Loading...
Magic Toyota Building Addition Preliminary Report.pdf 8410 154 Avenue NE th Redmond, Washington 98052 425.861.6000 December 20, 2016 Magic Toyota c/o Strotkamp Architects P.O. Box 501 Burlington, Washington 98233 Attention: Tom Strotkamp and David Estes Subject: Preliminary Geotechnical Report Magic Toyota Building Replacement Edmonds, Washington File No. 11805-001-04 INTRODUCTION GeoEngineers, Inc. (GeoEngineers) is pleased to present the results of our preliminary geotechnical evaluation in support of the Magic Toyota Building Replacement project. The project site is located at 21300 Highway 99 in Edmonds, Washington. The location of the site is shown on the Vicinity Map, Figure 1. The location of the building replacement relative to the existing building and features is shown on the Site Plan, Figure 2. The purpose of our preliminary report is to summarize the subsurface conditions and provide a preliminary geotechnical evaluation of foundation support and infiltration feasibility for the new facility. We understand that the new building will be about 260 feet north-south by about 150 feet east-west. The new structure will essentially replace the footprint of the existing dealership building, with an extension on the north side. Rooftop parking will cover a portion of the new building. Existing grades, which slope up to the north, are such that a retaining wall about 10 feet in height will be required along the north building wall. An older building in the northeast parcel will be demolished and the site grades revised for construction of new parking in this area. PREVIOUS STUDIES Our previous experience at the site includes environmental and geotechnical studies for the site and parking garage to the south, and geotechnical observation services during construction of the garage. Our current exploration plan was developed based on review of our previous report and on the extend of the new building, 1400 Highway 99, Edmonds, 14, 2006. Magic Toyota|December 20, 2016Page 2 FIELD EXPLORATIONS AND LABORATORY TESTING Field Explorations Subsurface conditions were evaluated by reviewing previous subsurface data and completing four supplemental borings to depths of 16.5 to 41.5 feet. The approximate location of the explorations is shown in Figure 2. A detailed description of the field exploration program and the logs of the explorations are presented in Appendix A. Laboratory Testing Selected samples were tested for the determination of moisture content, fines content (material passing the U.S. No. 200 sieve), grain size distribution (sieve analysis), and plasticity tests. The tests were performed in general accordance with test methods of the American Society for Testing and Materials (ASTM). A description of the laboratory testing and the test results are presented in Appendix B. SITE CONDITIONS Geology The Puget Sound basin is a region of Quaternary (last 3 million years) sediments that range in thickness between 800 and 2,400 feet. The basin area has been repeatedly overridden by Pleistocene (between 11,000 and 3 million years ago) continental glacial ice depositing till, glacial sand and gravel. As the glacial ice retreated to the north, glaciofluvial sediment was deposited in the outwash channels. The most recent glacial cycle of sediment deposits is referred to as the Vashon Drift, occurring between 13,500 and 15,000 years ago. We reviewed a Unites States Geological Survey Geological Map of the Edmonds East and Edmonds West Quadrangles, Snohomish and King Counties, Surficial geologic deposits in the site vicinity are mapped as recessional outwash, glacial till, and advance outwash. Recessional outwash typically consists of sand and gravel with varying amounts of silt that was deposited by meltwater from the stagnating and receding glacier. These soils are typically medium dense. Glacial till is a heterogeneous mixture of sand, gravel, cobbles and occasional boulders in a silt and clay matrix that was deposited beneath a glacier. Advance outwash typically consists of well-stratified sand with variable amounts of gravel and cobbles. The advance outwash is usually exposed where the overlying glacial till cap has been eroded away, typically in ravines and bluff margins. Both the glacial till and advance outwash have been overridden by thousands of feet of ice, and are typically dense to very dense. The Whidbey Formation underlies the advance outwash and typically consists of dense sands and gravels overlying or interbedded with stiff to hard silts. Surface Conditions The project area extends about 400 feet in the north-south direction and varies from about 420 to 300 feet east-west, including parking areas which will be reconfigured. The new building will be about 260 feet in length north-south and 150 feet in width, east-west. Existing structures include the existing dealership and repair shop, and a small building in the northeast corner. The remainder of the area is covered with asphalt File No. 11805-001-04 Magic Toyota|December 20, 2016Page 3 pavement except for a small slope between the lot at the northeast corner and the surrounding dealership parking lot. The slope is vegetated with grass and shrubs. The original parking lot south of the dealership was constructed by placing up to 10 to 12 feet of fill. The south parking lot now slopes gently down to the south to the new parking garage situated across the southwest portion of the property. Existing ground surface elevations range from approximately Elevation 378 feet in the lower parking lot immediately south of the dealership building to