Maple St-527_Borich_bld20080499_3 unit condo_2.pdf DATE: November 5, 2008 TO: Joe Molina, TGB Architects Jmolina@tgbarchitects.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20080499 Project: Borich – 3 unit Condo Project Address: 527 Maple Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. Review 1 – August 13, 2008 Review 2 – November 5, 2008 GENERAL 11/5/08 – Thank you for submitting a cost estimate. Please revise as follows: 1. a.The spreadsheet used in preparing the cost estimate was last updated by King County in 2002. Please adjust unit prices to reflect a 27.8% increase to 2008. b.Revise Erosion Control items to include a total of 3 catch basin inserts. c.Revise Storm Drainage Items to include: An estimate to connect the storm outfall to the existing CB in the City · right-of-way. Traffic Control · d.Revise Sanitary Sewer Items to include traffic control for the installation of the sewer lateral and connection to the City main. e.Revise Water Main Items to include: Domestic & irrigation water services within the right-of-way. · Revise tapping tee and valve line item to be consistent with plans. 1 (one) · 6” tapping tee and valve will be required for the fire hydrant. 1 (one) 2” tapping tee and valve will be required for the fire line. 4 (four) tapping tees will be required for the 1” services. Traffic control · f.Revise Street Items to include: Maple St-527_Borich_bld20080499_3 unit condo_2 Page 1 of 3 Hand form concrete curb and gutter within the right-of-way. Extruded · curb is not permitted. 7’ wide and 5 ½” thick sidewalk · g.Revise Misc. Items to include: Trash Enclosure · Parking striping · 8/13/08 comment - Please provide an itemized cost estimate for both on-site and off-site (right- of-way) improvements, including traffic control. A bond is required to be placed for all right-of-way improvements. The amount of the bond o will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Marie Harrison, Permit Coordinator – 425-771-0220 or Harrison@ci.edmonds.wa.us Inspection fees for this project will be calculated at 2.2% of the 120% City approved o estimate for all improvements. C1.1 – COVER SHEET & GENERAL NOTES ok 1. ok 2. ok 3. C2.1 – TEMPORARY EROSION CONTROL PLAN 11/5/08 – Response letter states “Architect/Owner will obtain construction easement as 1. required”. Copy of easement shall be provided to the City prior to building permit issuance. 8/13/08 comment - Plans indicate that an existing rockery on the property to west will be removed. Also, a retaining wall will be constructed on the subject property at the property line. Please obtain a construction easement or other agreement from the neighbor for the required activities and provide of the recorded easement/signed agreement to the City. ok 2. C3.1 – GRADING, DRAINAGE & SITE DEVELOPMENT PLAN ok 1. ok 2. ok 3. ok 4. ok 5. ok 6. C4.1 – WATER & SEWER PLAN ok 1. ok 2. ok 3. ok 4. Comments 1 e-mailed November 5, 2008 Page 2 of 3 5.A 2” resilient gate valve shall be shown at the water main on the 2” fire line connection. 6.A three valve cluster will be required to isolate the fire hydrant connection to the City main. Please refer to City standard detail E7.18.1 for valve cluster connection requirements. The cluster shall be at least two feet east of the fire line tap on the water main to provide sufficient room to install the long body sleeve as required by E7.18.1. 7.Water main serving fire hydrant shall be 6” DIP and a 6” resilient gate valve shall be installed per standard detail. Please revise plans accordingly. 8.A Double Check Detector Assembly (DCDA) shall be installed on the fire line, at the property line, per City standard detail E7.7.1. Please revise plan notes and detail. 9.A Double Check Valve Assembly (DCVA) is required on the irrigation line per detail E7.7. Please revise plan notes and reference detail. 10.The standard detail title blocks provided on this plan sheet state “City of Edmonds Std. Sewer Cleanout detail for both the DCVA and Fire Hydrant Assembly. Please revise. R1.00 – TRAFFIC CONTROL & HAUL ROUTE PLAN 1.ok 11/5/08 – TCP has been revised to show complete closure of the westbound travel lane. It 2. appears as though there is sufficient lane width on the south side of Maple Street to maintain one eastbound and one west bound travel lane (minimum lane width shall be 10’). If there is insufficient room to maintain EB & WB traffic, then flaggers will be required. Please revise the TCP as follows: TCP without flaggers and two lanes open on south side of Maple Street a.Add signage for west bound traffic – Right Lane Closed ahead and Lane Shift. b.Add signage for east bound traffic – Lane Shift c.Add No Parking signage on north and south sides of Maple Street. d.Indicate placement of traffic cones to delineate two (2) 10’ travel lanes on south side of Maple Street. TCP with flaggers and only one lane of traffic open on south side of Maple Street a.Add advance warning signage for Flaggers and Lane Closure. b.Add No Parking signage on north side of Maple Street. Parking on south side of Maple Street to remain open. 8/13/08 comment - Show parking lane on plans. For truck parking and the sewer tie in it appears that only the parking lane will be blocked. A minimum 10’ travel lane shall remain open. If this is not possible then a lane closure will be required and another traffic control plan shall be submitted for review and approval. 11/5/08 – Please remove note #6 from plans. The frontage will be removed and replaced. 3. Coordination with the City is to happen during this plan review and not at a later date. ok 4. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Comments 1 e-mailed November 5, 2008 Page 3 of 3