Loading...
Maint. Bond Release Correction - 09.10.2015.pdf From:McConnell, Jeanie To:"Wayne Potter" Cc:"Ricka.Gerstmann@wafd.com";Johns, Kristin;Tom Barghausen;Sandy Bailey;Rivera, Chris;Johns, Kristin Subject:RE: Willowdale Maintenance Bond Release - bld20080847 Date:Thursday, September 10, 2015 4:59:58 PM Attachments:image002.png image005.png Hi Wayne, We did get this inspected. Now that the striping is done it has become apparent that the pavement section for the parking stalls closest to the existing living units is not wide enough and therefore, the striping for those stalls does not meet Edmonds standards. The width is a total of 16-feet instead of 17-feet which would be required to achieve two 8.5’ stalls. In addition, the striping does not provide the required stall length of 16.5’. If the site allows, two-feet could overhang the parking stall, so the minimum length of the stripe from face of bumper block would need to be 14.5’. Photos are provided below. Please let me know if you have any questions. Thank you, Jeanie From: Wayne Potter \[mailto:wpotter@novastardev.com\] Sent: Thursday, September 10, 2015 5:42 AM To: McConnell, Jeanie Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Willowdale Maintenance Bond Release - bld20080847 (¨ *¤ ­¨¤Ǿ )  ¬ ¥®««®¶¨­¦ ´¯ ®­ ³§¤ ¨­²¯¤¢³¨®­  ­£ ±¤«¤ ²¤ ®¥ ³§¤ 7¨««®¶£ «¤ - ¨­³¤­ ­¢¤ "®­£ȁ # ­ ¸®´ ¦¨µ¤ ¬¤  ­ ´¯£ ³¤Ȉ 4§ ­ª ¸®´ȁ Wayne ______________________________________________________________ 'ȁ 7 ¸­¤ 0®³³¤± Ȟ 6¨¢¤ 0±¤²¨£¤­³ Ȟ .®µ ²³ ± $¤µ¤«®¯¬¤­³Ǿ )­¢ȁ ΐΗΑΐΔ ΖΑ­£ !µ¤ȁ 3®´³§Ǿ +¤­³Ǿ 7 ²§¨­¦³®­ ΘΗΏΒΑ ȨΓΑΔȩ ΕΔΕ ȟ ΖΓΒΔ $¨±¤¢³ Ȟ ȨΑΏΕȩ ΑΔΔȃΖΐΏΕ #¤«« From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\] Sent: Wednesday, August 19, 2015 4:11 PM To: Wayne Potter Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey; McConnell, Jeanie Subject: RE: Willowdale Maintenance Bond Release - bld20080847 Great, thank you. I will get a re-inspect of the site scheduled and will follow-up with you soon. -Jeanie From: Wayne Potter \[mailto:wpotter@novastardev.com\] Sent: Wednesday, August 19, 2015 11:29 AM To: McConnell, Jeanie Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Willowdale Maintenance Bond Release - bld20080847 Hi Jeanie, We have completed the punchlist items for the Willowdale Maintenance Bond Release (See attached photo’s). Please re-inspect and if acceptable, please release the Maintenance Bond for the Willowdale Townhomes. Please call if you have any questions. Thank you. Respectfully, Wayne ______________________________________________________________ 'ȁ 7 ¸­¤ 0®³³¤± Ȟ 6¨¢¤ 0±¤²¨£¤­³ Ȟ .®µ ²³ ± $¤µ¤«®¯¬¤­³Ǿ )­¢ȁ ΐΗΑΐΔ ΖΑ­£ !µ¤ȁ 3®´³§Ǿ +¤­³Ǿ 7 ²§¨­¦³®­ ΘΗΏΒΑ ȨΓΑΔȩ ΕΔΕ ȟ ΖΓΒΔ $¨±¤¢³ Ȟ ȨΑΏΕȩ ΑΔΔȃΖΐΏΕ #¤«« From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\] Sent: Wednesday, August 05, 2015 3:25 PM To: Wayne Potter Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Willowdale Maintenance Bond Release - bld20080847 Wayne, Thank you for the email. I was waiting for feedback from our Operations Maintenance group, which I have now received. Please find attached a couple correction items to be addressed prior to release of the maintenance bond. Regards, Jeanie From: Wayne Potter \[mailto:wpotter@novastardev.com\] Sent: Tuesday, August 04, 2015 3:14 PM To: McConnell, Jeanie Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Willowdale Maintenance Bond Release - bld20080847 Hi Jeanie, Following-up on my e-mail below. Thanks. Wayne ______________________________________________________________ 'ȁ 7 ¸­¤ 0®³³¤± Ȟ 6¨¢¤ 0±¤²¨£¤­³ Ȟ .®µ ²³ ± $¤µ¤«®¯¬¤­³Ǿ )­¢ȁ ΐΗΑΐΔ ΖΑ­£ !