Mayes Testing.pdfMAYES TESTING ENGINEERS, INC.
Project No.
L14156
Project
Swedish Edmonds Water Main Extension
Address
7324 216th Street SW, Edmonds, WA
Permit No.
ENG20140039
Bldg Dept.
City of Edmonds
Owner Swedish Edmonds
Engineer KPFF
Contractor Andersen Construction and Green River Construction, Inc.
Record No. 019
Date 5/30/14
Weather Clear
Inspection Asphalt Density
Sample(s) (1) asphalt sample
swftleolrtr:e
20225Ce larvaley
Road
Stile 110
Lyrrmcod, WA98036
ph 425.742.9350
fox 425.745.1737
Tacoma 011k+e
10029 S. Tacoma Way
SUL, E2
Tacoma, WA98499
ph 253 584 3720
fax253.584.3707
Pb►dand0fte
7911 NE 33rd Drive
Stihe 190
Portland, OR 97211
ph 503281.7515
ftc 503281.7579
Performed in -place density test of the 2" top wear course paving on 76th Ave W. in northbound lane
from Stations 299+60 to 303+40 per Detail 4/C-212 (see Fig. 1). Obtained one sample of the 1/2"
HMA delivered on site from the Cemex Kenmore batch plant for Rice density testing. The
laboratory Rice density was 157.1. Approximately 90 tons of asphalt were placed today. The
asphalt was placed with a Bomag BF-814 paving machine and compacted with a Bomag BW 120-
AD and a Bomag BW 900-50 double -drum with vibrating rollers (see attached Asphalt Field
Density Test Report for locations and results). The asphalt met the 91 % compaction specification.
approximately Station 303+40.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Carl Harrington
Reviewed By:
Robert Gardner
Senior Project Manager
Information in this report applies only to the actual items inspected or tested and shall not be reproduced except in full, without the approval of Mayes Testing Engineers, Inc.
Page 1 of 1
MA Y,ES TESTING ENGINEERS, INC.
20225 Cedar Valley Road, Suite 110
Ph 425.742.9360
Lynnwood, WA 98036
Fax 425.745.1737
Asphalt
10029 S. Tacoma Way, Suite E-2
Ph 253.584.3720
FIELD DENSITY TEST REPORT
Tacoma, WA 98499
Fax 253.584.3707
7911 NE 33`d Drive, Suite 190
Ph 503.281.7515
ASTM D 2950
Pnrtland ()R 97211
Fax 503281.7579
Page 1 of 1
Project No.: L14156 Date: 5/30/14
Project: Swedish Edmonds Water Main Extension
Inspector: Carl Harrington
MTE Nuclear Gauge No.: 24
Test #
Location
Elevation (feet)
Probe Depth
Laboratory
Maximum Rice
Density
Field
I Wet Density
Compaction /o o
Asphalt Type Description
1
302+99, 3'-0" Right
Grade
2"
157.1
143.7
91.5
1/2" HMA
2
300+44, 13'-6" Right
Grade
2"
157.1
143.0
91.0
1/2" HMA
Specification Compaction and Material : 91%
❑ AASHTO T-209 / ASTM D2041 Theoretical Max Specific Density
❑ Other
Type and Number of Compaction units: (1)BW900-50 (1) BW120-AD
Number of Passes: 10-14 Thickness of lift: 3"
Lay -Down Temp: 298 Supplier: Cemex Kenmore
QC Sample:
Test No.: Wet Density:
Comments: Approximately 92 tons placed.
❑ In our opinion, asphalt generally meets specifications as indicated by test numbers:
❑ In our opinion, asphalt does not meet specifications as indicated by test numbers:
21 Asphalt test meets compaction specifications
El Contractor Advised
21 Full-time observation ❑ Part-time observation
MTE 1300-2C, Rev 3, 7/8/2013
MAYES TESTING ENGINEERS, INC.
DATE:
6/11/2014
CLIENT:
Swedish Edmonds
PROJECT:
Swedish Edmonds Water Main Extension
PROJECT #:
L14156
LAB. #:
6576
DATE REC'D:
6/11/2014
REPORT STATUS: p Original ❑ Amended
SAMPLE DESCRIPTION:
1/2" Hot Mix Asphalt
Seattle Office
20225 Cedar Valley Road
Suite 110
Lynnwood, WA 98036
ph 425 742.9360
fax 425 745.1737
Tacoma Office
10029 S. Tacoma Way
Suite E-2
Tacoma, WA 98499
ph 253.584 3720
fax 253.584.3707
Portland Office
7911 NE 33rd Drive
Suite 190
Portland, OR 97211
ph 503 281.7515
fax 503.281.7579
TEST RESULTS:
Rice Density (AASHTO T-209)
Sample # Date Sampled Supplier Specific Gravity @ 250 C Rice Density (Ib/cu.ft.)
