Meadowdale_SW Site Plan_11-19-2018EdmondsDRAFT
November 2018 Meadowdale Beach Park and Estuary Restoration Project
Stormwater Site Plan
Prepared for Snohomish County Parks and Recreation Department
This document prepared for and submitted to Snohomish County. Information
on City of Edmonds resources is included; this report would also be submitted
to City of Edmonds as part of permit applications.
Project Number: 160723-02.01 \\fuji\Anchor\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.3 90% Design\Stormwater\SW Site Plan Report\Meadowdale_SW Site Plan_DRAFT_11-16-2018.docx
DRAFT
November 2018 Meadowdale Beach Park and Estuary Restoration Project
Stormwater Site Plan
Prepared for Snohomish County Parks and Recreation 6705 Puget Park Drive Snohomish, Washington 98296
Prepared by Anchor QEA, LLC 720 Olive Way, Suite 1900 Seattle, Washington 98101
Stormwater Site Plan i November 2018
DRAFT
This Stormwater Site Plan was prepared under
the supervision of a registered Professional Engineer.
DRAFT – STAMP TO BE SIGNED FOR FINAL
David W. Rice, PE
Anchor QEA, LLC
Stormwater Site Plan ii November 2018
DRAFT
This page intentionally left blank.
Stormwater Site Plan iii November 2018
DRAFT
TABLE OF CONTENTS
1 Project Overview ........................................................................................................................ 1
2 Site Description and Project Background ............................................................................ 4
2.1 Site History ............................................................................................................................................................. 4
2.2 Site Description .................................................................................................................................................... 4
2.3 Existing Stormwater Facilities and Drainage ............................................................................................. 5
2.4 Other On-Site Utilities .................................................................................................................................... 12
2.5 Proposed Site Improvements ...................................................................................................................... 13
2.6 Proposed Stormwater Facilities and Drainage ...................................................................................... 14
2.6.1 Proposed Drainage Area 1 ............................................................................................................ 14
2.6.2 Proposed Drainage Area 2 ............................................................................................................ 16
2.6.3 Proposed Drainage Area 3A ......................................................................................................... 16
2.6.4 Proposed Drainage Area 3B ......................................................................................................... 16
2.6.5 Proposed Drainage Area 4 ............................................................................................................ 16
2.6.6 Proposed Drainage Area 5 ............................................................................................................ 17
2.6.7 Proposed Drainage Area 6 ............................................................................................................ 17
2.7 Proposed Drainage Area Characterization ............................................................................................. 17
3 Minimum Stormwater Requirements ................................................................................. 19
3.1 Minimum Requirement 1 – Preparation of a Stormwater Site Plan ............................................. 21
3.2 Minimum Requirement 2 – Construction Stormwater Pollution Prevention Plan .................. 22
3.3 Minimum Requirement 3 – Source Control of Pollution .................................................................. 22
3.4 Minimum Requirement 4 – Preservation of Natural Drainage Systems and Outfalls ........... 23
3.5 Minimum Requirement 5 – On-Site Stormwater Management ..................................................... 23
3.6 Minimum Requirement 6 – Runoff Treatment ...................................................................................... 24
3.7 Minimum Requirement 7 – Flow Control................................................................................................ 24
3.8 Minimum Requirement 8 – Wetlands Protection ................................................................................ 25
3.9 Minimum Requirement 9 – Operations and Maintenance .............................................................. 26
4 Drainage Analysis and Conceptual Design ...................................................................... 27
4.1 Hydrologic Analyses ........................................................................................................................................ 27
4.2 BMP Selection and Analysis ......................................................................................................................... 28
4.2.1 BMP Selection Based on Feasibility ........................................................................................... 28
4.2.2 Treatment Menu and BMP Selection ........................................................................................ 31
4.2.3 Threshold Discharge Area 1 ......................................................................................................... 32
Stormwater Site Plan iv November 2018
DRAFT
4.2.4 Threshold Discharge Area 2 ......................................................................................................... 33
4.3 Off-Site Analysis ................................................................................................................................................ 33
4.4 Storm Drain System Sizing and Hydraulic Analysis ............................................................................ 33
5 Conclusions and Recommendations .................................................................................. 34
6 References ................................................................................................................................ 35
TABLES
Table 2-1 Existing Drainage Areas ......................................................................................................................... 10
Table 2-2 Proposed Drainage Areas ..................................................................................................................... 18
Table 3-1 Summary and Comparison of Minimum Requirements ......................................................... 20
Table 4-1 Proposed Post-Developed Conditions – Flow Rate Estimates ............................................. 28
Table 4-2 Proposed Drainage BMP Feasibility and Selection ................................................................... 29
FIGURES
Figure 1-1 Vicinity Map ................................................................................................................................................... 3
Figure 2-1 Location Map ................................................................................................................................................ 6
Figure 2-2 Existing Drainage Area Boundaries ..................................................................................................... 7
Figure 2-3 Existing Drainage Facilities ...................................................................................................................... 8
Figure 2-4 Proposed Drainage Areas and Facilities ......................................................................................... 15
APPENDICES
Appendix A Utility Plans
Appendix B Drainage Area and Land Cover Analysis
Appendix C Minimum Requirements Flow Charts
Appendix D Construction SWPPP
Appendix E Hydrologic Model Input and Results
Appendix F Hydraulic Analysis and Facility Sizing Calculations
Appendix G BMP Selection and Treatment Menus
Stormwater Site Plan v November 2018
DRAFT
ABBREVIATIONS
ADA Americans with Disabilities Act
ADT average daily traffic
BMP best management practice
BNSF BNSF Railway Company
cf cubic feet
cfs cubic feet per second
County Snohomish County
CPE corrugated polyethylene
Drainage Manual Snohomish County Drainage Manual
ECDC Edmonds Community Development Code
Ecology Washington State Department of Ecology
LID low-impact development
MHHW mean higher high water
MR Minimum Requirement
MRs Minimum Requirements
O&M operations and maintenance
PGHS pollution-generating hard surfaces
PGPS pollution-generating pervious surfaces
ROW right-of-way
SCC Snohomish County Code
sf square feet
SSP Stormwater Site Plan
Standard Specifications WSDOT Standard Specifications for Road, Bridge, and Municipal Construction
SWPPP Stormwater Pollution Prevention Plan
TDA threshold discharge area
WQ water quality
WSDOT The Washington State Department of Transportation
Stormwater Site Plan 1 November 2018
DRAFT
1 Project Overview
The Snohomish County Parks and Recreation Department (County) is proposing to construct the
Meadowdale Beach Park and Estuary Restoration Project, which will improve beach access, reduce
localized flooding, improve maintenance, and reduce fish barrier issues associated with sediment
deposition in an existing box culvert that conveys Lund’s Gulch Creek under the BNSF Railway (BNSF)
railroad at the park. The park is located at the northern end of Brown’s Bay on Puget Sound, in
Snohomish County, Washington, as shown on Figure 1-1. The park consists of multiple parcels
totaling 108 acres and extends from the rim of Lund’s Gulch through a deeply incised forested ravine
to the shoreline of Puget Sound. The project site encompasses approximately 10 acres of lawn area,
tideland area, recreational facilities, forested slopes, and riparian area at the lower end of Lund’s
Gulch Creek. The BNSF railroad runs through the park along the shoreline and separates the
beach/tidelands from the upland area of the park. The majority of the park, including the tidelands, is
located within unincorporated Snohomish County, but the most southwest parcel landward (east) of
the railroad, totaling approximately 23 acres, is located entirely within the City of Edmonds.
The park is centered around Lund’s Gulch Creek, a salmon-bearing perennial stream. The creek runs
through the park, from east to west, and discharges to Puget Sound through a 6-foot-wide box
culvert under BNSF Railway tracks. The lower creek and estuarine delta are habitat for multiple
salmonid species, including juvenile Chinook salmon, which are listed as threatened under the
Endangered Species Act, as well as coho and chum salmon, and cutthroat trout. The concrete box
culvert conveys creek flow, passes sediment, and provides pedestrian access to the beach. To
facilitate pedestrian access, a boardwalk (first wooden, then recently replaced with steel grating) was
installed above the approximately 2-foot-deep by 4-foot-wide channel in the bottom of the culvert.
The culvert is significantly undersized for the creek, and during high flow conditions a wide portion
of the lower park is flooded. Deposition of sediment also occurs during high-flow events at the
upstream end of the box culvert. This material restricts the movement of fish into and out of the
creek. The sediment also deposits on adjacent park recreational areas and the trapping of sediment
in these areas degrades an important nearshore habitat-forming process. The combination of
sediment deposition and high-water conditions also impacts beach access and significant park
resources are required to remove sediment and maintain conditions in a sensitive aquatic
environment. The water and sediment conditions also create railroad crossing safety and Americans
with Disabilities Act (ADA) compliance issues for public access to the beach.
The primary objectives of the project are to restore ecological functions and expand the Lund’s Gulch
Creek estuary, improve habitat conditions for salmon and other wildlife in lower Lund’s Gulch Creek,
address public safety issues involving the existing railroad crossing, and improve access (including
ADA-compliant access) to the beach.
Stormwater Site Plan 2 November 2018
DRAFT
Additional elements of the design include the following:
• Converting portions of the lower lawn area to stream marsh and riparian habitat
• Enhancing riparian vegetation along the creek
• Placing in-stream wood structures
• Enhancing existing habitat north of the existing foot-bridge
• Connecting existing fresh water wetland to the creek
• Providing picnic viewpoints
• Re-routing paths
• Providing a new, portable restroom enclosure
• Constructing a new foot-bridge over Lund’s Gulch Creek
• Addressing other ADA issues within the lower park area
• Improving stormwater runoff controls and treatment
The project will also include improvements to the ADA access road and parking, as needed to
support construction activity and improve ADA access, as well as interpretive/educational signage.
Improvements will be designed to meet the requirements of the following County documents:
• Snohomish County Code (SCC; Snohomish County 2017)
• Snohomish County Engineering and Design Standards (Snohomish County 2016a)
• Snohomish County Drainage Manual (Snohomish County 2016b)
Because the park and proposed improvements span the boundary between the City of Edmonds and
unincorporated Snohomish County, the improvements will also need to be designed to meet the
requirements outlined in the following City of Edmonds documents:
• Edmonds Community Development Code (ECDC; City of Edmonds 2017a)
• The Washington State Department of Transportation (WSDOT) 2018 Standard Specifications
for Road, Bridge, and Municipal Construction (Standard Specifications; WSDOT 2017), and the
City of Edmonds Modifications to the Standard Specifications (City of Edmonds 2007)
• City of Edmonds Standard Details (City of Edmonds 2016)
• The Stormwater Management Manual for Wester Washington (SWMMWW; Ecology 2014)
• City of Edmonds Stormwater Addendum (City of Edmonds 2017b)
This report identifies the stormwater Minimum Requirements (MRs) that apply to the project and
presents analysis of improvements and best management practices (BMPs) that have been incorporated
into the design of the project to meet those requirements. This report is intended to serve as the
Stormwater Site Plan (SSP) required for the project, in accordance with MR1 from the Snohomish
County Drainage Manual and the City of Edmonds Stormwater Addendum. This SSP reflects the design
of drainage improvements reflected in the 90% Design set of drawings and specifications for the project.
The final report will reflect a more detailed level of design that will be submitted for construction permits.
Meadowdale BeachCounty Park
City of Edmonds
Lund's Gulch Creek
Puget Sound
City ofLynnwood
Unincorporated Snohomish County
76th AVE W168th ST SW 52nd AVE WI-5SR-525SR-99[LEGEND:Park BoundaryCity/County Boundary
Publish Date: 2018/03/07, 4:39 PM | User: jsextonFilepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\SW Site Plan Report\Figures\GIS\Figure1-1_VicinityMap.mxd
Figure 1-1Vicinity MapPreliminary Stormwater Site PlanMeadowdale Beach Park Recreation and Habitat Improvements Project
)Project Site
0 2,000
Feet
Stormwater Site Plan 4 November 2018
DRAFT
2 Site Description and Project Background
2.1 Site History
Meadowdale Beach County Park is located at 6026 156th Place SW, Edmonds, Washington. The park
spans the boundary between the City of Edmonds and unincorporated Snohomish County, as shown
on Figure 2-1. The 108-acre park consists of several parcels and is owned, operated, and maintained
by the Snohomish County Parks and Recreation Department. Lund’s Gulch was first homesteaded by
John Lund in 1878. The BNSF railroad was also constructed in the late 1800s. The gulch saw many
subsequent landowners and was logged prior to eventually being acquired by the Meadowdale
Country Club. The country club was a much more intensively developed facility than the current park
and was located in what is now the lower creek and lawn area. The club closed in the late 1960s, due
to repeated landslides, which damaged the access road, and other factors.
In 1971, Snohomish County acquired the land for developing a public park with beach access. The
buildings, which had been badly vandalized, were demolished and removed, along with the remains
of the clubhouse, which had been destroyed by fire. The public was allowed to drive into the park on
the access road until its condition degraded due to unstable soils. The park was closed to the public
in 1979, after which a wide range of unsanctioned activities occurred, including firearms use,
motorcycle riding, and large parties (Bruce Dees 1986; Snohomish County 2015). Planning and
development of the park commenced in 1986 and included extensive public involvement with the
following key issues identified:
• Develop a park access arrangement that addressed surrounding neighborhood traffic
concerns and disabled access requirements
• Create a safe environment for the public to recreate in
• Preserve and restore the natural environment
• Build recreation facilities that supported passive recreation use
Park improvements were completed in 1988. The park was closed in the late 1980s due to a slide on
the access road. the park was closed again briefly in 1996 due to excessive storm damage from
flooding and re-opened in 1997.
2.2 Site Description
The park’s natural forests, stream, beach, and trails are the main attractions and are popular with
residents throughout Snohomish County and nearby areas, attracting 50,000 to 70,000 annual
visitors. The beach access is currently one of two available access points, along with Picnic Point
County Park, between downtown Edmonds and Mukilteo. The park is also extensively used for
environmental education by local schools, Boy and Girl Scouts, and Edmonds Community College
Stormwater Site Plan 5 November 2018
DRAFT
(Dailer 2015). The park is also an official Washington Water Trails campsite, providing beach camping
to people using a non-motorized watercraft.
