Loading...
Mag- Transmittal Stair Shop Drawings and Calculations Deferred Submittal 15 Mar 2018.pdfStrotkamp Architects P.O. Box 501 Burlington WA 98233 Transmittal To: City of Edmonds Development Services Department Attention: Kristin Johns Senior Permit Coordinator Address: 121 5t' Ave North Edmonds, WA 98020 425.771.0220 CC: Tom Strotkamp (transmittal) David Broadus, Magic Toyota Peter Chung, Magic Toyota Design Team From: Strotkamp Architects David Estes Pages: 1 Date: 15 March2018 Re: BLDG20161684 Building Permit Deferred Submittal Stair Shop Drawings and Calculations ❑ Urgent X For Review ❑ Please Comment ❑ Please Reply In ground Cassette Deferred Submittal for Your Information Quant. Date Description 1 15 Mar 2018 Transmittal 2 13 Mar 2018 Stair calculations 2 11 Jan 2018PSM Review 14 Mar 2018 Stair Shop Drawings In addition to the above documents, all the above information is included in PDF format on an attached Thumb Drive Call ouu have questions, either (206-979-8320) or (425)-316-8979 Strotkamp Architects