Magic Toyota Approved Cost Est. eng20170122.pdfSite Improvement Bond Quantity Worksheet S15 Webdate: 04/03/201E
LM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name:
Location:.
Maoic T
Edmonds, Washinqton
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Date:
Project No.:
Activity No.:
6/8/2017
BLD 20170501, ENG 20170122 E—
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the R,5.Means database.
�d N) vJ lLL 1� �lz To l NC.l�w-.,
5 56PA V' t1A 11h s FM E
v l�O&VIvl'I i j �1 \
Page 1 of 9 A MOVED' AS NOT
t z.�.
��� b�5��1��P date:
� �r �
09 1
King Coutny Bond Quantity Worksheet.xls
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201:
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
20
1
1600
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
560
1
840
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
840
1
1260
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
1
1
3200,
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
100
1
11000
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see paqe 9)
Interceptor swales
$ 3.00
LF
903
1
2709,
Straw Wattles
$ 3.00
LF
165
1
495
Page 2 of 9
King Coutny Bond Quantity Worksheet.xls
ESC SUBTOTAL: $ 21,104.00
30% CONTINGENCY & MOBILIZATION: S 6,331.20
ESC TOTAL: S 27,435.20
COLUMN: A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
I Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
Clear/Remove Brush, by hand
GI-3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
Excavation - bulk
GI-5
$ 2.00
CY
5888
11,776.00
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI-7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI-8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI-9
$ 1.400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Dav
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers 1
GI - 24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
IGI - 28
$ 55.00
SF
Wall, rockery
I GI - 29
$ 15.00
SF
Page 3 of 9
*KCC 27A authorizes only one bond reduction.
King Coutny Bond Quantity W orksheet.xls
SUBTOTAL
11.776.00
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/0312015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000:
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
3310
115,850.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and disposal
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dis osa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
*KCC 27A authorizes only one bond reduction.
King Coutny Bond Quantity Worksheet.xls
SUBTOTAL
115,850.00
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unitj
Quant. 11 Cost
Quant. I Cost
Quant. Cost
ROAD SURFACING No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
HMA 1/2" Overlay 2"
RS - 2
RS - 3
$ 14.00
$ 18.00
SY
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 S)
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SIr
HMA Road, 3", 9 1/2" Rock, Qty Over 2501
RS - 6
RS - 7
$ 42.00
$ 35.00
SY
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 10
RS - 11
$ 33.10
$ 30.00
SY
SY
HMA 3/4" or 1", 4" Depth
RS - 12,
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 12;
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desi,
RS - 1551
Thickened Edge IRS
- 17
$ 8.60
LF
Page 5 of 9 SUBTOTAL
*KCC 27A authorizes only one bond reduction
King Coutny Bond Quantity W orksheet.)ls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Unit Price
Unit
Existing
Right-of-way
Quant. Cost
Future Public
Right of Way
& Drainage Facilities
Quant. I Cost
Private
Improvements
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe. N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road. R/D
D - 1
S 21.00
SY
Bollards - fixed
Bollards - removable
* (CBs include frame and lid)
CB Type I
CB Type IL
CB Type Il, 48" diameter
D - 2
D - 3
D - 4
D - 5
D - 6
$ 240.74
S 452.34
$ 1,500.00
$ 1,750.00
$ 2,300.00
Each
Each
Each
Each
Each
10
8
15,000.00
18,400.00
for additional depth over 4'
D - 7
$ 480.00
FT
28
13,440.00
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
CB Type Il, 60" diameter
for additional depth over 4'
D - 9
D - 10
D - 11
$ 495.00
$ 2,800.00
$ 600.00
FT
Each
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
Cleanout, PVC, 6"
D - 15
D - 16
$ 150.00
$ 170.00
Each
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
Culvert, PVC, 6"
D - 18
D - 19
$ 10.00
$ 13.00
LF
LF
1494
14,940.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31 1
$ 350.00 1
LF
Page 6 of 9 SUBTOTAL
61.780.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
King Coutny Bond Quantity Worksheet.xls Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
1 $ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
1075
$ 25,800.00
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51 1
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2.000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63 1
$ 480.00
Each
Trash Rack, 21"
D - 64 1
$ 550.00
Each
Page 7 of 9
'KCC 27A authorizes only one bond reduction.
King Coutny Bond Quantity W orksheet.xls
SUBTOTAL
25800
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/8/2017
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. I Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours:
PL-2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
I PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Po!e(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 1 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormwater Vault
WI-1
$448,000.00
Each
1
448,000.00
Flow control structure
WI-2
$ 5,000.00
Each
1
5.000.00
24" vented locking lid
W 1 - 3
$ 500.00
Each
5
2.500.00
Inlet Protection
WI-4
$ 50.00
Each
6
300.00
Dewatering
WI-5
$ 25.000.00
Lump
1
25,000.00
Demo eAsting utilities
W 1 - 6
$ 10,000.00
Lump
1
10,000.00
Soil cut and reuse on site
W 1 - 7
$ 12.00
CY
3284
39,408.00
Soil export
W 1 - 8
$ 25.00
CY
2604
65,100.00
Culvert, HDPE, 8"
WI-9
$ 25.00
LF
7
175.00
Trench Drain
wi -10
$ 80.00
LF
801
6,400.00
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30%CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
B
-P FE- L00b I r-J Bomb
CAL-(-XLAWW Tau-
*KCC 27A authorizes only one bond reduction.
King Coutny Bond Quantity Worksheet.xls
C
-�81�69-89
24-5 TO'
1.062.215.70
D j
S-�UfzNl = lZ�e,�tSS � �°lo
nricrlErE+u,� Unit prices updated: 03/02/2015
Version: 03/02/2015
1. row Report Date: 6/8/2017