The park’s main public access is from a parking lot located off of 156th Street SW. This upper portion
of the park includes a small playground, portable toilets, a trailhead, and 30 parking stalls. A
1.25-mile earthen trail begins at the upper parking lot and follows Lund’s Gulch Creek to a partially
paved loop trail in the lower park area. This loop trail connects recreational amenities to the box
culvert that provides beach access under the BNSF railroad. Facilities at the lower park include paved
and unpaved trails, a sand volleyball court, picnic shelter, five uncovered picnic tables on concrete
pads, a lawn area, pedestrian bridge, ADA parking, portable toilets, and a ranger residence. The main
recreational activities at the park include beach access, walking and hiking, picnicking, bird
watching/nature enjoyment, and environmental education programs.
The existing earthen railroad embankment parallels the beach, separating the County tidelands from the
park lawn. The embankment is heavily armored with riprap and boulder-sized rock and is approximately
30 feet wide at the top and 60 feet wide at the base. The top of the embankment is approximately 8
feet above the adjacent foot-path. The embankment lies within the 100-foot BNSF-owned right-of-way
(ROW). The embankment supports two tracks: Main 1 track (west track) and Main 2 track (east track).
The corridor, a segment of the BNSF Scenic Subdivision (Line Segment 50, Milepost 21.8; Seattle to
Wenatchee, Washington), has a high daily volume of freight, passenger, and commuter railroad traffic,
which will likely increase over time. This line also serves Amtrak and Sound Transit passenger trains.
The existing concrete box culvert is located at the beginning of an approximately 4.5-degree curve in
the railroad line. The culvert opening is 6 feet high by 6 feet wide and has an upstream invert
elevation of 9.59 feet and a downstream invert elevation of 9.07 feet North American Vertical Datum
of 1988. Following construction of the culvert, a wooden deck was placed approximately 2 feet above
the bottom of the culvert to accommodate public beach access and maintenance of the culvert. The
wooden deck has since been replaced with steel grating.
2.3 Existing Stormwater Facilities and Drainage
Local drainage basins that discharge stormwater runoff to Lund’s Gulch Creek or Puget Sound within
or adjacent to the project site are shown on Figure 2-2. Existing stormwater facilities at the site are
shown on Figure 2-3. Existing stormwater facilities are also shown on the existing conditions maps
included with the utility drawings included in Appendix A. The locations of existing drainage facilities
within the park are based on topographic survey of utility features. The existing park has limited
stormwater conveyance and control infrastructure. Existing stormwater facilities within the project
site include the following:
DRAFT
0 200
Feet
LEGEND:
Park Boundary Project Limits Steep Slopes >33%
Parcel Boundaries City/County Boundary
Existing Wetlands BNSF Right-of-Way
Publish Date: 2018/03/08 9:37 AM | User: jsexton
Filepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\CAD\0723-RP-Figure 2-1 Location Map.dwg Figure 2-3
Figure 2-1
Location Map
Preliminary Stormwater Site Plan
Meadowdale Beach Park Recreation and Habitat Improvements Project
Lund's Gulch Creek73RD AVE W151ST ST SW
72ND AVE W72ND AVE W73RD AVE WLUNDS GULCH ROAD6' x 6' Culvert Under
BNSF ROW to Puget
Sound
City of Edmonds
Unincorporated Snohomish County
1
23
4
5
6
DRAFT
0
Feet
300
LEGEND:
Park Boundary Project Limits Steep Slopes >33%
Parcel Boundaries City/County Boundary Lund's Gulch Creek Drainage Basin
Existing Wetlands BNSF Right-of-Way Existing Drainage Areas
Publish Date: 2018/03/08 12:50 PM | User: jsexton
Filepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\CAD\0723-RP-Figure 2-2 Existing Drainage Area Boundaries.dwg Figure 2-3
Figure 2-2
Existing Drainage Area Boundaries
Preliminary Stormwater Site Plan
Meadowdale Beach Park Recreation and Habitat Improvements Project72ND AVE W156TH ST SW 68TH AVE. W70TH AVE W6' x 6' Culvert Under
BNSF ROW to Puget
Sound
City of Edmonds
Unincorporated Snohomish County
Lund's Gulch Creek Drainage Basin
Project Site
Lund's Gulch Creek
Wetland I
Wetland D
Wetland CWetland E
Wetland G
Wetland B
Wetland F
Wetland A
Wetland H
1
23
4
5
DRAFT
0 100
Feet
LEGEND:
Existing Storm Drain Drainage Area Flow Direction
Existing Storm Structure City/County Boundary BNSF ROW
Project Limits Existing Wetlands
Publish Date: 2018/03/08 12:26 PM | User: jsexton
Filepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\CAD\0723-RP-Figure 2-3 Exist Drainage Facilities(2).dwg Figure 2-3
Privileged and Confidential | Attorney Work Product | Prepared at Request of Counsel
Figure 2-3
Existing Drainage Facilities
Preliminary Stormwater Site Plan
Meadowdale Beach Park Recreation and Habitat Improvements Project
Lund's Gulch Creek
6' x 6' Culvert Under BNSF
ROW
Drainage Swale
Ranger Residence
Picnic Shelter Drinking
Fountain &
Drain
Portable
Restroom
Enclosure
Stormwater Site Plan 9 November 2018
DRAFT
• Access Road Swale: A paved swale runs along the upslope side of the existing access road
that provides ADA-compliant and ranger access to the lower park. The access road is sloped
so that runoff from the access road and forested slope south of the access road collects in the
swale and discharges through a vegetated area towards Lund’s Gulch Creek, where the access
road makes a hairpin turn into the ADA parking area. As-built drawings of the park indicate
that the swale is 1 foot deep and is paved with asphalt, similar to the adjacent access road.
Existing water, sewer, electrical, and communications service lines are buried under the swale.
• Catch Basin and Drain to Creek in ADA Parking Lot: A single catch basin is located in the
lowest (northwest) corner of the ADA parking area at the bottom of the access road, behind
the ranger residence. The catch basin discharges runoff through a 6-inch-diameter PVC pipe
north to Lund’s Gulch Creek. The catch basin only captures runoff from a small portion of the
paved parking area surface. Runoff from most of the paved parking area and lower access
road discharges via sheet flow runoff to adjacent vegetated areas.
• Roof Drains: Gutters and downspouts collect and discharge runoff from rooftops over the
ranger residence, an existing picnic shelter, and a portable restroom enclosure directly to
adjacent lawn, landscaping, or paved areas.
• Drinking Fountain Drain: A drinking fountain adjacent to the existing picnic shelter drains to
the soil below the adjacent lawn area through a small sump with an inlet grate and a
subsurface trench drain.
• Lund’s Gulch Creek and Culvert: Runoff from all of the upland area of the project site drains to Lund’s Gulch Creek. As noted, the creek flows through a concrete box culvert through the BNSF railway embankment to Puget Sound.
Topographic survey data for the project site, along with light detection and ranging (LiDAR) data and
aerial photography, were used to delineate existing drainage areas that discharge to Lund’s Gulch
Creek or Puget Sound within or adjacent to the project site. Table 2-1 summarizes existing drainage
areas, which are characterized by pervious and impervious surfaces (referred to in the Snohomish
County Drainage Manual and the City of Edmonds Stormwater Addendum as “hard surfaces”). Areas
within the proposed project site were characterized by evaluating existing land cover conditions
based on the topographic survey. Off-site areas were characterized by evaluating existing land cover
conditions based on aerial photography.
Most of the site discharges stormwater runoff directly to Lund’s Gulch Creek, which then discharges
to Puget Sound at the west end of the site. The area draining to Lund’s Gulch Creek was divided into
the following sub-basins:
Stormwater Site Plan 10 November 2018
Table 2-1 Existing Drainage Areas
Area
TDA 1 TDA 2
Area 1
Access Road and Parking Area
(sf)
Area 2
Ranger Residence Area
(sf)
Area 3
Hillside and Park Area South of Creek
(sf)
Area 4
Hillside and Park Area North of Creek
(sf)
Area 5
Railroad Berm and Beach
(sf)
TOTAL Areas 1–5
(sf)
Overall Lund’s Gulch Creek Drainage Basin
(acres)
Area 6
Access Road Entrance and Off-Site Areas
(sf)
Within Project Site Area
Hard Surface Area 22,836 1,184 14,211 12,159 10,206 60,596 1.4 5,108
Pervious Surface Area 9,442 7,800 112,276 39,786 27,368 196,672 4.5 3,520
Subtotal 32,278 8,984 126,487 51,945 37,574 257,268 5.9 8,628
Off-Site Areas that Drain through Project Site
Hard Surface Area 5,865 4,778 0 0 14,795 25,438 362.9 617
Pervious Surface Area 210,883 30,112 67,331 461,931 16,408 786,665 1,071.2 131,991
Subtotal 216,748 34,890 67,331 461,931 31,203 812,103 1,434.1 132,608
Total Drainage Area
Hard Surface Area 28,701 5,962 14,211 12,159 25,001 86,034 364.3 5,725
Pervious Surface Area 220,325 37,912 179,607 501,717 43,776 983,337 1,075.7 135,511
Total 249,026 43,874 193,818 513,876 68,777 1,069,371 1,440.0 141,236
Stormwater Site Plan 11 November 2018
DRAFT
• Area 1 – Access Road and Parking: Drainage from the access road that provides access for
ADA guests, the park ranger, and other maintenance vehicles is collected and conveyed in a
paved swale that runs along the south side of the access road. The swale ends at the hairpin
turn near the parking area and discharges runoff from the access road to Lund’s Gulch Creek
through a low-lying area at the base of the slope, designated for the project design as
“Wetland D.” The only other constructed stormwater facilities in this area include a single
catch basin at lowest corner (northwest corner) of the parking area that discharges to Lund’s
Gulch Creek through a short segment of 6-inch-diameter PVC storm drain pipe.
• Area 2 – Near Ranger Residence: No constructed stormwater collection or conveyance
facilities exist in the area near the ranger residence, with the possible exception of some type
of buried foundation drain around the building. This area consists of the ranger residence, a
storage area and shed, a paved pathway, landscaping and grass, trails, a gravel access road,
and riparian areas. Runoff from these areas infiltrates, disperses, or sheet flows to Lund’s
Gulch Creek through the riparian area adjacent to the creek.
• Area 3 – West of Ranger Residence on South Side of Creek: No constructed stormwater
collection or conveyance facilities exist in the park area south of the creek, except for a small
sump and buried infiltration trench drain that were designed primarily to drain the drinking
fountain at the existing picnic shelter. This area consists of a picnic shelter, a portable toilet
enclosure, paved pathways, landscaping and grass, and riparian areas in the lower park area
south of the creek. Runoff from these areas infiltrates, disperses, or sheet flows to the creek
through the riparian area. Roof runoff from the roofs over the picnic shelter and portable
toilet enclosure discharges from downspouts to paved areas or lawn areas.
• Area 4 – North Side of Creek: No constructed stormwater collection or conveyance facilities
exist in the park area north of the creek, except for a single 12-inch culvert that conveys water
across a gravel pathway. This area consists primarily riparian area and forested slopes, with of
crushed rock pathway.
• Area 5 – Railroad Berm and Beach: As noted earlier, the BNSF railroad runs along a berm
across the mouth of Lund’s Gulch. The only drainage through the railroad berm is through the
approximately 6-foot-wide, 6-foot-high box culvert. Surfaces adjacent to the railroad and
along the shoreline are pervious. Any runoff infiltrates or runs off to the shoreline.
The following also drains through a portion of the project area:
• Area 6 – Access Road and Off-site Areas: Drainage Area 6 includes areas that drain through a
small portion of the project area along the south end of the access road at the entrance to the
park. This area consists of a small portion of forested hillside upslope of the access road
within the park and a forested hillside downstream of the access road to the BNSF ROW. A
swale along the uphill side of the access road near the entrance conveys runoff from the
hillside above the access road north to an inlet structure near the entrance to the park. An
Stormwater Site Plan 12 November 2018
DRAFT
18-inch-diameter concrete storm drain pipe appears to convey runoff from the swale to
drainage facilities in and near the residence at 15500 75th Place NW, adjacent to the park
entrance. Those facilities drain west to the BNSF ROW and Puget Sound between 15500 and
15520 75th Place NW.
Drainage Areas 1 through 4 represent the lower part of the larger Lund’s Gulch Creek Drainage Basin.
The Lund’s Gulch Creek Drainage Basin includes approximately 1,440 acres (2.25 square miles) that
drain to Puget Sound through the outlet of Lund’s Gulch Creek within the project site. Most of that
area is upstream of the project area and extends into urban areas within the City of Lynnwood, the
City of Edmonds, and unincorporated Snohomish County. Hydrology for the basin was evaluated as
part of the Puget Sound Tributaries Drainage Needs Report (Snohomish County 2002), and the results
were used to develop the hydraulic analysis presented in the Meadowdale Beach County Park
Feasibility Study (Anchor QEA 2016). The hydrologic analysis from those reports indicates that the
overall existing Lund’s Gulch Creek drainage basin land cover consists of approximately 25.3% hard
surfaces and 74.7% pervious surfaces. Future conditions are expected to increase the hard surface
coverage to approximately 37.6% of the land cover within the basin.
Drainage Areas 1 through 5 were identified as areas that drain through the park to a common
discharge location to Puget Sound at or near the mouth of Lund’s Gulch Creek. For the purpose of
this analysis, these areas were determined to comprise a single threshold discharge area (TDA),
referred to herein as TDA 1. Drainage Area 6 appears to outlet to Puget Sound through the BNSF
railroad embankment south of the project area, although the specific outlet location could not be
verified as part of this analysis. An inlet near the park entrance appears to convey runoff from the
roadway and upslope areas near the entrance to facilities that drain west to the BNSF ROW and
Puget Sound between 15500 and 15520 75th Place NW. For this analysis, Drainage Area 6 was
assumed to be a separate TDA, referred to herein as TDA 2.