6576 6/11/2014 Cemex 2.523 157.1
Tested By: B. Cook Reviewed E r) " _-
Information in this report applies only to the actual samples tested and shall not be reproduced exce=in,t the approval of Mayes
Testing Engineers, Inc.
MAYES TESTING ENGINEERS, INCRoad
seaft office
Suite 110
LWmAcod, WA98036
ph 425.742.93M
Project No.
L14156
fx425.745.1737
Project
Swedish Edmonds Water Main Extension
Address
7324 216th Street SW, Edmonds, WA
rat:orna Office
10029S.Taoanaway
Permit No.
ENG20140039
SSE-2
Bldg Dept.
City of Edmonds
Tacorn
ph2M.awAssa9s
ph 53.584.3720
fax 253.584.3707
Owner
Swedish Edmonds
Engineer
KPFF
doffice
791 'E33rddDrive
Contractor
Andersen Construction and Green River Construction, Inc.
sure190
Portland, OR 97211
ph 503281.7515
fbu 503281.7579
Record No.
015
Date
5/19/14
Weather Overcast
Inspection Soil Density
Sample(s) --
Observed the excavation, placement and backfill of 12" water main line connections
located approximately at Sta.300+30, 300+09 and 302+70 (old waterline cap and
decommission). Contractor used Hitachi EX135UR excavator for digging and (2) Case 580 Super
M loaders with backhoes for material handling and one for compaction. Contractor was stuffing
and rodding the backfill with the back of a shovel to pack the material around the pipe. A
Jumping Jack compactor was then used to compact the pipe bedding area. Contractor then
compacted the material with a backhoe plate compactor attachment. Contractor used 5/8"
crushed rock in lieu of 1-1/4" CSBC as backfill material. Firm and unyielding conditions
were observed. Conducted density reading on 5/8" crushed rock backfill with tests meeting or
exceeding the minimum 95% compaction (see attached Soil Field Density Test Report).
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Ned Carmi
Reviewed By:
Robert Gardner
Senior Project Manager
Information in this report applies only to the actual items inspected or tested and shall not be reproduced except in full, without the approval of Mayes Testing Engineers, Inc.
Page 1 of 1
MAYES TESTING ENGINEERS, INC.
20225 Cedar Valley Road, Suite 110 Ph 425.742.9360
Lynnwood, WA 98036
Fax 425.745.1737
10029 S. Tacoma Way, Suite E-2
Ph 253.584.3720
Tacoma, WA 98499
Fax 253.584.3707
7911 NE 33rd Drive, Suite 190
Ph 503.281,7515
Portland, OR 97211
Fax 503.281 7579
SO11
FIELD DENSITY TEST REPORT
ASTM D 6938
Page 1 1
Project No.: L14156 Date: 05/19/14
Project: Swedish Edmonds Waterline Extension
Inspector:
MTE Nuclear Gauge No.
Ned Carmi
25
Test #
Location
Depth or
Elevation
(Inches)
Backscatter /
Direct
Transmission
Laboratory
Max Dry
Densi OMC %
tY
PCF
Field
Wet Density Dry Density Moisture Compaction
(PCF) (PCF) Content % %
Soil Type Description
YP p
1
300+30 connection E
-10
8"
128.9
4.4
131
125
4.8
97
6/e" crushed rock
2
300+09 connection
-10
8"
128.9
4.4
133.5
128.7
3.7
99.8
5/a' crushed rock
3
302 +70 cap and decommission
-10
8"
128.9
4.4
130.6
124.9
4.6
96.9
5/B' crushed rock
Specification Compaction and Material : 95%
0 ASTM D 1557 (Modified Proctor)
❑ ASTM D 698 (Standard Proctor)
Type and Number of earth moving units:
Type and Number of Compaction units:
"Jumping -Jack" compactor and Case 580 Super M compactor
Number of Passes: Several Thickness of lift: 12"
Method of Adding Moisture: Rain, F.H.
Comments: all stations are approximate
❑ In our opinion, fill generally meets specifications as indicated by test numbers:
❑ In our opinion, fill does not meet specifications as indicated by test numbers:
21 Fill test meets compaction specifications
0 Contractor Advised add water and thinner lifts
0 Full-time observation ❑ Part-time observation
QC Sample: Test No.: 6461 Dry Density:
128.9 Moisture %: 4.4
MTE 1400-2C, Rev 2, 6/13/11