Loading...
Madrona K-8 Final Letter Strcutural Observation.pdfCOUGHLINPORTERLUNDEEN L SEISMIC ENGINEERING December 14, 2018 Brandon Moggio Mahlum 71 Columbia Street, Floor 4 Seattle, WA 98104 RE Madrona K-8 Replacement, Permit # BLD2017-0041 Structural Observation Completion Dear Brandon: CPL Job # S13-0282-01 The purpose of this letter is to acknowledge that Structural Observation in accordance with SBC Section 1704.6 has been completed for the Madrona K-8 Replacement Project. Any observed deficiencies were brought to the attention of the contractor and special inspector and noted in site visit reports and/or project minutes of meeting. To the best of our knowledge, the project has been constructed in accordance with the Contract Documents. Sincerely, COUGHLIN PORTER LUNDEEN, INC. Laura Nettesheim Structural Staff Engineer 12/14/18 801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206.343.0460 / cplinc.com