2.4 Other On-Site Utilities
Other existing utilities at the site include potable water, sanitary sewer, power, and communications.
Potable water facilities include a 1.5-inch water meter at the property boundary on the east side of
the access road and a 2.5-inch PVC water service main extending from the meter along the access
road to the ranger residence and picnic shelter, with a 1-inch PVC water service line extending to the
portable toilet enclosure. Sanitary sewer facilities include a small lift station and 1.5-inch force main
that serve the ranger residence. Power and communication conduits also extend into the site along
the access road to the ranger residence. The utilities are primarily located in a common trench under
the drainage swale on the east and south sides of the access road. The intent of the design of park
improvements is to minimize the impact to existing utilities.
Stormwater Site Plan 13 November 2018
DRAFT
2.5 Proposed Site Improvements
The project improvements will include the following:
• Railroad Bridge: The existing box culvert will be replaced with a four-span railroad bridge
with two 40-foot clear center spans and two 25-foot abutment spans centered on the location
of the current culvert and creek outlet alignment.
• Beach Access: A pedestrian access path to the beach will be located under the railroad bridge
and will provide the 80-inch minimum vertical clearance required for ADA-compliant access.
• Habitat Restoration: The lower lawn area and part of the upper lawn area will be converted to
estuary, stream, marsh, and riparian habitat, with additional habitat area restored by
enhancing riparian vegetation and in-stream wood structures. Existing habitat will also be
enhanced upstream of the pedestrian footbridge across Lund’s Gulch Creek by installing large
woody debris and enhancing existing riparian vegetation.
• Pedestrian Bridge: A new pedestrian bridge will be installed across the restored stream
channel downstream of the existing pedestrian bridge to connect pathways on the north and
south sides of the stream.
• Paths: The path connecting the picnic shelter to the pedestrian bridge and path on the north
side of the creek will be partially re-aligned. The loop path north of the creek and proposed
marsh will be truncated to avoid habitat fragmentation. Other existing paths will be
resurfaced and modified, as needed, to accommodate restoration and new park facilities.
• Lawn Renovation: Drainage of remaining lawn areas will be improved by regrading lawn
areas and adding a more permeable subsurface layer, and the volleyball court will be
converted to lawn area.
• ADA-Compliant Access: ADA-compliant access will be extended throughout the park by
constructing accessible walkways from the parking area to the beach.
• Site Furnishings: New benches, picnic tables, and other site furnishings will be provided to
enhance the park and recreational facilities.
• Picnic Shelter: The existing picnic shelter will be maintained as is.
• Restroom Enclosure: A new structure will be constructed to house portable restroom
facilities. The enclosure will include a handwashing station and will be located adjacent to the
existing picnic shelter. It will replace an existing enclosure that must be relocated to allow for
restoration of the estuary and avoid conflicts with construction in the BNSF ROW.
• Viewpoints: Two picnic viewpoints will be established at the new path terminus.
• Access Road and Parking Area: The existing access road will be modified, as needed, to
provide construction access for a 100-ton crane and other construction equipment that will
be needed to construct improvements at the site. This will likely include adjustment of the
profile along the lower half of the access road, modification to the swale along the south side
of the access road, and widening of the hairpin curve at the bottom of the access road. The
Stormwater Site Plan 14 November 2018
DRAFT
parking area will also be slightly reconfigured to improve the parking layout and ensure
adequate ADA access. Both the parking area and the access road will be resurfaced to repair
damage that will be done during construction.
• Utilities: Utilities will be modified, as needed, to accommodate grading and improvements.
2.6 Proposed Stormwater Facilities and Drainage
Proposed stormwater improvements were identified and designed based on the MRs outlined in
Section 3. The proposed drainage improvements are illustrated on Figure 2-4. Proposed drainage
areas and flow directions are also shown. Detailed utility plans, showing drainage improvements in
plan view with profiles and details, are also included in Appendix A (Drawings CU-1 through CU-4).
The following summarizes the overall drainage improvement concept. Additional details about the
improvements are provided in Section 4.
2.6.1 Proposed Drainage Area 1
Proposed Drainage Area 1 will include the access road and parking area that provide ADA and
ranger access to the lower park and areas tributary to the access road and parking area. Most of the
access road will be resurfaced by grinding and overlaying the existing asphalt. The lower end of the
access road will be regraded to reduce the slope of the access road to a maximum of 15%, to allow
for adequate construction access. The access road at the hairpin turn will also be widened to improve
access. The ADA parking facility will be reconfigured to include an additional ADA-accessible parking
space. As part of this work, the drainage swale along the south edge of the access road will be
replaced with a rock-lined swale with an impervious liner. At the downstream end of the swale, a
catch basin will be installed to collect all runoff from the access road. A system of additional catch
basins and storm drains will be installed along the edges of the hairpin turn and in the ADA-
accessible parking area to capture runoff from these pollution-generating hard surfaces (PGHS) for
conveyance to a bio-filtration swale for treatment in Proposed Drainage Area 2.
1
2
3A
4
5
3B
6
LEGEND:
Proposed Storm Drain Project Limits Flow Direction
Proposed Storm Structure City/County Boundary BNSF ROW
Proposed Drainage Area Existing Wetlands Proposed Contour
Drainage Swale
Restroom Enclosure
Drinking
Fountain
&
Drain
Wet
Bio-filtration
Swale
DRAFT
0 100
Feet
Publish Date: 2018/03/08 12:35 PM | User: jsexton
Filepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\CAD\0723-RP-Figure 2-4 Proposed Drainage Areas and Facilities.dwg Figure 2-4
Figure 2-4
Proposed Drainage Areas and Facilities
Preliminary Stormwater Site Plan
Meadowdale Beach Park Recreation and Habitat Improvements Project
Lund's Gulch Creek
Proposed BNSF Bridge Restored Estuary
Stormdrain
System for
Driveway and
ADA Parking
Area
Rock-Lined
Swale to
MHHW
Picnic Shelter
Ranger Residence
Stormwater Site Plan 16 November 2018
DRAFT
2.6.2 Proposed Drainage Area 2
Proposed Drainage Area 2 will include the area around the ranger residence, lower park areas, and
forested slope areas that will be tributary to the proposed treatment swale. Improvements within this
area will include resurfacing paved pathways, regrading and replacing existing lawn areas, and
construction of new storm drainage facilities. A series of storm drains and catch basins will be
installed to convey runoff from PGHS in Proposed Drainage Area 1 to the wet bio-filtration swale
that will be installed along the south edge of the paved loop pathway west of the ranger residence.
The swale will be designed to provide basic treatment, in accordance with the MRs outlined in
Section 3.
2.6.3 Proposed Drainage Area 3A
Proposed Drainage Area 3A will include the portion of the lower park area that will be tributary to
the drainage system downstream of the treatment swale. Downstream of the wet bio-filtration swale,
treated runoff will be conveyed through storm drains to a rock-lined swale that will convey runoff
through the restored estuary to the mean higher high water (MHHW) mark. Improvements within
this area will include resurfacing paved pathways, regrading and replacement of lawn areas,
installation of recreation facilities (benches, viewpoints, picnic tables, a new paved pathway, and a
new portable restroom enclosure), and restoration of estuary and riparian areas.
2.6.4 Proposed Drainage Area 3B
Proposed Drainage Area 3B will include the portion of the lower park area south of Lund’s Gulch
Creek that is not tributary to proposed stormwater facilities. No constructed stormwater facilities are
planned for this area. Runoff from this area will continue to infiltrate, disperse, or sheet flow to
Lund’s Gulch Creek through the riparian area adjacent to the creek. Improvements within this area
will include resurfacing paved pathways, regrading and replacement of lawn areas, installation of
recreation facilities (benches, viewpoints, picnic tables, and a new bridge over Lund’s Gulch Creek),
and restoration of estuary and riparian areas.
2.6.5 Proposed Drainage Area 4
Proposed Drainage Area 4 will include the lower park area that drains to Lund’s Gulch Creek through
the project site. No new constructed stormwater collection or conveyance facilities are planned in the
lower park area north of the creek. This area consists primarily riparian area and forested slopes, with
a crushed-rock pathway. Other improvements will include installation of recreation facilities
(benches, viewpoints, and a new bridge over Lund’s Gulch Creek), and restoration of estuary and
riparian areas. Runoff from these surfaces will continue to infiltrate, disperse, or sheet flow to Lund’s
Gulch Creek through the riparian area adjacent to the creek.
Stormwater Site Plan 17 November 2018
DRAFT
2.6.6 Proposed Drainage Area 5
Proposed Drainage Area 5 will include the railroad ROW and beach area. Surfaces adjacent to the
railroad and along the shoreline are pervious. Any runoff will continue to infiltrate or run off to the
shoreline or restored estuary area.
2.6.7 Proposed Drainage Area 6
Drainage Area 6 will include areas that drain through a small portion of the project area along the
south end of the access road at the entrance to the park. This area will consist of a small portion of
forested hillside upslope of the access road within the park and a forested hillside downstream of the
access road to the BNSF ROW. The access road through this area will be resurfaced by grinding and
overlaying the asphalt roadway surface. No construction of or modification to stormwater facilities in
this area is proposed.
2.7 Proposed Drainage Area Characterization
Proposed drainage areas are characterized in Table 2-2 and illustrated on Figure 2-4. A more detailed
breakdown of the existing and proposed land cover is provided in Appendix B. Proposed drainage
areas are characterized by pervious and hard surfaces. Hard surfaces within the project site have also
been characterized as those that are existing and will remain, those that will replace existing hard
surfaces, and new hard surfaces. For this analysis, areas within the proposed project site were
characterized by evaluating proposed land cover shown on the site plans and material plans for the
project from the 60% drawings for the project. Off-site areas were characterized based on aerial
photography.
Stormwater Site Plan 18 November 2018
DRAFT
Table 2-2 Proposed Drainage Areas
Area
TDA 1 TDA 2
Area 1
Access Road and Parking Area
(sf)
Area 2
Ranger Residence Area
(sf)
Area 3A
Hillside and Park Area South of Creek
(sf)
Area 3B
Hillside and Park Area South of Creek
(sf)
Area 4
Hillside and Park Area North of Creek
(sf)
Area 5
Railroad Berm and Beach
(sf)
TOTAL Areas 1–5
(sf)
Overall Lund’s Gulch Creek Drainage Basin
(acres)
Area 6
Access Road Entrance and Off-Site Areas
(sf)
Within Project Site Area
Hard Surface Area 22,178 5,267 7,250 2,723 10,196 25,829 73,443 1.7 5,108
Existing 21,372 0 542 0 10,196 25,000 57,110 0.8 5,108
New 806 63 2,155 1,529 0 243 4,796 0.1 0
Replaced 0 5,204 4,553 1,194 0 586 11,537 0.8 0
Pervious Surface Area 8,625 16,753 46,971 69,615 42,915 12,432 197,311 4.5 3,520
Subtotal 30,803 22,020 54,221 72,338 53,111 38,261 270,754 6.2 8,628
Off-Site Areas that Drain through Project Site
Hard Surface Area 7,329 3,806 0 0 0 0 11,135 362.6 617
Pervious Surface Area 210,894 40,486 44,113 708 460,765 30,516 787,482 1,071.2 131,991
Subtotal 218,223 44,292 44,113 708 460,765 30,516 798,617 1,433.8 132,608
Total Drainage Area
Hard Surface Area 29,507 9,073 7,250 2,723 10,196 25,829 84,578 364.3 5,725
Pervious Surface Area 219,519 57,239 91,084 70,323 503,680 42,948 984,793 1,075.7 135,511
Total 249,026 66,312 98,334 73,046 513,876 68,777 1,069,371 1,440.0 141,236
Stormwater Site Plan 19 November 2018
DRAFT
3 Minimum Stormwater Requirements
Because the project spans the boundary between unincorporated Snohomish County and the City of
Edmonds, the project must meet the minimum stormwater requirements for both jurisdictions.
Minimum stormwater requirements for projects within Snohomish County are subject to the
requirements of Chapter 30 of the SCC, as supplemented by the Snohomish County Drainage Manual
and the Snohomish County Engineering and Design Standards. Minimum stormwater requirements for
projects within the City of Edmonds are subject to the requirements of the ECDC, which requires
compliance with the Ecology SWMMWW, as supplemented or modified by the City of Edmonds
Stormwater Addendum. A summary and comparison of the minimum requirements from Snohomish
County and the City of Edmonds is included in Table 3-1.
The Snohomish County Drainage Manual and the SWMMWW allow for evaluation of minimum
requirements based on TDAs. Two TDAs have been identified for stormwater that drains through the
project site. The main TDA (TDA 1) includes the clear majority of the project site and drains directly
to Lund’s Gulch Creek or to the shoreline adjacent to the mouth of Lund’s Gulch Creek. The only
portion of the project site not included in TDA 1 is the access road entrance, from the property
boundary to the crest of the hill at the first curve in the access road, and those areas tributary to it,
including both park and private property upslope and downslope of the access road to the BNSF
ROW. This area is considered a separate TDA (TDA 2).
SCC 30.91R distinguishes “New Development” from “Redevelopment” based on the percentage of
the existing site covered with hard surfaces. Projects developed on sites with 35% or less hard
surface coverage are characterized as “New Development” rather than “Redevelopment.” The hard
surfaces at the project site comprise less than 5% of the total acreage within the site. Therefore, the
project is characterized as “New Development” rather than “Redevelopment.” ECDC 18.30 does not
distinguish between new projects and redevelopment projects. The following subsections summarize
the minimum requirements from Snohomish County. Where the City of Edmonds requirements differ
and are more stringent, those requirements are also presented.
