Magic Toyota Approved Cost Est. bld20170493.pdfSite Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E
King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Magic Toyota
Location: Edmonds, Washington
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Date: 9/14/2017
Project No.:
Activity No.: Q3 LPW « 0413
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Ai;�FhUVELJ AS NOTED
Date:.____..--�j�l�.-L_ _..-
-,f ose , QovJ A Sk logfm.YVIQ.Y 47
Page 1 of 9
'(vise, Vw A S-Tof--K -f�15 �T SST. � �e ��2�•10
VNb 'i60- � STOW VPM Q6&1012Z = Z1,A0K. Zo
60
King County Bond Quantity Worksheet_phase 2_170914.xls
� 2io,iW"
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
340
1
510,
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
1
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
100
1
11000
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see page 9)
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
King County Bond Quantity Worksheet_phase 2_170914.xls
$ 11,510.00
$ 3,453.00
$ 14,963.00 ' iLO�lO
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/0312015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbinq/Tree Removal
GI - 4
$ 10,000.00
Acre
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate. vinyl coated. 2
GI - 9
$ 1,400.00
Each
Fencing, split rail, Thigh
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12'
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
I GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 16
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 200
SY 1
16470
32,940.00
Monuments, 3' Iona
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Soddinq, V deep, sloped around
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,80000
Acre
Traffic control crew ( 2 flaggers 1
GI - 24
$ 120.00
HR
16
1,920.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
GI - 29
$ 15.00
SF
Page 3of9
SUBTOTAL
1,920.00
32,940.00
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity Worksheet_phase 2_170914.xis Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-200
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
13925
487,375.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
16
200.00
1491
18,637.50
Curb and Gutter, demolition and diSDOSa
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
2314
16.198.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel. 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
15
570.00
Sidewalk, 4" thick, demolition and dispo:
RI - 18
$ 32.00
SY
15
480.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
379
15.539.00
545
22,345.00
Sidewalk, 5" thick, demolition and dispo:
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
5
425.00
Striping, per stall
RI - 22
$ 7.00
ch
�Each
260
1.820.00
Striping, thermoplastic. ( for crosswalk )
RI - 23
$ 3.00
F
215
645.00
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
00
547,445.50
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction Version: 03/02/2015
King County Bond Quantity Worksheet_phase 2_170914.xis Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
I Unit
I Quant.T Cost
QuantT Cost
Quant. Cost
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
2500
70,000.00
HMA Road, 2", 4" rock. Qtv. over 2500 :
RS - 5
$ 21 00
SY
1115
23.415.00
HMA Road, 3", 9 1/2" Rock, First 2500 £
RS - 6
$ 42.00
SY
2500
105,000.00
HMA Road, 3", 9 1/2" Rock, Qty Over 25
RS - 7
$ 35.00
SY
3290
115.150.00
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 S'
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road. 4" rock. First 2500 SY
RS - 12
$ 15.00
SY
1702
25,530.00
Gravel Road, 4" rock, Qtv. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desi
RS - 1 S
Thickened Edge
RS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity Worksheet_phase 2_170914.xis Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid of e.
Acccss Road. R/D
D - 1
5 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
' (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2.300.00
Each
for additional depth over 4'
D - 7
$ 48000
FT
CB Type II, 54" diameter
D - 8
$ 2.500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D-101
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC. 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert. PVC. 6"
D - 19
$ 13.00
LF
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 1900.
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29 1
$ 190.00 1
LF
Culvert, CMP, 60"
D - 30
$ 270.00 1
LF
Culvert, CMP, 72"
D - 31 1
$ 350.00 1
LF
Page 6of9
SUBTOTAL
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity Worksheet_phase 2_170914.xis Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
I Quant.T
Cost
Quant,
Cost
Quant.
Cost
Culvert, Concrete. 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 20500
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert. CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1.436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia. 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator. 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator. 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
'KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King County Bond Quantity Worksheet_phase 2_170914.xls Report Date: 9/14/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. I Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5' top course & 2.5' base coui
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5' base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied bfranchise Utility's Cost Estimate
Utility Pole(s) Relocation UP-1
F Lump Sum
Street Light Poles w/Luminaires UP-2
1 $ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
PCC 6" with 8" base course
WI - 1
$ 38.00
SY
309
11,742.00
Inlet Protection
WI - 2
$ 50.00
Each
23
1.150.00
Soil export
WI - 3
$ 2500
CY
6542
163,550.00
2.5" copper pipe
WI - 4
$ 20.00
LF
225
4,500.00
8" DI pipe
WI - 5
$ 40.00
LF
1136
45.440.00
6" DI pipe
WI - 6
$ 35.00
LF
24
840.00
4" DI pipe
WI - 7
$ 20.00
LF
195
3.900.00
Backflow preventer and vault
WI - 8
$ 7,000.00
Each
1
7,000.00
Fire hydrant w/ valve. valve box. fittings
WI - 9
$ 2,000.00
Each
2
4,00000
8" gate valve
WI - 10
$ 1,250.00
Each
2
2.50000
Tees
WI - 11
$ 850.00
Each
3
2,550.00
Thrust Block
WI - 12
$ 55.00
Each
9
495.00
Bends
WI - 13
$ 150.00
Each
10
1,50000
6" pvc pipe
WI - 14
$ 35.00
LF
357
12.495.00
Clean outs
WI - 15
$ 50000
Each
6
3,000.00
Grease traps
WI - 16
$ 15.000.00
Each
1
15.000.00
Tree grate
WI - 17
$ 400.00
Each
4
1,600.00
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
Page 8 of 9
'KCC 27A authorizes only one bond reduction.
King County Bond Quantity Worksheet_phase 2_170914.xls
3,170.00
951.00
15.539.00 1,168,647.50
4.661.70
GRANDTOTAL: 4.121.00 20,200.70
COLUMN: B C
350,594 25
1,519,241.75
D
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 9/14/2017