Loading...
Madrona - Request for Work Hours Variance Early Start (Dec-2017).pdfE-1 11 E-11 r] FORMA CONSTRUCTION November 30, 2017 City of Edmonds Development Services Department Attn: Kristin Johns 121 5th Ave N Edmonds, WA 98020 RE: Madrona School Replacement Project Request for Variance — Early Start on Weekend (Saturday) Permit # BLDG20170041 Dear Kristin, FORMA Construction respectfully requests an early work start variance for the following three (3) days: 1. Saturday, December 2"d, 2017: variance to 7:00am start 2. Saturday, December 9th, 2017: variance to 7:00am start 3. Saturday, December 16th, 2017: variance to 7:00am start FORMA is framing in order to prepare for the buildings' roof systems. Due to the time of year, Mother Nature isn't the most generous with dry weather periods. It appears that we have a potential dry (not raining) weather window coming next week. We are requesting an early start variance for this Saturday December 2°d to complete framing areas in preparation for the roofing system. We are asking the same of the following two (2) Saturdays December 9th and 16th to get ahead of any upcoming weather windows. In addition to the attached completed Work Hours Variance Request — Form B, please also review the following for compliance with the type 1 permit variance procedures: 1. Public Convenience: If approved, the variance will not cause any delay to public transportation, services or otherwise. 2. Public Safety: If approved, the variance will not cause any public safety issues. 3. Public Exposure: If approved, there would be no additional exposure. The project site is in a residential area, a short drive off of an arterial. The site is surrounded on 3 sides by large timber and heavy vegetation. The existing school building is located near the collector road. The new building site (where variance work would take place) is located behind the existing school. These factors create a respectful sound protection buffer to the adjacent properties and neighborhood. 4. Public Cost: This project is a public works project. If the variance is allowed, there are no cost impacts to the project. If not allowed, there could be schedule impacts which may incur additional costs for delay recovery. 5. Reasonable Steps: FORMA proposes to only operate the necessary equipment and staff onsite to perform the wood framing work under this variance request. We will locate any equipment strategically as to minimize movements and equipment safety sounds during the variance hours. No other trades or equipment will be operated during the requested time variance period in effort to minimize sound impacts. Other trades and equipment would not begin until the standard Saturday start time of 10:00am. PO BOX 11489, OLYMPIA, WA 98508 1360.754.5788 1 FORMACC.COM E-1 11 E-11 r] FORMA CONSTRUCTION We understand that this is shorter notice than required, however we ask for quick review and acceptance by the City of Edmonds Development Services Department. Any questions regarding this documentation and/or other issues, please contact myself at 206.375.1478. FORMA's site contacts are Lead Superintendent Loren Calvert 360.280.6639 and Superintendent Morgan Salcido 206.786.8112. Thank you for your consideration. Sincerely, �f Jason Pennington Project Manager, FORMA Construction Company P: 206.375.1478 E:jasonp@formacc.com PO BOX 11489, OLYMPIA, WA 98508 1360.754.5788 1 FORMACC.COM DEVELOPMENT SERVICES WORK HOURS VARIANCE REQUEST FORM 121 5th Avenue N, Edmonds, WA 98020 Phone 425.771.0220 Q Fax 425.771.0221 PROJECT NAME: PERMIT(S) #: Madrona School Replacement BLDG20170041 PROJECT ADDRESS: 9300 236th Street SW, Edmonds, WA 98020 APPLICANT: Phone: FORMA Construction Company 360.754.5788 Address (Street, City, State, Zip): E-Mail: PO Box 11489, Olympia, WA 98508 jasonp@formacc.com PROPERTY OWNER: Phone: Edmonds School District #15 425.431.7166 Address (Street, City, State, Zip): E-Mail: 20420 68th Avenue West, Lynnwood, WA 98036 wiltont@edmonds.wednet.edu CONTACT PERSON: (This person must be available at all times that Phone: extended work is being performed) Morgan Salcido -or- Loren Calvert MS: 206.786.8112 LC: 360.280.6639 Address (Street, City, State, Zip): E-Mail: 9300 236th Street SW, Edmonds, WA 98020 morgans@formacc.com (} lorenc@formacc.com CONTRACTOR: Phone: Some as Applicant Some as Applicant Address (Street, City, State, Zip): E-Mail: Same as Applicant Same as Applicant DATES AND TIME OF EXTENDED WORKTIME REQUESTED: WA State Contractor License #/Exp. Date: Three (3) December Saturdays: FORMACC878OR / Exp. 9.19.2019 December 2n69th & 16th: start at 7:00am City of Edmonds Business License #/Exp. Date: NR-023480 / Exp. 1.05.2018 DETAIL THE SCOPE OF WORK TO BE PERFORMED DURING THE REQUESTED TIMES: Wood framing (to get ahead and be ready for dry weather to install roof system). I A RATIONALE FOR THE PROPOSAL SHALL BE SUBMITTED IN ADDITION TO THIS FORM. PLEASE REFER TO THE WORK HOURS VARIANCE REQUEST HANDOUT WHICH ASKS FOR AN EXPLANATION OF HOW THE ACTIVITIES WILL COMPLY WITH THE REQUIREMENTS OF THE VARIANCE ORDINANCE. Print Name: Jason Pennington, FORMA Construction Signature: 'I Date: 11.30.2017 V FORM B \\fs01\Company\16030 Madrona K8\16 Permits\MK8 - Form B 2017 - CoE work hours variance request form (Dec-2017).docx Updated: 09/25/2017