Appendix C includes a mark-up of Figure 1.1 from the Snohomish County Drainage Manual and
Figure 3.1 from the City of Edmonds Stormwater Addendum identifying the MRs that apply to the
project. The thresholds and triggers for minimum requirements are generally consistent between the
two jurisdictions. The project will add or replace more than 5,000 square feet (sf) of hard surface
within TDA 1, so all the MRs outlined in the Snohomish County Drainage Manual and City of Edmonds
Stormwater Addendum will apply to stormwater runoff from new and replaced impervious surfaces
and converted vegetation areas in TDA 1. The project will not result in more than 2,000 sf of new or
replaced hard surface in that TDA 2, so only MR2 will need to be met in TDA 2.
Stormwater Site Plan 20 November 2018
DRAFT
Table 3-1 Summary and Comparison of Minimum Requirements
MR Description Snohomish County SMMWW and City of Edmonds Stormwater Addendum
1 Preparation of Stormwater Site Plans
• Site Analysis: Collect and Analyze Information on Existing Conditions
• Prepare Preliminary Development Layout
• Perform Off-site Analysis
• Determine Applicable Minimum Requirements
• Prepare a Permanent Stormwater Control Plan
• Prepare a Construction Stormwater Pollution Prevention Plan
• Complete the Stormwater Site Plan
• Site Analysis: Collect and Analyze Information on Existing Conditions
• Prepare Preliminary Development Layout
• Perform Off-site Analysis
• Determine Applicable Minimum Requirements
• Prepare a Permanent Stormwater Control Plan
• Prepare a Construction Stormwater Pollution Prevention Plan
• Complete the Stormwater Site Plan
• Complete Checklists 1, 2, and 3 in Edmonds Stormwater Addendum
2 Stormwater Pollution Prevention Plan
• Mark Clearing Limits
• Establish Construction Access
• Control Flow Rates
• Install Sediment Controls
• Stabilize Soils
• Protect Slopes
• Protect Drain Inlets
• Stabilize Channels and Outlets
• Control Pollutants
• Control De-Watering
• Maintain BMPs
• Manage the Project
• Protect On-site Stormwater Management BMPs for Runoff from Roofs and Other Hard Surfaces
• Preserve Vegetation/Mark Clearing Limits
• Establish Construction Access
• Control Flow Rates
• Install Sediment Controls
• Stabilize Soils
• Protect Slopes
• Protect Drain Inlets
• Stabilize Channels and Outlets
• Control Pollutants
• Control De-Watering
• Maintain BMPs
• Manage the Project
• Protect Low Impact Development BMPs
• Edmonds Stormwater Addendum provides increased level of detail for the protection of LID BMPs
3 Source Control of Pollution • Source control shall be provided through the application of source control BMPs during construction and on the developed site following construction
• BMPs shall be appropriate for the proposed construction activities, buildings, facilities, and intended post-development site uses in accordance with Volume IV of the Drainage Manual
• All known, available and reasonable source control BMPs must be applied to prevent stormwater from coming in contact with pollutants as outlined in Volume IV of the SMMWW
4 Preservation of Natural Drainage Systems and Outfalls
• Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location
• The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters or down gradient properties
• Mitigation of off-site drainage impacts shall be provided pursuant to the requirements of Volume I of the Drainage Manual
• Natural drainage patterns shall be maintained, and discharges from the project site shall occur at the natural location
• The manner by which runoff is discharged from the project site must not cause a significant adverse impact to downstream receiving waters or down gradient properties
• Existing upstream flows must be accommodated without causing erosion or flooding impacts
• Mitigation is required to prevent flooding or erosion problems as determined by the off-site analysis
5 On-Site Stormwater Management • Projects exempt from MR7 must implement the following BMPs if feasible:
o BMP T5.13 Post-Construction Soil Quality and Depth
o BMP T5.10A Downspout Full Infiltration Systems, BMP T5.10B Downspout Dispersion Systems, or BMP T5.10C Perforated Stub-out Connections
o BMP T5.11 Concentrated Flow Dispersion or BMP T5.12 Sheet Flow Dispersion
• Projects that do not drain to the City’s MS4 system are required to either discharge to the downstream property or to an on-site system from List No. 1 from ECDC 18.30.060
6 Runoff Treatment • Stormwater treatment facilities shall be provided in accordance of Volume V of the Drainage Manual for each threshold discharge area • Stormwater treatment facilities shall be provided in accordance with the SMMWW
7 Flow Control • The Project does not discharge stormwater directly or indirectly into a fresh water system and it therefore not subject to the requirements of MR7
8 Wetland Protection • The Project does not discharge stormwater directly or indirectly into a fresh water system and it therefore not subject to the requirements of MR8
9 Operation and Maintenance • An operation and maintenance manual is required for proposed stormwater treatment BMPs that is consistent with the provisions in Volume V of the Drainage Manual • An operation and maintenance manual is required for proposed stormwater treatment BMPs that is consistent with the provisions in Volume I and Volume V of the SMMWW
Stormwater Site Plan 21 November 2018
DRAFT
3.1 Minimum Requirement 1 – Preparation of a Stormwater Site Plan
MR1 requires that a Stormwater Site Plan (SSP) be prepared for the proposed project in accordance
with Chapter 3 of the Snohomish County Drainage Manual. This report is intended to include all the
technical information and analysis required for a SSP. The requirements outlined in the Snohomish
County Drainage Manual indicate that the SSP report should include the following elements:
• A project overview narrative describing pre-developed and developed site conditions
• A vicinity or location map that shows the project location, identifies roads bordering the site,
shows the route of stormwater through the site, and shows significant geographic features
• Stormwater site planning sheets (maps and drawings) that show drainage basin boundaries,
existing drainage to and from the site, routes of existing drainage, flow lengths, proposed
control and treatment facilities, significant geographic features, critical areas, and soils
• A summary of existing site conditions
• A description of any areas of site limitation
• An off-site analysis evaluating impacts to upstream and downstream properties
• Proposed drainage design, including the basis of BMP selection
• A construction stormwater pollution prevention plan (SWPPP)
• Drawings and a description of permanent stormwater control facilities
• Special reports, studies, and maps prepared to support the SSP report
• A list of necessary permits and approvals required by other agencies
• An operation and maintenance manual for each flow control and treatment facility
• Documentation to establish the appropriate security device amount when required under
Chapter 30.84 of the SCC.
The requirements outlined in Appendix C of the City of Edmonds Stormwater Addendum indicate
that the SSP report should comply with the requirements for a SSP from Volume I, Chapter 3, of the
SWMMWW and include the following elements:
• A project overview narrative describing pre-developed and developed site conditions,
including any maps or drawings needed to support the project overview
• A summary of existing site conditions
• A summary of developed site hydrology, including scaled drawings, a summary of how the
site will comply with applicable stormwater management requirements, justification for
selection of stormwater BMPs, an off-site analysis, and other supporting documentation
• A soils report
• A construction SWPPP
• Establishment of a Maintenance Covenant, including operations and maintenance (O&M)
requirements and completion of a City-approved maintenance covenant form
Stormwater Site Plan 22 November 2018
DRAFT
This report has been prepared as the required SSP for the project and is intended to include
information to satisfy both the Snohomish County and City of Edmonds requirements.
3.2 Minimum Requirement 2 – Construction Stormwater Pollution
Prevention Plan
MR2 requires that a construction Stormwater Pollution Prevention Plan (SWPPP) be prepared in
accordance with Volume II, Chapter 3, of the Snohomish County Drainage Manual and SWMMWW,
Chapter 2, Section 2.5.2, as supplemented by the City of Edmonds Stormwater Addendum. The
required SWPPP should include a narrative, drawings, and a turbidity and pH monitoring plan. The
SWPPP is required to demonstrate compliance with the following elements:
1. Preserve Vegetation/Mark Clearing
Limits
2. Establish Construction Access
3. Control Flow Rates
4. Install Sediment Controls
5. Stabilize Soils
6. Protect Slopes
7. Protect Drain Inlets
8. Stabilize Channels and Outlets
9. Control Pollutants
10. Control Dewatering
11. Maintain BMPs
12. Manage the Project
13. Protect Low Impact Development BMPs
The SWPPP also requires temporary erosion and sediment control drawings, summaries of
construction BMPs that will be implemented to satisfy the minimum elements required by the
Snohomish County Drainage Manual, recommended forms and methods for inspecting and
maintaining BMPs, and other documentation needed to secure a construction stormwater permit for
the project. A draft SWPPP for the project is included as Appendix D to this SSP report. The SWPPP
will be finalized and submitted for construction permits. Snohomish County anticipates that the
Construction Stormwater General Permit compliance responsibility will be transferred to the
Contractor during construction, and that the Contractor will ultimately be responsible for reviewing
and update the SWPPP, as needed to demonstrate compliance.
3.3 Minimum Requirement 3 – Source Control of Pollution
Source control of pollutants during the construction phase of the project will be addressed in
accordance with the SCC, the ECDC, approved SWPPP, and permit requirements. Post-construction
BMPs will include both operational and structural BMPs. Operational BMPs are practices or
procedures that prevent or reduce pollutants from entering stormwater. Structural BMPs are physical
or mechanical devices that prevent or reduce pollutants from entering stormwater or that remove
pollutants through treatment after entrainment in stormwater. Post-construction structural BMPs
proposed for the project are described in Section 4.
Stormwater Site Plan 23 November 2018
DRAFT
Because the project involves the restoration of a County park, no industrial activities will be
conducted on site. Operational BMPs will consist of those applicable to landscaping and lawn or
vegetation management and management of waste from recreational facilities. The County will be
responsible for landscape management consistent with established maintenance procedures
regarding the use of pesticides, herbicides, and fertilizers adjacent to a marine environment. The
County will also be responsible for management of waste from recreational facilities, including
portable restroom facilities, consistent with County maintenance procedures to prevent waste or
untreated sewage from entering the stormwater system or Puget Sound. Because this is a
jurisdiction-owned public facility, a formal source control plan is not required.
3.4 Minimum Requirement 4 – Preservation of Natural Drainage
Systems and Outfalls
MR4 requires that natural drainage patterns be maintained and that discharge from the site occur at
the natural location, to the maximum extent practicable. Runoff from the completed project will be
infiltrated runoff to Lund’s Gulch Creek or drain to Puget Sound via a storm drain system and
constructed open channel discharging at the MHHW mark within the restored estuary. The natural
outlet for runoff from the site is Lund’s Gulch Creek outlet to Puget Sound. Runoff from the site will
continue to flow to Lund’s Gulch Creek or the restored estuary at the mouth of Lund’s Gulch Creek.
Proposed drainage improvements have been designed to preserve existing drainage systems. To the
maximum extent feasible, runoff from impervious surfaces near Lund’s Gulch Creek or the shoreline
has been designed to sheet flow to adjacent vegetated areas, consistent with existing drainage
conditions. Storm drainage improvements have also been designed to maintain flow capacity
through the site for off-site flows.
3.5 Minimum Requirement 5 – On-Site Stormwater Management
MR5 requires that stormwater management BMPs be implemented to infiltrate, disperse, or retain
stormwater runoff on site, where feasible, without causing flooding or erosion impacts. To the extent
possible, the design includes BMPs that will disperse runoff. However, the depth to the seasonal
groundwater is relatively shallow through most of the lower ravine, and the native soils are not likely
to provide capacity for infiltration. Where required, on-site runoff will be collected, conveyed, and
treated prior to discharge to Puget Sound, as described in this report. Where new landscaping and
lawn areas are established, soil quality BMPs will be implemented. BMPs will be in accordance with
the requirements of Snohomish County Drainage Manual and the SWMMWW, as supplemented or
modified by the City of Edmonds Stormwater Addendum.
The process for selecting and evaluating feasibility of BMPs for projects within Snohomish County is
outlined in Volume I, Chapters 2 and 4, of the Snohomish County Drainage Manual. Projects
triggering the need to meet MRs 1–9 are either required to demonstrate compliance with the low
Stormwater Site Plan 24 November 2018
DRAFT
impact development (LID) Performance Standard or use on-site stormwater management BMPs from
List No. 2 in Section 2.5.5 of Volume I of the Snohomish County Drainage Manual. The selection of
appropriate BMPs requires evaluation of the potential for priority BMPs that infiltrate, disperse, or
retain stormwater runoff on-site. The first BMP considered feasible from List No. 2 is used for
meeting the appropriate stormwater control requirements for runoff from each surface.
Projects that require compliance with MRs 1–9 are referred to as Category 2 projects by the City of
Edmonds EDCD 18.30. Category 2 projects are also required to either demonstrate compliance with
the LID Performance Standard outlined in the City of Edmonds EDCD 18.30 or use on-site stormwater
management BMPs from List No. 2. The EDCD requires use of the first BMP considered feasible from
list No. 2 for meeting the appropriate stormwater control requirements.
3.6 Minimum Requirement 6 – Runoff Treatment
MR6 requires that runoff treatment BMPs be incorporated into the project to treat runoff from PGHS
prior to discharge to Puget Sound or to groundwater. The Snohomish County Drainage Manual
requires treatment for projects where the total PGHS in a TDA is 5,000 sf or more, or where the total
of pollution-generating pervious surfaces is 0.75 acre or more. As shown in Table 2-2 and Appendix
B, the project will result in more than 5,000 sf of PGHS within TDA 1, so treatment of runoff from all
PGHS and pollution-generating pervious surfaces (PGPS) within TDA 1 will be required.
Off-site flows and runoff from other on-site surfaces (non-pollution generating surfaces and existing
impervious surfaces to remain) must also be treated if those flows enter the site and mix with flows
from PGHS or PGPS upstream of treatment. To the extent possible, on-site flows from PGHS will be
segregated from off-site or run-on flows upstream of treatment facilities. Where flows are not
segregated, treatment will be provided for flows from surfaces requiring treatment and run-on flows.
Treatment BMPs are identified in Section 4.
The City of Edmonds requires that all projects not zoned as single-family residential that collect
runoff from five or more parking spaces shall install floatable controls in catch basins if another
approved floatable control system is not employed.