µ¤ȁ 3®´³§Ǿ +¤­³Ǿ 7 ²§¨­¦³®­ ΘΗΏΒΑ ȨΓΑΔȩ ΕΔΕ ȟ ΖΓΒΔ $¨±¤¢³ Ȟ ȨΑΏΕȩ ΑΔΔȃΖΐΏΕ #¤«« From: Wayne Potter Sent: Wednesday, July 22, 2015 2:09 PM To: 'McConnell, Jeanie' Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Willowdale Maintenance Bond Release - bld20080847 Hi Jeanie, Our project engineer, Barry Talkington, P.E., with Barghausen Consulting Engineers, Inc. took a look at the inspectors drainage concerns referenced in your e-mail below for Willowdale Townhomes. As indicated by your inspector, the extruded curb in these areas were not been installed upon the completion of the improvements and Building 1. Currently, water from these roadways (which is an insignificant amount) is conveyed to the vacant lots. The water that sheet flows to these lots is essentially being held by the onsite vacant pads in which the water eventually perks and/or evaporates (see attached photo’s). Because the amount of water going to these areas does not have enough volume to overflow offsite, we believe that the best course of action is to have the curbing for Driveway B and C (and parking area) installed during the construction of Buildings 2,3, and 4. In the current condition, the water sheet flowing to the vacant lots is not causing any impact to surrounding property owners. Per you e-mail below, when do you expect to have additional comments available regarding the release of the maintenance bond? Please advise. Thanks. Wayne ______________________________________________________________ 'ȁ 7 ¸­¤ 0®³³¤± Ȟ 6¨¢¤ 0±¤²¨£¤­³ Ȟ .®µ ²³ ± $¤µ¤«®¯¬¤­³Ǿ )­¢ȁ ΐΗΑΐΔ ΖΑ­£ !µ¤ȁ 3®´³§Ǿ +¤­³Ǿ 7 ²§¨­¦³®­ ΘΗΏΒΑ ȨΓΑΔȩ ΕΔΕ ȟ ΖΓΒΔ $¨±¤¢³ Ȟ ȨΑΏΕȩ ΑΔΔȃΖΐΏΕ #¤«« From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\] Sent: Wednesday, July 15, 2015 12:04 PM To: Wayne Potter Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey; McConnell, Jeanie Subject: Willowdale Maintenance Bond Release - bld20080847 Hi Wayne, I wanted you to know I’m working on this. I should have more on this for you early next week. One of the things that our inspector noticed is that the curb was not installed along driveway B (north and south sides), driveway C, or the parking area near the entrance. If the curb is needed to appropriately direct stormwater flows, then it should be installed. If the stormwater flows are making it the stormwater management systems without the curb then I’m okay with deferring the installation until the future site development. Thanks, Jeanie From: Wayne Potter \[mailto:wpotter@novastardev.com\] Sent: Thursday, July 02, 2015 12:32 PM To: McConnell, Jeanie Cc: 'Ricka.Gerstmann@wafd.com'; Johns, Kristin; Tom Barghausen; Sandy Bailey Subject: RE: Copy of Bond Release (City File No. PLN20080001) Importance: High Hi Jeanie, I am following-up on the release of the R/W Maintenance Bond for the Willowdale Townhomes project (see attached). The Landscape Maintenance bond has been released. Do you have an idea of when you may be looking into this bond release? Please advise. Thanks. Wayne ______________________________________________________________ 'ȁ 7 ¸­¤ 0®³³¤± Ȟ 6¨¢¤ 0±¤²¨£¤­³ Ȟ .®µ ²³ ± $¤µ¤«®¯¬¤­³Ǿ )­¢ȁ ΐΗΑΐΔ ΖΑ­£ !µ¤ȁ 3®´³§Ǿ +¤­³Ǿ 7 ²§¨­¦³®­ ΘΗΏΒΑ ȨΓΑΔȩ ΕΔΕ ȟ ΖΓΒΔ $¨±¤¢³ Ȟ ȨΑΏΕȩ ΑΔΔȃΖΐΏΕ #¤«« From: Johns, Kristin \[mailto:Kristin.Johns@edmondswa.gov\] Sent: Wednesday, June 17, 2015 10:05 AM To: Wayne Potter Cc: 'Ricka.Gerstmann@wafd.com' Subject: Copy of Bond Release Good morning, Attached is a copy of the Landscape Bond release being mailed out today. If not already, Jeannie McConnell will be contacting you regarding the ROW Maintenance Bond. Thank you, Kristin Johns City of Edmonds Senior Permit Coordinator 425.771.0220 ext. 1261 Kristin.johns@edmondswa.gov Development Services Hours: Monday & Tuesday 8:00 AM – 4:30 PM RD AS OF JUNE 3 - WEDNESDAY - CLOSED Thursday & Friday 8:00 AM – 4:30 PM