Elevation 388 feet at the north border of the site near 212 Street SW. Existing site features are shown in the Site Plan, Figure 2. th Subsurface Conditions The borings encountered 2 to 4 inches of asphalt pavement underlain by a thin layer of crushed rock base course or soil. Borings GEI-1 and GEI-2 encountered very dense silty sand with gravel (glacial till) underlying the pavement section. Borings GEI-3 and 4, located on the south side of the dealership building, encountered 8 to 10 feet of fill consisting of medium dense to dense silty sand with gravel. The fill is underlain by glacial till. Hard silt of the Whidbey Formation was encountered beneath the till in borings GEI-2 and GEI-3 at an elevation of approximately 356 to 360 feet (15 to 25 feet below existing ground surface). Very dense gravel was encountered at a depth of about 14 feet in boring GEI-4. This may be a pocket of cleaner, courser material deposited during the glaciation process. Groundwater Conditions Groundwater was not encountered in borings GEI-1 and GEI-2, which encountered glacial till beneath the pavement surface. The fill was wet in boring GEI-3, which we interpret to be perched groundwater above the relatively impermeable glacial till. The very dense gravel in boring GEI-4 was also wet. We anticipate that the groundwater is perched on the very dense glacial deposits and will fluctuate as a function of precipitation and other factors. PRELIMINARY FOUNDATION RECOMMENDATIONS We conclude that the site is suitable for construction of the proposed facility replacement. We anticipate that subsurface soils for foundation support will vary from very dense glacial till across most of the footprint, to medium dense fill which is likely present across the southern portion of the proposed footprint. Shallow foundations are suitable for support of the new building. Building footings may be supported on dense native soils or on a minimum 2-foot thickness of structural fill. Footings supported as recommended above can be designed for an allowable soil bearing pressure of 3,000 pounds per square foot (psf) for dead plus long-term live loads. A higher allowable soil bearing pressure of 6,000 psf may be used for the north portion of the site where very dense glacial till is present and where the foundations will be situated at least 3 feet below existing grades (i.e. cut into the slope). INFILTRATION CONSIDERATIONS At this time, in our opinion infiltration facilities are not feasible because of the presence of the very dense glacial till across most of the site. Infiltration is also not recommended in fill soils. Glacial till is considered as a hydraulic restriction layer per the 2012 Stormwater Management Manual resulting in conventional infiltration not being feasible. Native glacial till soils encountered at the site are relatively impermeable, File No. 11805-001-04 SITE ! µ 2,00002,000 Feet Vicinity Map Notes: 1. The locations of all features shown are approximate. Magic Toyota Building Replacement 2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. Edmonds, Washington cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the officialrecord of this communication. Figure 1 Data Source: Mapbox Open Street Map, 2016 Projection: NAD 1983 UTM Zone 10N Figure 2 Magic Toyota Building Replacement Edmonds, Washington Site Plan B-4 B-3 Boring by GeoEngineers, 2016Boring by GeoEngineers, 2006 B-2 y a w h g i H c i f i c a P Legend GEI-4 AA B C D E G H GEI-3 11 1 GEI-1 B-1 2 5 . 2 1 3 3 4 4 5 5 6 6 6060 7 7 Feet 8 8 0 9 9 GEI-1 B-1 0 1 0 1 GEI-2 1 1 1 1 2 1 2 1 document. GeoEngineers, Inc. cannot guarantee the accuracy GeoEngineers, Inc. and will serve as the official record of this and content of electronic files. The master file is stored by 2.This drawing is for information purposes. It is intended to 1.The locations of all features shown are approximate. Background from Strotkamp Architects dated 10/31/16. assist in showing features discussed in an attached W S t S h t2 1 2 communication. Data Source: Notes: P:\\11\\11805001\\CAD\\04\\GeoTech\\11805000104_F02_Site Plan.dwg TAB:F02 Date Exported: 12/19/16 - 11:48 by hmara AA PPENDIX Field Explorations Magic Toyota|December 20, 2016Page A-1 APPENDIX A FIELD EXPLORATIONS Subsurface conditions were explored at the site by drilling four borings (GEI-1 through GEI-4). Borings GEI-1 through GEI-4, excluding boring GEI-2, were advanced to depths between 16½ feet below the ground surface (bgs) and boring GEI-2 was advanced to a depth of 41½ feet bgs. The subsurface explorations were completed by Geologic Drill, Inc. on December 12, 2016. The locations of the explorations were estimated by taping/pacing from site features. The approximate locations of the explorations are shown on the Site Plan, Figure 2. Borings Borings were completed using truck-mounted, continuous-flight, hollow-stem auger or mud-rotary drilling equipment. The borings were continuously monitored by a representative from our firm who examined and classified the soils encountered, obtained representative soil samples, observed groundwater conditions and prepared a detailed log of each exploration. We obtained disturbed soil samples from the borings using a 1.5-inch-inside-diameter split-spoon standard penetration test (SPT) sampler driven into the soil using a 140-pound hammer free-falling a distance of 30 inches. The number of blows required to drive the sampler the last 12 inches is recorded on the logs as the blow count. Disturbed samples were collected at 2½- to 5-foot vertical intervals. The blow counts are shown on the boring logs