Loading...
Meadowdale Pier Scope Change Request 9-4-09.pdfC G ENGINEERING September 4, 2009 Ann Bullis, CBO Building Official City of Edmonds 121 5`h Ave N Edmonds, WA 98020 Re: Meadowdale Pier Dear Ann: f,— !U f� a "1 2009 SU ILD3�4 The project owner (Mr. Milosavljevich) is requesting that the City allow a partial resubmittal in order to obtain a repair permit for the existing wood building. The objective is to prevent further damage of the building while the pier replacement permit is being processed. Currently the northeast portion of the structure is missing, which leaves the wood framing exposed to the weather. Because most of the framing is not preservative treated, the structural members are susceptible to further decay. The missing structure also leaves the building more vulnerable to further damage under high wind conditions. CG Engineering would revise the building repair drawings (sheets SR -1, SR -2 & SR -3) to show the repair work to be done while the existing wood pier is still in place. This would include details of the connection to the existing wood pier. Connection to the new pier would be shown on the pier upgrade drawings and accomplished at the time it is constructed. Thank you for considering the owner's request. If you have any questions or comments regarding this letter, please do not hesitate to call. Sincerely, � V if G CG Engineering �p� WAS c � ll a C. Chevy Chase, PE, SE �r Principal cc: Milo Milosavljevic