3.7 Minimum Requirement 7 – Flow Control
MR7 requires that projects meeting certain thresholds provide flow control to reduce the impacts of
stormwater runoff from impervious surfaces and land cover conversions. However, the Snohomish
County Drainage Manual indicates that flow control only applies to projects that discharge
stormwater directly or indirectly into a fresh water system. The SWMMWW provides flow control
requirements that apply to the City of Edmonds and also indicates that flow control applies only to
projects that discharge directly or indirectly to fresh water. Concentrated, treated runoff from the
project site will be conveyed via storm drains and swales designed to discharge flows to Puget
Stormwater Site Plan 25 November 2018
DRAFT
Sound at the MHHW mark within the restored estuary at the mount of Lund’s Gulch Creek.
Therefore, no flow control BMPs are required for the project.
3.8 Minimum Requirement 8 – Wetlands Protection
MR8 applies to development and redevelopment projects that discharge stormwater to a stream that
leads to a wetland, or to a wetland that has an outflow to a stream. MR8 requires that projects
protect wetland functions and values by preserving wetland hydrology and preventing increase in
the amount of pollutants discharged to a wetland. A wetlands survey was completed as a basis for
permitting the project, and several small wetland areas were identified at the project site, as shown in
Figures 2-3 and 2-4 and Drawings EC-1 through EC-3 (Appendix A). The existing wetland areas are
summarized as follows:
• Wetland A: Wetland A is a 0.13-acre wetland (Category III, per both Ecology and Snohomish
County Rating Systems) located in a depression east of the BNSF railroad embankment and
south of the toe of a steep slope at the NE corner of the site. No work will occur in the
wetland area. Wetland hydrology and water quality will not be impacted by the project.
• Wetland B: Wetland B is a 0.21-acre wetland (Category II, per both Ecology and Snohomish
County Rating Systems) adjacent to the south side (left bank) of Lund’s Gulch Creek within the
lower park area. A small, raised wooden walkway will be constructed across the wetland to a
connect pathways in the lower park to a new bridge that will cross Lund’s Gulch Creek.
Wetland hydrology and water quality will not be impacted by the project.
• Wetland C: Wetland C is a 0.03-acre wetland (Category II, per both Ecology and Snohomish
County Rating Systems) adjacent to the south side (left bank) of Lund’s Gulch Creek just north
of the ADA and ranger access parking area. No work will occur in the wetland area. Wetland
hydrology and water quality will not be impacted by the project.
• Wetland D: Wetland D is a 0.10-acre wetland (Category III, per both Ecology and Snohomish
County Rating Systems) adjacent to the south side (left bank) of Lund’s Gulch Creek just east
of the hairpin turn at the lower end of the access road. No work will occur in the wetland area.
Some runoff that currently discharges from the access road to the wetland area will be
captured by the new storm drain system in the access road. However, it appears that wetland
hydrology is primarily sustained by seepage from the hillside, so no significant change is
wetland hydrology or water quality is anticipated as part of the project.
• Wetland E: Wetland E is a 0.05-acre wetland (Category III, per both Ecology and Snohomish
County Rating Systems) adjacent to the north side (right bank) of Lund’s Gulch Creek just
upstream of the existing bridge. No work will occur in the wetland area. Wetland hydrology
and water quality will not be impacted by the project.
• Wetland F: Wetland F is a 0.08-acre wetland (Category IV, per both Ecology and Snohomish
County Rating Systems) located in a depression between the pathway that loops around the
Stormwater Site Plan 26 November 2018
DRAFT
south side of the lower park and the toe of a steep slope to the south. No work will occur in
the wetland area. The pathway adjacent to the wetland will be resurfaced and designed so
that runoff from the pathway flows away from the wetland. Runoff from the existing pathway
likely flows to the wetland. However, it appears that wetland hydrology is primarily sustained
by seepage from the hillside above the wetland, so no significant change in wetland
hydrology or water quality is anticipated as part of the project.
• Wetland G: Wetland G is a 0.22-acre wetland (Category III, per both Ecology and Snohomish
County Rating Systems) adjacent to the north side (right bank) of Lund’s Gulch Creek across
from the lower park area. No work will occur in the wetland area. Wetland hydrology and
water quality will not be impacted by the project.
• Wetland H: Wetland H is a 0.05-acre wetland (Category II, per both Ecology and Snohomish
County Rating Systems) adjacent to the south side (left bank) of Lund’s Gulch Creek
downstream of the existing pedestrian bridge. No work will occur in the wetland area.
Wetland hydrology and water quality will not be impacted by the project.
3.9 Minimum Requirement 9 – Operations and Maintenance
MR9 requires that the agency or parties responsible for O&M of drainage facilities in Snohomish
County adhere to requirements set forth in Volume 5, Chapter 4, of the Snohomish County Drainage
Manual, and SCC 30.63A.575 through 30.63A.605. In the City of Edmonds, the requirements are set
forth in ECDC 18.30.060.D.9 and the submittal checklist from Appendix C of the City of Edmonds
Stormwater Addendum. It is anticipated that the proposed drainage improvements will be operated
and maintained by Snohomish County Parks and Recreation Department, in accordance with an
established O&M manual for their park facilities. Consequently, a project-specific O&M manual will
not be prepared for this project. Manufacturer-supplied operation and maintenance information
specific to the facilities installed as part of the project will be submitted to the County for inclusion
with its existing O&M documentation.
Stormwater Site Plan 27 November 2018
DRAFT
4 Drainage Analysis and Conceptual Design
Hydrologic and hydraulic analyses were completed to estimate design flow rates and verify sizing
and capacity for the proposed drainage improvements illustrated on Figure 2-4 and detailed in the
utility drawings included in Appendix A. Detailed results of the hydrologic analysis are provided in
Appendix E. Detailed hydraulic analysis of storm drainage improvements is provided in Appendix F,
which also includes sizing calculations and channel stability analysis for the rock-lined drainage
channel and wet bio-filtration swale.
4.1 Hydrologic Analyses
MGS Flood (version 4.46) hydrologic modeling software was used to estimate peak runoff flow rates
from the drainage areas at the site, for the design of improvements that will discharge stormwater
runoff to Puget Sound through or from the site under developed project conditions. MGS Flood was
developed by MGS Engineering Consultants for WSDOT to facilitate design of stormwater facilities,
primarily storage and treatment, for roadway projects in western Washington. MGS Flood is
approved by Ecology, Snohomish County, and the City of Edmonds for hydrologic analysis of
stormwater improvements. It uses the HSPF algorithm to simulate runoff from long-term
precipitation records. The model features extended precipitation and evaporation time-series: 120 to
158 years in length. All three runoff components (surface flow, interflow, and recharge to
groundwater) are evaluated by the model.
Proposed drainage areas and drainage improvements are illustrated on Figure 2-4. Table 2-1
includes a summary of existing pervious and hard surface areas within each existing drainage area at
the site. Table 2-2 includes a summary of proposed pervious and hard surface areas within each
proposed drainage area at the site. A more detailed breakdown of existing and post-development
land cover is included in Appendix B.
Both off- and on-site components of the runoff discharging from the site were evaluated. Each
drainage area was evaluated to estimate peak recurrence interval runoff rates. Pervious surfaces were
modeled using till-grass or till-forest land cover parameters. Roads, paved pathways, parking areas,
and rooftops were modeled as impervious or hard surface. MGS Flood model results for this analysis,
including inputs, computed peak discharge rates, and runoff volumes for the storm events, are
included in Appendix E. Table 4-1 summarizes the flow rates modeled for the post-developed
conditions from each drainage area at the proposed site.
Stormwater Site Plan 28 November 2018
DRAFT
Table 4-1 Proposed Post-Developed Conditions – Flow Rate Estimates
Area Drainage Area Description
Q2-year
(cfs)
Q25-year
(cfs)
Q100-year
(cfs)
QWQ1
(cfs)
VWQ1
(cf)
TDA 1
1 Access Road and Parking Area 0.31 0.63 0.75 0.15 10,191
2 Ranger Residence Area – Drains to Bio-filtration Swale 0.11 0.27 0.30 0.04 2,839
3A Area West of Ranger Station – Drains to Rock Swale 0.13 0.38 0.49 0.06 4,223
3B Area West of Ranger Station – Drains Directly to Creek/Estuary 0.07 0.21 0.30 0.04 3,054
4 North Side of Creek – Drains Directly to Creek/Estuary 0.30 0.78 0.95 0.26 20,159
5 Railroad Berm and Beach – Drains Directly to Puget Sound 0.21 0.35 0.52 0.09 2,924
TDA 2
6 Access Road Entrance and Off-Site Areas 0.10 0.23 0.29 0.07 5,540
Note:
1. Water quality flow rates and volumes represent 15-minute, on-line water quality analysis results.
4.2 BMP Selection and Analysis
4.2.1 BMP Selection Based on Feasibility
Compliance with MR5 requires compliance with the LID Performance Standard or selection of
permanent stormwater control BMPs based on a determination of feasibility or infeasibility of
potential BMPs from a prioritized list. Because MRs 1–9 only apply to TDA1, BMPs will only apply to
runoff from surfaces within TDA1.
In Snohomish County, projects triggering the need to meet MRs 1–9 are either required to
demonstrate compliance with the LID Performance Standard or use on-site stormwater management
BMPS from List No. 2 in Section 2.5.5 of Volume I of the Snohomish County Drainage Manual. The
first BMP considered feasible from List No. 2 is used to meet the appropriate stormwater control
requirements for runoff from each surface.
Projects that require compliance with MRs 1–9 are referred to as Category 2 projects by the City of
Edmonds EDCD 18.30. Category 2 projects are also required to either demonstrate compliance with
the LID Performance Standard outlined in the City of Edmonds EDCD 18.30 or use on-site stormwater
management BMPs from List No. 2. The EDCD requires use of the first BMP considered feasible from
list No. 2 for meeting the appropriate stormwater control requirements.
Table 4-2 summarizes how BMPs were selected from these lists and applied to the proposed design
of stormwater improvements for the project, by drainage area and surface type.
Stormwater Site Plan 29 November 2018
DRAFT
Table 4-2 Proposed Drainage BMP Feasibility and Selection
BMP Selection List No. 2 Snohomish County
BMP Selection List No. 2 City of Edmonds
TDA 1
Area 1
Access Road and Parking Area
Area 2
Ranger Residence Area
Area 3A
Area West of Ranger Station – Drains to Rock Swale
Area 3B
Area West of Ranger Station – Drains to Rock Swale
Area 4
Hillside and Park Area North of Creek
Area 5
Railroad Berm and Beach
Lawn and Landscaped Areas
1. BMP T5.13: Post-construction Soil Quality and Depth
2. BMP T5.13: Post-construction Soil Quality and Depth
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas.
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas.
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas.
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas..
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas.
BMP 5.13 is feasible, will be applied to new or replaced lawn and landscape areas.
Roofs
1. BMP T5.30: Full Dispersion 1. BMP T5.30: Full Dispersion There are no proposed new rooftops in Area 1. There are no proposed new rooftops in Area 2. A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
There are no proposed new rooftops in Area 3B. There are no proposed new rooftops in Area 4. There are no proposed new rooftops in Area 5.
2. Bio-retention 2. BMP T 5.14A: Rain Gardens There are no proposed new rooftops in Area 1. There are no proposed new rooftops in Area 2. Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
There are no proposed new rooftops in Area 3B. There are no proposed new rooftops in Area 4. There are no proposed new rooftops in Area 5..
3. BMP T5.10B: Downspout Dispersion 3. BMP T5.10B: Downspout Dispersion There are no proposed new rooftops in Area 1. There are no proposed new rooftops in Area 2. BMP T5.10B appears to be feasible. Runoff from new roofs will be dispersed from downspouts through adjacent lawn area.
There are no proposed new rooftops in Area 3B. There are no proposed new rooftops in Area 4. There are no proposed new rooftops in Area 5.
4. BMP T5.10C: Perforated Stub-out Connections 4. BMP T5.10C: Perforated Stub-out Connections There are no proposed new rooftops in Area 1. There are no proposed new rooftops in Area 2. N/A There are no proposed new rooftops in Area 3B. There are no proposed new rooftops in Area 4. There are no proposed new rooftops in Area 5.
5. Detention Vaults or Pipes There are no proposed new rooftops in Area 1. There are no proposed new rooftops in Area 2. N/A There are no proposed new rooftops in Area 3B. There are no proposed new rooftops in Area 4. There are no proposed new rooftops in Area 5.
Stormwater Site Plan 30 November 2018
DRAFT
BMP Selection List No. 2 Snohomish County
BMP Selection List No. 2 City of Edmonds
TDA 1
Area 1
Access Road and Parking Area
Area 2
Ranger Residence Area
Area 3A
Area West of Ranger Station – Drains to Rock Swale
Area 3B
Area West of Ranger Station – Drains to Rock Swale
Area 4
Hillside and Park Area North of Creek
Area 5
Railroad Berm and Beach
Other Hard Surfaces
1. BMP T5.30: Full Dispersion 1. BMP T5.30: Full Dispersion Some slopes are steeper than 15%. A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
A flowpath length of 100 feet through forest or native vegetation cannot be achieved.
2. Permeable Pavement 2. BMP T5.15: Permeable Pavement, or Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
3. Bio-retention 3. BMP T5.14A: Rain Gardens Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
Soil investigation indicates that vertical separation to seasonal high groundwater is less than 3 feet and that hydraulic conductivity of underlying soils is low.
4. BMP T5.12: Sheet Flow Dispersion, or
BMP T5.11: Concentrated Flow Dispersion
4. BMP T5.12: Sheet Flow Dispersion, or
BMP T5.11: Concentrated Flow Dispersion
BMP T5.12 appears to be feasible for hard pathway surfaces.
BMP T5.11 does not appear to be feasible for concentrated flow from access road and parking area due to size of drainage area and flowpath limitations.
BMP T5.12 appears to be feasible for hard pathway surfaces.
BMP T5.12 appears to be feasible for hard pathway surfaces.
BMP T5.12 appears to be feasible for hard pathway surfaces.
BMP T5.12 appears to be feasible for hard pathway surfaces.
BMP T5.12 appears to be feasible for hard pathway surfaces.
