Loading...
McKinleyDeck1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 3, 2007 TO: Kelly McKinley E-mail: Kelly@id9.com FROM: Ann Bullis, Assistant Building Official RE: Plan Check # 2007-0667 Project: McKinley Deck th Project Address: 18822 94 Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. 1.On site plan and deck section, clarify location of existing and new retaining walls. 2.Provide dimensioned construction detail for south 8” concrete retaining wall, including rebar size and spacing, maximum height, concrete strength, etc. Coordinate architectural plan/notes with structural plan/notes. 3.Specify minimum distance of piles from each end of retaining wall footing. 4.Specify/detail connection of piles to footings. If field welding will be required, note weld requirements on the plans (also special inspection will be required). 5.Omit/cross out planter and steps area on A2.0 framing plan, since this appears to no longer be part of the project. 6.Cross reference structural details on the framing/foundation plan. 7.Special Inspections are required for the following: a.Pile driving and pile cap installation b.Field welding (if applicable in #2 above) Complete the enclosed Special Inspection Agreement. Have the owner, general contractor and special inspector sign the form and return for City approval prior to permit issuance.