Margo Day Project Summary June 6 8214.pdf/1
structLtrlil Dcstgi1 Associatcs
h;r1,11i(1C0Y1g,�Irllcllt es to Lens/
Issued: June 4, 2019
Revised: June 6, 2019
Client: Corry Morris
Subject: Project Summary
Subject Address: 219 Skyline Dr. Edmonds, WA 98020
Permit No. BLD 17-17 l4
SDA Ref. # 8214
To whom this may concern:
SI)<i 8214
JUN 0 6 2019
The client has informed Structural Design Associates [SDA] of the project completion at the
subject address.
SDA has issued a final structural drawing set with various as -built revisions (including: 5-1.0,
A1051, S-3.0 to S-8.0, revised Oct. 1, 2018 and Al0) to A]04, 106— A 108, 5-2.0, & 5-8.0 revised
Oct. 121, 2018) and a supporting calculation package. The drawings and calculation package were
reviewed by a licensed third -party review agency. SDA has visited the site on July 25, 2018 and
Aug. 10, 2018 to inspect the general requirements for the "West" ordinary steel moment frames
only. The "West" frame has been visually assessed and deemed in conformance to the drawings
referenced above. All other on -site inspections including but not limited to foundation
reinforcement, framing, sheathing, and holdowns were conducted by the Building Official.
Please contact this office if you have any questions concerning this letter, or for any other
assistance.