5. Detention Vaults or Pipes Concentrated flow from access road and parking area to be conveyed in storm drain facilities to discharge point at MHHW mark in restored estuary.
N/A N/A N/A N/A N/A
Stormwater Site Plan 31 November 2018
DRAFT
The primary limitation to incorporation of BMPs that rely on infiltration (infiltration, rain gardens,
bio-retention) is that the seasonal depth to high groundwater is very shallow, so the minimum 3-foot
separation required between the bottom of infiltration facilities and the seasonal high groundwater
cannot be achieved at the site. Shannon & Wilson completed a preliminary assessment of infiltration
potential and groundwater at likely infiltration locations using hand borings (Shannon & Wilson
2018). Two hand borings were completed in March 2017, as follows:
• HB-1 was drilled in the island adjacent to the existing ADA parking area. The summary of
conditions observed (depths referenced to adjacent parking lot pavement grade) is as follows:
‒ 0 to 1.3 feet: moist to wet, poorly graded gravel with silt and sand, wet (perched water)
below about 0.8 feet.
‒ Perching layer, 1.3 to 2 feet: wet, silty sand/sandy silt.
‒ Potential infiltration receptor: 2 to 5.5 feet: moist, silty sand.
‒ Aquifer: 5.5 to 9.9 feet: wet, silty sand.
‒ Static water level was about 5.5 feet below pavement grade, based on a measurement
made on March 19, 2017, about 1 day after a period of heavy rain.
• HB-2 was drilled in the lawn west of the ranger residence. The summary of conditions,
observed (measured relative to lawn surface) is as follows:
‒ 0 to 1 foot: wet, silty gravel with sand and cobbles and quarry spalls – perched water.
‒ Perching layer, 1 to 2 feet: moist, sandy silt with gravel.
‒ Potential infiltration receptor: 2 to 3 feet: moist, silty sand with gravel and cobbles.
‒ Aquifer: 3 to 6 feet: wet, interlayered silty sand and poorly graded sand with silt.
‒ Static water level was about 3.1 feet below grade, based on a measurement made on
March 19, 2017, about 1 day after a period of heavy rain.
Based on infiltration requirements provided in the Snohomish County Drainage Manual, Volume III,
the results indicate that subsurface soil conditions would not meet the site suitability criteria for
infiltration. Specifically, Site Suitability Criteria 5 requires that the base of the infiltration basin or
trench system shall be greater than or equal to 5 feet above the seasonal high-water mark, bedrock
(or hardpan), or other low permeability layer. This can be reduced down to 3 feet if a groundwater
mounding analysis is done to show that some other specific criteria are met. An infiltration facility,
such as pervious pavement, rain garden, or bio-retention facility, at any of these locations would
require a depth of at least 1 to 3 feet from the existing surface to the bottom of the infiltration layer.
Consequently, there is insufficient separation to the seasonal high groundwater to make an
infiltration facility feasible.
4.2.2 Treatment Menu and BMP Selection
Stormwater treatment is required for runoff from the access road and parking area surfaces, which
are PGHS, according to treatment menus provided in Chapter 4 of Volume I of the Snohomish County
Stormwater Site Plan 32 November 2018
DRAFT
Drainage Manual and in Chapter 3 of Volume V of the SWMMWW. The menus are provided in
Appendix G. The following menus were evaluated, consistent with those guidelines:
• Oil Control Menu: The project does not require oil-control BMPs because it is not a
commercial or industrial site with an average daily traffic (ADT) count equal to or greater than
100 vehicles per 1,000 sf of gross building area; is not subject to petroleum storage and
transfer; will not provide parking, storage, or maintenance for 25 or more vehicles over 10 tons
gross weight; and does not include a roadway intersection with an ADT count of 25,000
vehicles on the main roadway or more than 15,000 vehicles on any intersecting roadway.
• Phosphorus Treatment Menu: The project, which will discharge stormwater directly to Puget
Sound, does not require phosphorus-removal BMPs.
• Enhanced Treatment Menu: The project does not meet the thresholds for enhanced
treatment. Although it is within an Urban Growth Management Area, it does not include
partially or fully controlled limited-access highways, and it does not include any roadways
with an annual ADT count of 7,500 or greater.
• Basic Treatment Menu: The project does require basic treatment of stormwater from PGHS
and PGPS. The design assumes that lawn and landscape areas will not be subject to traffic or
use of pesticides, fertilizers, or loss of soil and are not considered PGPS. Treatment will be
provided for runoff from PGHS in the access road and parking area. Basic Treatment BMPs are
designed to achieve 80% removal of total suspended solids for influent concentrations
greater than 100 milligrams per liter. Basic treatment BMPs include bio-infiltration swales,
infiltration, sand filters, bio-filtration swales, filter strips, wet ponds, wet vaults, wet bio-
filtration swales stormwater treatment wetlands, detention and wet-pool facilities, bio-
retention/ rain gardens, ecology embankments, and other approved manufactured filtration
devices.
4.2.3 Threshold Discharge Area 1
TDA 1 includes Drainage Areas 1–5, as shown on Figure 2-4. Stormwater runoff from TDA 1 will drain
to Puget Sound via a series of pipes and constructed channels. The following improvements are
proposed to improve drainage collection and convey runoff within this threshold discharge area:
• A network of 8- and 12-inch-diameter corrugated polyethylene (CPE) storm drain pipe and
catch basins will be installed to route runoff from PGHS in the access road and parking area to
a wet bio-filtration swale located in Drainage Area 2.
• The wet bio-filtration swale will be installed along the south edge of the paved loop pathway
near the lawn area. The wet bio-filtration swale will serve as the treatment BMP for runoff
from the access road, parking area, and other surfaces tributary to the storm drain facilities.
• Flow from the bio-filtration swale will be conveyed to a rock-lined swale located in the estuary
area via a 12-inch-diameter CPE storm drain pipe.
Stormwater Site Plan 33 November 2018
DRAFT
• The rock-lined swale will be constructed to convey the stormwater to the MHHW mark within
the estuary to meet requirements for discharging directly to Puget Sound through manmade
conveyance facilities.
• Runoff from impervious pathways will be dispersed through adjacent sheet flow dispersion
areas that will consist of a gravel dissipating strip and landscaping that will provide the
needed 10 feet of vegetated flow path for every 20 feet of contributing surface.
• Runoff from roofs will be dispersed through adjacent lawn areas or landscaping.
Sizing calculations for the wet bio-filtration swale and rock-lined swale are provided in Appendix F.
4.2.4 Threshold Discharge Area 2
A portion of the proposed work is located in TDA 2, which comprises Drainage Area 6. TDA 2 is not
tributary to the outlet of Lund’s Gulch Creek, but instead discharges to Puget Sound through a
culvert in the railroad berm somewhere south of the project site. Improvements in this area will result
in less than 5,000 sf of new or replaced impervious surface and will only be subject to MR2.
4.3 Off-Site Analysis
The MRs require that an off-site analysis be conducted to assess potential off-site impacts of
stormwater discharges that extend downstream from the site to the receiving water. The project site
borders Puget Sound, and all stormwater runoff will be conveyed directly to Puget Sound or
dispersed on site; therefore, no downstream impacts are expected. The analysis must also extend
upstream to a point beyond any backwater effects caused by the project. Because all runoff will be
dispersed on site or conveyed to Puget Sound utilizing an entirely man-made conveyance system, no
backwater effects are expected.
4.4 Storm Drain System Sizing and Hydraulic Analysis
Storm drain system improvements are shown on Figure 2-4 and in more detail on the utility
drawings included in Appendix A. Hydraulic analysis needed to size and evaluate new storm drains,
catch basins, and other facilities was completed using a Microsoft Excel-based spreadsheet that
calculates the hydraulic profile in a gravity pipe system, using the standard step-backwater method;
this analysis is provided in Appendix E. New storm drain pipe will be CPE conforming to ASTM F2648,
and will include 8- and 12-inch-diameter pipe.
Analysis was also used to verify sizing of cobbles and boulders that will be used to stabilize the open
channel that will be created to convey runoff through the restored estuary to Puget Sound. This
analysis was completed using methods presented in the U.S. Army Corps of Engineers publication
Hydraulic Design of Flood Control Channels (USACE 1991) and is also included in Appendix F.
Stormwater Site Plan 34 November 2018
DRAFT
5 Conclusions and Recommendations
The proposed Meadowdale Beach Park and Estuary Restoration project will restore ecological
functions and expand the Lund’s Gulch Creek estuary, improve habitat conditions for salmon and
other wildlife in lower Lund’s Gulch Creek, address public safety issues involving the existing railroad
crossing, and improve access (including ADA-compliant access) to the beach. The project requires
stormwater improvements that meet the requirements of the Snohomish County Drainage Manual,
the SWMMWW, and the City of Edmonds Stormwater Addendum.
Proposed improvements will result in the addition of 4,769 sf of new hard surface and replacement
of 32,909 sf of existing hard surface. The proposed site will include a total of 73,443 sf of hard
surfaces, including approximately 35,738 sf of existing impervious surface that will not be modified
by the project. Existing impervious surfaces make up less than 2% of the existing park site, so the
project is characterized as a “New Development” project by the Snohomish County Drainage Manual.
Due to the quantity of new and replaced impervious surfaces that will result from the project, all of
the MRs outlined in the Snohomish County Drainage Manual and the City of Edmonds Stormwater
Addendum will apply to new and replaced impervious surfaces and converted pervious surfaces
within TDA 1, which includes all project areas that drain to Lund’s Gulch Creek or the Puget Sound
shoreline. Based on BMP selection, hydrologic modeling, and hydraulic analysis, the following
stormwater improvements are recommended to meet the MRs for the developed site condition:
• A network of 8- and 12-inch-diameter CPE storm drain pipe and catch basins will be installed
to capture and convey runoff from PGHS in the access road and parking area to a wet bio-
filtration swale located in Drainage Area 2.
• The wet bio-filtration swale will be installed along the south edge of the paved loop pathway
near the lawn area. The wet bio-filtration swale will serve as the treatment BMP for runoff
from the access road, parking area, and other surfaces tributary to the storm drain facilities.
• Flow from the bio-filtration swale will be conveyed to a rock-lined swale located in the estuary
area via a 12-inch-diameter CPE storm drain pipe.
• The rock-lined swale will be constructed to convey the stormwater to the MHHW mark within
the estuary to meet requirements for discharging directly to Puget Sound through manmade
conveyance facilities.
• Runoff from impervious pathways will be dispersed through adjacent sheet flow dispersion
areas that will consist of a gravel dissipating strip and landscaping that will provide the
needed 10 feet of vegetated flow path for every 20 feet of contributing surface.
• Runoff from roofs will be dispersed through adjacent lawn areas or landscaping.
The detailed design analysis, utility plans, and other supporting documents provided with this report
are intended to be submitted to meet the requirements for SSP review, approval, and permitting.
Stormwater Site Plan 35 November 2018
DRAFT
6 References
Anchor QEA (Anchor QEA, LLC), 2016. Feasibility Report: Meadowdale Beach County Park Feasibility
Study. Prepared for Snohomish County. August 2015. Available at: http://bit.ly/2pXV8le
Bruce Dees (Bruce Dees & Associates), 1986. Master Plan Report: Meadowdale Beach County Park.
September 1986.
City of Edmonds, 2007. City of Edmonds Modifications to the Standard Specifications. April 2, 2007.
City of Edmonds, 2016. Edmonds Standard Details. Amended 2016.
City of Edmonds, 2017a. Edmonds Community Development Code. Passed August 15, 2017.
City of Edmonds, 2017b. Addendum to Edmonds Community Development Code Chapter 18.30
(Edmonds Stormwater Addendum).
Dailer, Doug (Park Ranger, Snohomish County Parks and Recreation), 2015. Personal communication
with Peter Hummel (Anchor QEA) during site visit on March 5, 2015.
Ecology (Washington State Department of Ecology), 2014. Stormwater Management Manual for
Western Washington, as amended in December 2014.
Shannon & Wilson, 2018. Geotechnical Report: Meadowdale Beach Park and Estuary Restoration.
Prepared for Snohomish County Parks & Recreation. February 2018.
Snohomish County, 2002. Puget Sound Tributaries Drainage Needs Report. DNR No. 11. Snohomish
County Public Works Department, Surface Water Management Division. December 2002.
Available at: http://snohomishcountywa.gov/1079/Urban-Drainage.
Snohomish County, 2015. Snohomish County website. Accessed March 2015. Available at:
http://snohomishcountywa.gov/Facilities/Facility/Details/Meadowdale-Beach-Park-56
Snohomish County, 2016a. Snohomish County Engineering and Design Standards. Effective
January 22, 2016.
Snohomish County, 2016b. Snohomish County Drainage Manual. January 2016.
Snohomish County, 2017. Snohomish County Code. Chapter 30.63A (Drainage). Passed September 13,
2017.
USACE (U.S. Army Corps of Engineers), 1991. Hydraulic Design of Flood Control Channels. Engineer
Manual No. 1110-2-1601. July 1991.
WSDOT (Washington State Department of Transportation), 2017. 2018 Standard Specifications for
Road, Bridge, and Municipal Construction.
