Madrona K-8 Final Letter Strcutural Observation.pdfCOUGHLINPORTERLUNDEEN
L SEISMIC ENGINEERING
December 14, 2018
Brandon Moggio
Mahlum
71 Columbia Street, Floor 4
Seattle, WA 98104
RE Madrona K-8 Replacement, Permit # BLD2017-0041
Structural Observation Completion
Dear Brandon:
CPL Job # S13-0282-01
The purpose of this letter is to acknowledge that Structural Observation in accordance with SBC Section
1704.6 has been completed for the Madrona K-8 Replacement Project. Any observed deficiencies were
brought to the attention of the contractor and special inspector and noted in site visit reports and/or project
minutes of meeting.
To the best of our knowledge, the project has been constructed in accordance with the Contract Documents.
Sincerely,
COUGHLIN PORTER LUNDEEN, INC.
Laura Nettesheim
Structural Staff Engineer
12/14/18