Loading...
Madrona K-8_Bleacher Deferred Submittal-Code Letter.pdf%�i hu ting YOUR PARTNER FOR SEATING SOLUTIONS TO: Nicole Apeles Nor-Pac Seating Company Inc. 3255 Griffin Ave Enumclaw, WA 98022 DATE: 27, December 2018 RE: Madrona School in Edmonds, WA / Bleacher Building Code To Whom it May Concern: This letter is to clarify that the production drawings Rev1 date 4/18 for Madrona School in Edmonds, WA meets or exceeds the IBC2015 code noted in General notes #4 shown on sheets SH01, FP01, SC01 & DT01 on the right-hand side. Please note that IBC2015 refers to ICC300 2012 for: Aisle Width, ICC300 405.2 Aisle Sizing, ICC300 404.5 Seating Area Limitations, ICC300 407.4.1 ADA spacing, IBC 2012/2015 1108.2.2 & DOJ standard for Accessible Design, Published on 15 September 2010. Nor-Pac Seating has asked Hussey if the bleacher provided on the Rev1 date 4/18 for Madrona School in Edmonds, WA would meet the ICC 300 code for bleacher design. We can confirm that it meets or exceeds the ICC300 2012 bleacher code requirements. If you have any further questions regarding the bleacher / code, please contact me via the listed contact information below. Best Regards, Senior Inside Project Specialist Dealer Support Team iburke@husseyseating.com comm Hussey Seating Company I Your partner for seating solutions. 38 Dyer Street Extension I North Berwick, ME 03906 USA P# (207) 676-0384 F# (207) 676-9815 m d h l U m SUBMITTAL REVIEW This review is only for general conformance with the design concept and the information given in the Construction Documents. Corrections or comments made on the shop drawings during this review do not relieve the contractor from compliance with the requirements of the plans and specifications. Review of a specific item shall not include review of an assembly of which the item is a component. The Contractor is responsible for: dimensions to be confirmed and coordinated at thejobsite; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences and procedures of construction; coordination of the Work with that of all other trades performing all Work in a safe and satisfactory manner. Reviewed ❑ Revise and Resubmit Brandon oggio Rejected ❑ Submit Specified Item Reviewer 12/31/18 ❑ Furnish as Noted ❑ Note Markings Date HUSSEY SEATING COMPANY 38 Dyer Street Ext., North Berwick, Maine 03906 U.S.A., Tel: 207-676-2271, Fax: 207-676-2222 e-mail: info@husseyseating.com, Worldwide Web: www.husseyseating.com