Appendix A
Utility Plans
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Cover Sheet.dwg G-1G-1
PLAN COVER SHEET 1 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
PERMIT SUBMITTAL
MEADOWDALE BEACH PARK AND ESTUARY DESIGN
SNOHOMISH COUNTY PARKS AND RECREATION
PROJECT SITE
Prime Consultant
Project Manager: Peter Hummel, PLA
Landscape Architect: Betsy Severtsen, PLA
Civil Engineer: David Rice, PE
720 Olive Way
Suite 1900
Seattle WA, 98101
(206) 287-9130
VICINITY MAPSOURCE: ESRI
0
SCALE IN FEET
2000 4000
NORTH
Not to Scale
TACOMA
VANCOUVER
BELLINGHAM
WASHINGTON
EDMONDS
EDMONDS
LYNNWOOD
PUGET
SOUND
SEATTLE
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
COUNTY EXECUTIVE: DAVE SOMERS
DIRECTOR OF PARKS AND RECREATION: TOM TEIGEN
COUNCIL DISTRICT 1: ROB PUTNAM
COUNCIL DISTRICT 2: JULIE LANGABEER
COUNCIL DISTRICT 3: JOHN BRINEY
COUNCIL DISTRICT 4: STEVE YANDL
COUNCIL DISTRICT 5: BOB MCCARTY
SITE ADDRESS: 15433 75TH PLACE WEST EDMONDS, WA 98026
TAX PARCEL NUMBERS: 00500900000500, 27040500200100,
27040500200200
LEGAL DESCRIPTIONS: SEE DRAWING G-3
PROJECT CESCL: TO BE DETERMINED BY CONTRACTOR
Owner
Logan Daniels
Snohomish County Parks and Recreation
6705 Puget Park Drive
Snohomish, WA 89296
(425) 388-6619
logan.daniels@snoco.org
EARTHWORK - APPROXIMATE GRADING QUANTITIES
GRADING LIMIT OF DISTURBANCE: 191,878 SF
CUT: 19,100 CY
FILL: 7,800 CY
SLOPES GREATER THAN 33% WITHIN PROJECT SITE AREA:
6,070 SF (0.14 AC)
DRAWING INDEX
SHT #DWG #TITLE
1 G-1 PLAN COVER SHEET
2 G-2 PLAN COVER SHEET
2a G-3 PLAN COVER SHEET
3 CS-1 COMPOSITE SITE PLAN (1 OF 3)
4 CS-2 COMPOSITE SITE PLAN (2 OF 3)
5 CS-3 COMPOSITE SITE PLAN (3 OF 3)
6 TA-1 TEMPORARY ACCESS AND STAGING PLAN
7 EC-1 EXISTING CONDITIONS PLAN (1 OF 3)
8 EC-2 EXISTING CONDITIONS PLAN (2 OF 3)
9 EC-3 EXISTING CONDITIONS PLAN (3 OF 3)
10 T-1 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (1 OF 3)
11 T-2 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (2 OF 3)
12 T-3 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (3 OF 3)
13 D-1 CLEARING AND DEMOLITION PLAN (1 OF 3)
14 D-2 CLEARING AND DEMOLITION PLAN (2 OF 3)
15 D-3 CLEARING AND DEMOLITION PLAN (3 OF 3)
16 CV-1 LAYOUT CONTROL PLAN (1 OF 3)
17 CV-2 LAYOUT CONTROL PLAN (2 OF 3)
18 CV-3 LAYOUT CONTROL PLAN (3 OF 3)
19 C-1 GRADING PLAN (1 OF 3)
20 C-2 GRADING PLAN (2 OF 3)
21 C-3 GRADING PLAN (3 OF 3)
22 C-4 GRADING CROSS-SECTIONS (1 OF 4)
23 C-5 GRADING CROSS-SECTIONS (2 OF 4)
24 C-6 GRADING CROSS-SECTIONS (3 OF 4)
25 C-7 GRADING CROSS SECTIONS (4 OF 4)
26 CM-1 CONSTRUCTION MATERIALS PLAN (1 OF 3)
27 CM-2 CONSTRUCTION MATERIALS PLAN (2 OF 3)
28 CM-3 CONSTRUCTION MATERIALS PLAN (3 OF 3)
29 CM-4 CONSTRUCTION MATERIAL DETAILS (1 OF 6)
30 CM-5 CONSTRUCTION MATERIAL DETAILS (2 OF 6)
31 CM-6 CONSTRUCTION MATERIAL DETAILS (3 OF 6)
32 CM-7 CONSTRUCTION MATERIAL DETAILS (4 OF 6)
33 CM-8 CONSTRUCTION MATERIAL DETAILS (5 OF 6)
34 CM-9 CONSTRUCTION MATERIAL DETAILS (6 OF 6)
35 RD-1 ROADWAY PLAN AND PROFILE (1 OF 2)
36 RD-2 ROADWAY PLAN AND PROFILE(2 OF 2)
37 RD-3 TYPICAL ACCESS ROADWAY SECTIONS
36 RD-2 ROADWAY PLAN AND PROFILE(2 OF 2)
DRAWING INDEX
SHT #DWG #TITLE
37 RD-3 TYPICAL ACCESS ROADWAY SECTIONS
38 RD-4 TYPICAL PARKING AREA SECTIONS
39 RD-5 ROADWAY AND PARKING AREA DETAILS
40 RD-6 ROADWAY REINFORCEMENT ELEVATIONS AND SECTIONS
41 RD-7 SPIRAL NAIL ROADWAY REINFORCEMENT DETAILS
42 RD-8 PARKING AREA STRIPING PLAN
43 CU-1 UTILITY PLAN (1 OF 2)
44 CU-2 UTILITY PLAN (2 OF 2)
45 CU-3 STORM DRAIN PROFILE
46 CU-4 DRAINAGE DETAILS
47 A1.0 ARCHITECTURAL GENERAL INFORMATION
48 A1.1 ARCHITECTURAL GENERAL NOTES
49 A2.0 PORTABLE TOILET ENCLOSURE FOUNDATION AND FLOOR PLANS
50 A2.1 ROOF PLANS
51 A3.0 PORTABLE TOILET ENCLOSURE ELEVATIONS
52 A3.1 EXISTING PICNIC SHELTER ELEVATIONS
53 A7.0 PORTABLE TOILET ENCLOSURE DETAILS
54 A7.1 PORTABLE TOILET ENCLOSURE ENLARGED ELEVATION, PICNIC SHELTER
COLUMN BASE DETAIL
55 S1.1 GENERAL STRUCTURAL NOTES
56 S1.2 GENERAL STRUCTURAL NOTES
57 S2.1 STRUCTURAL OVERVIEW SITE PLAN
58 S2.2 TOILET ENCLOSURE STRUCTURAL PLANS
59 S2.3 PEDESTRIAN BRIDGE ABUTMENT AND BOARDWALK PLANS
60 S3.1 TOILET ENCLOSURE STRUCTURAL TYPICAL CONCRETE DETAILS
61 S3.2 TOILET ENCLOSURE STRUCTURAL CONCRETE DETAILS
62 S3.3 PEDESTRIAN BRIDGE CONCRETE ABUTMENT DETAILS
63 S3.4 BOARDWALK DETAILS
64 S4.1 TOILET ENCLOSURE DETAILS
65 S-4 PEDESTRIAN BRIDGE DETAIL
66 E-1 ELECTRIC SITE PLAN
67 E-2 ELECTRIC NOTES, DETAILS AND SCHEDULES
68 I-1 IRRIGATION PLAN (1 OF 3)
69 I-2 IRRIGATION PLAN (2 OF 3)
70 I-3 IRRIGATION PLAN (3 OF 3)
71 I-4 IRRIGATION DETAILS
72 L-1 PLANTING PLAN (1 OF 3)
73 L-2 PLANTING PLAN (2 OF 3)
74 L-3 PLANTING PLAN (3 OF 3)
75 L-4 PLANTING DETAILS
MEADOWDALE BEACH PARK
168TH ST SW
164TH ST SW
INTERSTATE 575TH PL WN MEADOWDALE ROAD
Architectural Consultant
Salt Studio LLC
66 Bell Street Unit #1
Seattle, WA 98121
(206) 948-2104
Surveyor
Duane Hartman and Associates
16928 Woodinville-Redmond Road, Suite B-107
Woodinville, WA 98072
(425) 483-5355
Structural Engineering Consultant
Swenson Say Faget
2124 Third Ave, Suite 100
Seattle, WA 98121
(206) 443-6212
Mechanical Engineering Consultant
Rainbow Consulting
336 NW 50th St
Seattle, WA 98107
(206) 235-6002
Irrigation Consultant
William Stewart Design
9220 58th Avenue SE
Olympia, WA 98513
(206) 605-9863
Electrical Engineering Consultant
Cross Engineers
923 Martin Luther King Jr. Way
Tacoma, WA 98405
(253) 759-0118
Activity Snohomish County City of Edmonds Total
New impervious surfaces 3,964 666 4,630
Replaced impervious surfaces 17,103 26,584 43,687
Removed impervious surfaces -6,562 -2,839 -9,401
Net Change Total -2,598 -2,173 -4,771
BNSF RAILWAYPUGET
SOUND
LUND
S
CREEK
GUL
C
H
LUNDS
G
U
L
C
H
CREEK
OFF-CHANNELPOND
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Site Context and Layout Plan.dwg 2 G-20
SCALE IN FEET
80 160
NORTH
X-1
X-2
X-3
PUGET SOUND
LEGEND:
PROJECT BOUNDARY
CITY OF EDMONDS/SNOHOMISH COUNTY
BOUNDARY
PARK BOUNDARY
PARCEL BOUNDARY
BNSF RIGHT-OF-WAY
BNSF CENTERLINE
EXISTING OHWM
EXISTING MHHW (EL. +9.0' MLLW)
EXISTING LUND GULCH CREEK THALWEG
EXISTING WETLAND TO BE PROTECTED
75TH PL W.G-2
PLAN COVER SHEET 2 75
PH/BS
CH/TG
BS
PH
1" = 80'
NOVEMBER 2018
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
RANGER RESIDENCE
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Cover Sheet.dwg 2a G-3G-3
PLAN COVER SHEET 2A 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
GENERAL NOTES:
1.ALL EMPLOYEES MUST COMPLY WITH BNSF SAFETY REQUIREMENTS. THIS INCLUDES, BUT IS NOT LIMITED TO, PASSING A
SAFETY COURSE, OBTAINING DOCUMENTATION OF SUCCESSFULLY PASSING THE COURSE, AND ADHERING TO
REQUIREMENTS IDENTIFIED IN THE COURSE. THE REQUIRED BNSF SAFETY COURSE MAY BE ACCESSED AT THE FOLLOWING
WEBSITE: WWW.RAILROADCOURSES.COM.
2.A BNSF FLAGGER SHALL BE PRESENT ANY TIME THE CONTRACTOR IS WORKING WITHIN 25 FEET OF THE TRACKS. THE
CONTRACTOR SHALL COMMUNICATE WITH THE OWNER TO ARRANGE FOR A FLAGGER TO BE PRESENT DURING THESE
TIMES.
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR. SOME INFORMATION WILL BE LOST WITH BLACK AND WHITE VIEWING.
SURVEY NOTES:
1.SURVEY BY DUANE HARTMAN & ASSOCIATES, INC IN 2017.
2.HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE NAD83(91), U.S. FEET UTILIZING RTK GPS
FIELD PROCEDURES
3.VERTICAL DATUM: TO CONVERT ELEVATIONS SHOWN HEREON TO MEAN LOWER LOW WATER DATUM PLEASE ADD 2.05
FEET.
4.UTILITIES MAPPING: ALL EXISTING UTILITIES SHOWN HEREIN ARE TO BE VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO
ANY CONSTRUCTION. ALL EXISTING FEATURES INCLUDING BURIED UTILITIES ARE SHOWN AS INDICATED BY RECORD
LOCATION OR FIELD TIED AS A RESULT OF A UTILITY PAINT-OUT DURING THE COURSE OF THE FIELD SURVEY. DUANE
HARTMAN & ASSOCIATES, INC. (DHA) ASSUMES NO LIABILITY FOR THE ACCURACY OF THE RECORD INFORMATION. FOR THE
FINAL LOCATION OF THE EXISTING UTILITIES IN AREAS CRITICAL TO CONSTRUCTION, CONTACT THE UTILITY
OWNER/AGENCY AND UTILITIES UNDERGROUND CENTER (800/424-5555).
5.TOPOGRAPHIC MAPPING: THE MAP SHOWN HEREON IS THE RESULT OF A TOPOGRAPHIC SURVEY BY DUANE HARTMAN &
ASSOCIATES, INC. (DHA) COMPLETED ON OCTOBER 2016. DHA ASSUMES NO LIABILITY, BEYOND SAID DATE, FOR ANY
FUTURE SURFACE FEATURE MODIFICATIONS OR CONSTRUCTION ACTIVITIES THAT MAY OCCUR WITHIN OR ADJOINING THE
PERIMETER OF THIS SURVEY. CONTACT DHA (425) 483-5355 FOR SITE UPDATES AND VERIFICATIONS.
6.RAILROAD RIGHT OF WAY LINES: THE BNSF RAILWAY RIGHT OF WAY LINES SHOWN HEREON HAVE BEEN CALCULATED USING
TRACK STATIONING, RAILROAD GEOMETRY AND CADASTRAL CALL OUTS AS SHOWN ON "BNSF RAILWAY RIGHT OF WAY".
LEGAL DESCRIPTION:
DETAIL AND SECTION REFERENCING:
DETAIL REFERENCE NUMBER
DRAWING ON WHICH DETAIL APPEARS
"-" INDICATES TYPICAL OR ON SAME DRAWING
DETAIL REFERENCE NUMBER
SECTION "A" IS SHOWN ON DRAWING "C-2"
INDICATES DIRECTION
OF CUTTING PLAN
SECTION REFERENCE NUMBER
1
C-1
SCALE:
DETAIL1
-1" = 10'
A
C-2
SCALE:
SECTIONA
-1" = 10'
GENERAL CONSTRUCTION NOTES:
1.UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR IN THE SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE ACCOMPLISHED
IN ACCORDANCE WITH THE CURRENT SNOHOMISH COUNTY ENGINEERING DESIGN AND DEVELOPMENT STANDARDS, THE CITY OF EDMONDS
COMMUNITY DEVELOPMENT CODE, THE SNOHOMISH COUNTY DRAINAGE MANUAL, THE CITY OF EDMONDS STORMWATER MANAGEMENT
CODE, THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION), AND OTHER
APPLICABLE CODES AND STANDARDS.
