Loading...
MAYS FINAL LETTER DETENTION VAULT (2).pdfMAYES TESTING ENGINEERS, INC. A lrerracon COMPANY September 21, 2018 City of Edmonds 121 5th Avenue N Edmonds, WA 98020-3146 Attention: Building Department Re: Magic Toyota Facility Replacement Edmonds Final Letter 21300 Highway 99 Permit Nos. ENG2017-0122 and Edmonds, WA BLD2017-0501 (Detention Vault) Project No. M7171461 Seattle Office 20225 Cedar Valley Road Suite 110 Lynnwood, WA98036 ph 425.742.9360 fac425.745.1737 Tacoma Office 10029 S. Tacoma Way Suite E-2 Tacoma, WA98499 ph 253.584.3720 fa(253.584.3707 PordaW Office 7911 NE 33rd Drive Suite 190 Pa darid, OR 97211 ph 503.281.7515 fac503.281.7579 This is to inform you that registered special inspections have been completed for this project per our reports, copies of which have been sent to you. Special inspection was provided for: • Reinforced Concrete — CIP • Proprietary Anchors (Epoxy) To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform to, the city -approved drawings or engineer -approved changes. We trust this provides you with the information that you require. Should you have any questions, please call us at (425) 742-9360. Sincerely, MAYES TESTING ENGINEERS, INC. Timothy G. Beckerle, P.E. Principal