Loading...
Main St-8723-PLN20080023-TIA.pdfName of Proposed Project: Owner/Applicant: cmk 6JA)A\, Name -10 t S�1, e" V -Q to Strect/Mailing Address City State Zip "telephone: Applicant Contact Person: Name Street/Mailing Address City "telephone: Traffic Engineer who prepared the Traffic Impact Analysis: Firm Name I. PROJECT DESCRIPTION Contact Name �1� Telephone Zip a. Street address Qfknown): msA b. Location: (Attach a vicinity map and site plan.) c. Specify existing land use: C V� d. Specify proposed type and size of development: - _— 5 \ A c. When will the project begin construction and when will it be completed? 'Z-oOq 00 1 f. Define proposed access locations: g. Define proposed sight distance at site egress locations: 154 we-si 2. TRIP GENERATION a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT, b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d. State assumptions and metbodology for internal, link -diverted or passby trips: D-1— 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service Analysis; • Existing Conditions LOS Delays • Year of Opening LOS Delays • Five Years Beyond Change of Land Use LOS . Delays (Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer.) c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 95% • Existing Conditions • Year of Opening • Five Years Beyond Change of Land Use e. 3f appropriate, state stop sign and signal warrants: f. Summarize local accident history: pam-'A 5. TRAFFIC VOLUMES a. Describe existing ADT and peak -Dour counts, including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak. -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations_ Existing LOS: Existing Condition: Year o OpeningLOS:,..,...� With Project: Without Project: Pap -e 4 Five Years After Oneninjz LOS: With Project: Without Project: Note any assumptions/variations to standard analysis default values and justifications: 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. SAE,NC;RU-YwcMChy ProjWATIA GuidcHnts%TraflmpAnalyWork 9-04.4nc Pate 5