at the respective sample depths. Soils encountered in the borings were visually classified in general accordance with the classification system described in Figure A-1. A key to the boring log symbols is also presented in Figure A-1. The logs of the borings are presented in Figures A-2 through A-5. The boring logs are based on our interpretation of the field and laboratory data and indicate the various types of soils observed. The logs also indicate the depths at which these soils or their characteristics change; although, the change may actually be gradual. If the change occurred between samples, it was interpreted. The densities noted on the boring logs are based on the blow count data obtained in the borings and judgment based on the conditions observed. The cuttings from the drilling were removed from the site. Observations of groundwater conditions were made during drilling. The groundwater conditions encountered during drilling are presented on the boring logs. Groundwater conditions observed during drilling represent a short-term condition and may or may not be representative of the long-term groundwater conditions at the site. Groundwater conditions observed during drilling should be considered approximate. GeoEngineers, Inc. File No. 11805-001-04 AB PPENDIX Laboratory Testing Magic Toyota | December 20, 2016 Page B-1 APPENDIX B LABORATORY TESTING soil samples were selected for laboratory tests to evaluate the pertinent geotechnical engineering characteristics of the site soils and to confirm or modify our field classifications. Our testing program consisted of the following: two chunk moisture density tests (MD), presented on the boring logs in Appendix A next to the sample tested; three percent passing the U.S. No. 200 Sieve; one sieve (grain-size distribution) analyses; and two Atterberg limits tests. Tests were performed in general accordance with test methods of ASTM International (ASTM) or other applicable procedures. The following sections provide a general description of the tests performed. Moisture Content and Dry Density The moisture content and/or dry density of selected samples was determined in general accordance with ASTM D-2216 and D-2937, respectively. The test results are used to aid in determining the moisture content of the soil, soil classification and correlation with other pertinent engineering soil properties. The densities were estimated measuring the weight and dimensions of large intact soil samples. The test results are presented on the exploration logs in Appendix A at the respective sample depths. Percent Passing U.S. No. 200 Sieve (%F) of coarse- and fine-grained particles in the soil. The percent passing value represents the percentage by weight of the sample finer than the U.S. No. 200 sieve. These tests were conducted to verify field descriptions and to estimate the fines content for analysis purposes. The tests were conducted in accordance with ASTM D 1140, and the results are shown on the exploration logs in Appendix A at the respective sample depths. Sieve Analysis Sieve analyses were performed on selected samples in general accordance with ASTM D 422. The wet sieve analysis method was used to determine the percentage of soil greater than the U.S. No. 200 mesh sieve. The results of the sieve analyses were plotted, were classified in general accordance with the Unified Soil Classification System (USCS), and are presented in Figure B-1. GeoEngineers, Inc. File No. 11805-001-04 Magic Toyota | December 20, 2016 Page B-2 Atterberg Limits Testing Atterberg limits testing was performed on selected fine-grained soil samples. The tests were used to classify the soil as well as to evaluate index properties. The liquid limit and the plastic limit were estimated through a procedure performed in general accordance with ASTM D 4318. The results of the Atterberg limits testing are summarized in Figure B-2. GeoEngineers, Inc. File No. 11805-001-04 0.001 were . processes they which or operations on SILT OR CLAY sample 0.01 separate specific Silty sand (SM) Soil Description by the generated to only or applicable locations, #200 0.1 #100 are or FINE results depths #60 GRAIN SIZE IN MILLIMETERS Test times, #40 . Inc other SAND U.S. STANDARD SIEVE SIZE GeoEngineers, MEDIUM #20 at obtained 1 . 6913 Moisture #10 (%) of samples 11.7 D COARSE approval ASTM other with #4 written accordance any of FINE without 10 representative (feet) Depth general GRAVEL 5 full, in in except COARSE obtained as interpreted Boring Number reproduced, were 1 - 100 results be GEI not COBBLES be should analysis not may and size report performed, grain Symbol This The 1000 : Note 20 10090807060504030100 PERCENT PASSING BY WEIGHT : 12/16/16 Sieve Analysis Results Date Exported Magic Toyota Building Replacement Edmonds, Washington 04 - 001 Figure B-1 - 11805 2 - Figure B Toyota Building Replacement Atterberg Limits Test Results Edmonds, Washington 100 90 Magic 80 OH or MH CH or OH 70 60 PLASTICITY CHART Soil Description LIQUID LIMIT able Silt (ML) only to the specific sample on which they were performed, and should not be interpreted as representative of any other 50 lic Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are app samples obtained at other times, depths or locations, or generated by separate operations or processes. ML or OL The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318. 40 CL or OL Plasticity 30 Index (%) 16 20 Liquid ML Limit (%) 45 - CL 10 Moisture Content (%) 28.6 0 (feet) Depth 6050403020100 25 PLASTICITY INDEX Number Boring 2 - GEI Symbol XX Date Exported: 06/18/16-XXX-XXXX