Mayes Testing - detention vault.pdfAYESTESTING ENGINEERS,
Seatfie Office
., =
20225 Gedar Valley Road
suite 110
Lynn Hood, WA 95035
Project No.
L11583
fa 4257x 425.744 5.1735.173
fa7
Project
Premier Orthopedic Group Building
Address
21401 72nd Avenue West, Edmonds, WA
Tacoma Office
Permit No.
BLD20110815, BLD20110816
She 2raoon,away
Bldg Dept.
City of Edmonds
TamTe,WAW499
ph 253.584.3720
fax 253.584 3707
Owner
First Western Development Services
Architect
Donahou Design Group
PoaandofFrce
Engineer
CT Engineering
7911 NE 33rd Dr�e
suile190
Contractor
Pennon Construction Company, Inc.
Podand, OR 97211
ph 503,281.7515
fax 503.281.7579
Record No.
014
Date
1/13/2012
Weather
Clear
Inspection
Auger Cast Piles and Rebar
Sample(s)
(4) 4x8" Cylinders
Permit No. BLD20110815
1. Auger cast pile inspection of 20" diameter piles: Grout placed at Pile #'s 761, 712, 729, 722,
723, 718, 717, 716 and 603. Reinforcing steel for pile cages placed per 51.0219, RFi #002
and RFI #015. Grout delivered by Cadman and pumped to placement. Mix #5600149
placed for F'c=5000 psi grout at 28 days. Water -cement ratio: .44 Total yardage placed: 45
cubic yards.
2. Rebar inspection of detention vault walls: Reinforcing steel & water stop placed per vault wall
sections of S2.01.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Jim Gibson
Reviewed By:
ij
r
Timothy G. Beckerle, P.E.
Branch Manager
Page I of I
MAYESTESTING ENGINEERS, MC.
seaf8e Office
20225 Cec ar Valley Road
Suite 110
LVnnvvocd, WA98036
ProProject No.
1
L11583
ph 425.7429380
fax 425.745.1737
Project
Premier Orthopedic Group Building
Address
21401 72nd Avenue West, Edmonds, WA
Tacoma Office
Permit No.
BLD20110815, BLD20110816
10029
�� 2 S. away
Bldg Dept,
City of Edmonds
Tacon-o, WA 98499
ph 253.584.3720
fax 253.584.3707
Owner
First Western Development Services
Architect
Donahou Design Group
PatlandOfiice
Engineer
CT Engineering
7911 NE
sui� 19033rd Drive
Contractor
Pennon Construction Company, Inc.
Portland, OR 97211
ph 503.281.7515
rax 503281.7579
Record No.
015
Date
1123112
Weather
Sunny
Inspection
Reinforced Concrete
Sample(s)
(6) 4x8" cylinders
Permit No. BLD20110815
Observed the placement of and sampled from (18) total cubic yards of project approved CNW
concrete mix 02600 placed for Detention Vault Walls from top of footing to the bottom of vault lid.
Concrete was placed by pump with mechanical consolidation. Four 4x8 cylinders were cast for
4000 F'c compliance testing and two field cure cylinders were cast at the contractor's request.
Reinforcing steel was inspected per details on 52.01 of approved plans and Concrete Technology
Corp. placement plan, sections and General Notes Drawing No P-1.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Keith Dohrmarl
Reviewed By:
Michael S. Dolder, P.E.
Vice President
Page 1 of 1