerely; !
Toie Zulauf F
Engifzeei- Technicians
cc: Code Enforcement
Eng: Private Development/Bond Release
Mcorporoted. AUgLrst J. 1, 1890 '"