2.THE CONTRACTOR SHALL HAVE COPIES OF THE APPROVED DRAWINGS, APPLICABLE SNOHOMISH COUNTY AND CITY OF EDMONDS STANDARDS,
AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION) ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
3.THE CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO CONSTRUCTION AND SHALL BE RESPONSIBLE FOR VERIFYING FIELD CONDITIONS AND
DIMENSIONS, AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON THESE DRAWINGS. ANY DISCREPANCIES BETWEEN
THE EXISTING FIELD CONDITIONS AND THE DRAWINGS OR ANY INCONSISTENCIES OR AMBIGUITIES BETWEEN THE DRAWINGS AND OTHER
CONTRACT DOCUMENTS SHALL BE REPORTED IN WRITING TO THE OWNER (SNOHOMISH COUNTY) PRIOR TO PROCEEDING WITH THE WORK.
WORK DONE BY THE CONTRACTOR INVOLVING SUCH DISCREPANCIES WITHOUT A WRITTEN REPORT AND RESPONSE FROM THE OWNER SHALL
BE DONE AT THE CONTRACTOR'S SOLE RISK AND EXPENSE.
4.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION,
INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND IS NOT LIMITED TO NORMAL
WORKING HOURS.
5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND
ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH
THE PERFORMANCE OF WORK COVERED BY THE CONTRACT.
6.THE CONTRACTOR SHALL PROVIDE TEMPORARY CUT SLOPES AND SHORING AS NECESSARY FOR THE CONSTRUCTION AS SHOWN ON THESE
DRAWINGS. THE STABILITY OF ALL TEMPORARY SLOPES AND SHORING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
7.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES
AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THIS CONTRACT.
8.THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO PROTECT EXISTING STRUCTURES, SIGNS, FENCES, GATES, CURBS, ROADWAYS,
DRAINAGE WAYS, CULVERTS, VEGETATION, AND OTHER IMPROVEMENTS UNLESS AND UNTIL SUCH ITEMS ARE TO BE DISTURBED OR REMOVED
AS INDICATED ON THE DRAWINGS. IF SUCH ITEMS ARE DAMAGED OR NEED TO BE REMOVED OR MODIFIED TO FACILITATE CONSTRUCTION, THE
CONTRACTOR SHALL FIRST NOTIFY SNOHOMISH COUNTY AND THEN REPLACE OR REPAIR THE ITEMS TO EQUAL OR BETTER CONDITION TO THE
SATISFACTION OF SNOHOMISH COUNTY.
9.THE CONTRACTOR SHALL NOT DISTURB OR DESTROY ANY EXISTING SURVEY MONUMENT OR BENCHMARK. ANY SURVEY MONUMENT OR
BENCHMARK DISTURBED OR DESTROYED BY THE CONTRACTOR SHALL BE REPLACED AS DIRECTED BY SNOHOMISH COUNTY AT THE
CONTRACTOR'S SOLE EXPENSE.
10.THE CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO THE RANGER RESIDENCE THROUGHOUT CONSTRUCTION OF THE PROJECT. ANY
TEMPORARY DISRUPTION OF ACCESS TO THE RANGER RESIDENCE SHALL BE AND APPROVED BY SNOHOMISH COUNTY.
11.WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE SAME AS FOR OTHER SIMILAR WORK.
12.THE DETAILS AND NOTES PROVIDED ON THE DRAWINGS AND IN THE SPECIFICATIONS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES.
13.DIMENSION CALL-OUTS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON THE CONTRACT DOCUMENTS.
14.ALL MATERIALS SHALL BE NEW AND UNDAMAGED, UNLESS OTHERWISE APPROVED BY SNOHOMISH COUNTY AND THE ENGINEER. THE SAME
MANUFACTURER OF EACH ITEM SHALL BE USED THROUGHOUT THE WORK UNLESS OTHERWISE APPROVED BY SNOHOMISH COUNTY AND THE
ENGINEER.
15.RUBBISH, DEBRIS, AND GARBAGE SHALL BE REMOVED FROM THE JOB SITE AND DISPOSED OF LEGALLY, AS ALLOWED BY THE SNOHOMISH
COUNTY ENGINEERING DESIGN AND DEVELOPMENT STANDARDS AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND
MUNICIPAL CONSTRUCTION (CURRENT EDITION).
16.THE CONTRACTOR SHALL MAINTAIN HAND DRAWN REDLINES, FIELD NOTES AND PHOTOGRAPHS ("FIELD DOCUMENTATION") OF ALL
IMPROVEMENTS AS THE WORK PROGRESSES, AS REQUIRED BY THE SPECIFICATIONS. THE CONTRACTOR SHALL ALSO TAKE PHOTOGRAPHS AND
VIDEO TO DOCUMENT CONDITIONS PRIOR TO CONSTRUCTION. THE CONTRACTOR'S FIELD DOCUMENTATION SHALL BE MAINTAINED ON SITE
AND SHALL BE AVAILABLE FOR REVIEW BY SNOHOMISH COUNTY AND THE ENGINEER AT ALL TIMES.
EXISTING UTILITY NOTES:
1.THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND ARE BASED ON SURVEYED UTILITY MARKINGS
AND FEATURES VISIBLE AT THE SURFACE, SUPPLEMENTED BY AS-BUILT INFORMATION PROVIDED BY SNOHOMISH COUNTY.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING ALL UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CALL THE
UTILITY LOCATION REQUEST CENTER (ONE-CALL CENTER) AT 811 OR 1-800-424-5555 FOR UTILITY LOCATIONS NOT LESS THAN TWO (2) BUSINESS
DAYS BEFORE THE SCHEDULED DATE FOR TRENCHING OR EARTHWORK THAT MAY IMPACT EXISTING UTILITIES.
3.THE SIZE, LOCATION, AND TYPE OF UNDERGROUND UTILITIES EXPOSED OR MODIFIED BY THE CONTRACTOR SHALL BE ACCURATELY NOTED AND
PLACED ON THE CONTRACTOR'S RECORD DRAWINGS.
4.THE CONDITION OF ALL ABANDONED UTILITIES THAT INTERFERE WITH EXECUTION OF THE WORK SHALL BE VERIFIED BY THE UTILITY OWNER
PRIOR TO DISTURBANCE OR MODIFICATION. THE CONTRACTOR MAY ONLY TAKE ACTION AFTER WRITTEN APPROVAL HAS BEEN RECEIVED FROM
THE UTILITY OWNER BY THE SNOHOMISH COUNTY.
5.THE CONTRACTOR SHALL ENSURE THAT OPERATIONS OF EXISTING SEWER, WATER, POWER, TELECOMMUNICATIONS, AND OTHER UTILITY
SYSTEMS SERVING THE RANGER RESIDENCE ARE NOT DISRUPTED DURING CONSTRUCTION WITHOUT PRIOR AUTHORIZATION OF THE
SNOHOMISH COUNTY.
2704050020010027040500200100
00500900000500
00500900001602
00500900001601
BNSF RAILWAYPUGET
SOUND
LUN
D
S CREEKGUL
C
H
HD
AA
AA
AA
AA
HD
HD
HD
HDHD
SD SD
SD
SD SDSDSDPICNIC TABLE (TYP)
BENCH (TYP)
8' WIDECRUSHED ROCK PATH
10' WIDEASPHALT PATH
40' PEDESTRIANBRIDGE
BOARDWALK PATH
6' WIDE
CRUSHED ROCK PATH
BEACH SAND
RESTROOM ENCLOSURE,
SEE SHEET A-2.1
FOOTWASH ANDLANDSCAPE BOULDER
DRINKING FOUNTAIN
CONCRETE
SEATWALL
10' WIDE
ASPHALT PATH
CONCRETE PLINTH
STORMWATER TREATMENT SWALE
ROCK ARMOR
GRILL (TYP)
ESTUARY
RESTORATION
RESTORED CREEK MOUTH (INTERIM
POST-CONSTRUCTION CONFIGURATION)
LANDSLIDE PROTECTIVE BARRIER
STORMWATER
SWALE
EXISTING PICNIC SHELTER
RAILROAD BRIDGE
SEE NOTE 4
RS-20
R-9,600
ALDERWOOD
ALDERWOOD
ALDERWOOD-EVERETT-COMPLEX
ALDERWOOD-EVERETT-COMPLEX
FLUVAQUENTS
FIRM PANEL #53061C1305E
Nov 16, 2018 3:31pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-COMPOSITE Plan_Permit.dwg 3 CS-1 (PERMIT)0
SCALE IN FEET
30 60
NORTH
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
LEGEND:
PROJECT BOUNDARY
PARK BOUNDARY
12" BEACH SAND/GRAVEL
LARGE WOODY DEBRIS
ROCK ARMORING
STREAMBED AND SWALE COBBLES
CRUSHED ROCK PATH OR TRENCH
ASPHALT PAVEMENT
CONCRETE PATH/PAD
PEDESTRIAN BRIDGE
BOARDWALK PATH
PICNIC TABLE
BENCH
LAWN
ROCK-LINED SWALE
WILDLIFE TREE SNAGS
PROPOSED CONTOUR
PROPOSED CLEARING LIMITS
PROPOSED STORMWATER PIPE
TREE TO REMAIN
EXISTING WETLAND TO BE PROTECTED
WETLAND BUFFER
EXISTING ORDINARY HIGH WATER MARK (OHWM)
EXISTING MHHW (EL. +9.0' MLLW)
PROPOSED MHHW (EL. +9.0' MLLW)
BNSF RIGHT OF WAY
10
CS-1
COMPOSITE SITE PLAN (1 OF 3)3 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018 MATCH LINE, SEE SHEET CS-2NOTES:
1.FOR EXISTING PROPERTY BOUNDARIES,
EASEMENTS, EXISTING CONTOURS, DRAINAGE,
TOPOGRAPHIC FEATURES, AND STRUCTURES, SEE
DRAWINGS EC-1 THROUGH EC-3.
2.FOR PROPOSED CONTOURS, CUT, FILL, AND
GRADING FEATURES, SEE DRAWINGS C-1
THROUGH C-3.
3.FOR TREE REMOVAL AND PROTECTION, SEE
DRAWINGS D-1, THROUGH D-3.
4.FOR TEMPORARY EROSION CONTROL MEASURES,
SEE DRAWINGS T-1 THROUGH T-3.
5.FOR SOIL SPECIFICATIONS AND COMPACTION
REQUIREMENTS, SEE DRAWING CS-3.
6.FOR PLANTING, SEE DRAWINGS L-1 THROUGH L-4.
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE PLANE NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR. SOME INFORMATION WILL BE
LOST WITH BLACK AND WHITE VIEWING.
4.PATHWAY WIDENING TO 10 FEET REQUIRES WORK ON ADJACENT PROPERTY.
OBTAINING AN EASEMENT FOR THIS WORK IS UNDERWAY AND WILL BE
COMPLETED PRIOR TO CONSTRUCTION START DATE.
SD
OHWM BUFFER
SOIL TYPE BOUNDARY
ZONING
EARTH SUBSIDENCE AND LANDSLIDE AREA
MINIMUM BUFFER ADJACENT TO HAZARD
100-YEAR FLOODPLAIN
RS-20
ALDER-
WOOD
27040500200100
00500900000500
00500900000500
00500900001602 27040500200100
LUN
D
S CREEKGUL
C
H
LUN
D
S
G
U
L
C
H
CREE
K
OFF-CHANNEL
POND
SD
SD
SD
SD
SD
SDSD
SD
SOIL REINFORCEMENT AREA, TYP,
SEE SHEETS RD-1 AND RD-2
CRUSHED ROCK PATH
RESTRIPED ADA PARKING STALLS
VAN-ACCESSIBLE ADA PARKING STALL
ROADSIDE
SWALE, PAVED
EX ROADSIDE SWALE, PAVED
OVERLAY EX. ROADWAY
ROADSIDE
SWALE, PAVED
SEE NOTE 4
EXISTING RANGER RESIDENCE
EXISTING PEDESTRIAN BRIDGE
ALDERWOOD-EVERETT-COMPLEX
ALDERWOOD
RS-20
R-9,600
Nov 16, 2018 3:31pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-COMPOSITE Plan_Permit.dwg 4 CS-2 (PERMIT)APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
CS-2
COMPOSITE SITE PLAN (2 OF 3)4 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
LEGEND:
PARK BOUNDARY
PROJECT BOUNDARY
12" BEACH SAND/GRAVEL
LARGE WOODY DEBRIS
ROCK ARMORING
STREAMBED AND SWALE COBBLES
CRUSHED ROCK PATH OR TRENCH
ASPHALT PAVEMENT
CONCRETE PATH/PAD
PEDESTRIAN BRIDGE
BOARDWALK PATH
PICNIC TABLE
BENCH
LAWN
ROCK-LINED SWALE
WILDLIFE TREE SNAGS
PROPOSED CONTOUR
PROPOSED CLEARING LIMITS
PROPOSED STORMWATER PIPE
TREE TO REMAIN
EXISTING WETLAND TO BE PROTECTED
WETLAND BUFFER
EXISTING ORDINARY HIGH WATER MARK (OHWM)
REINFORCED TURF
SPIRAL NAIL ROAD REINFORCEMENT
PAVEMENT TO BE REMOVED AND REPLACED
GRIND AND OVERLAY EXISTING PAVEMENT
10MATCH LINE, SEE SHEET CS-1MATCH LINE, SEE SHEET CS-3
NOTES:
1.FOR EXISTING PROPERTY BOUNDARIES,
EASEMENTS, EXISTING CONTOURS, DRAINAGE,
TOPOGRAPHIC FEATURES, AND STRUCTURES, SEE
DRAWINGS EC-1 THROUGH EC-3.
2.FOR PROPOSED CONTOURS, CUT, FILL, AND
GRADING FEATURES, SEE DRAWINGS C-1
THROUGH C-3.
3.FOR TREE REMOVAL AND PROTECTION, SEE
DRAWINGS D-1, THROUGH D-3.
4.FOR TEMPORARY EROSION CONTROL MEASURES,
SEE DRAWINGS T-1 THROUGH T-3.
5.FOR SOIL SPECIFICATIONS AND COMPACTION
REQUIREMENTS, SEE DRAWING CS-3.
6.FOR PLANTING, SEE DRAWINGS L-1 THROUGH L-4.
SD
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE PLANE
NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR.
SOME INFORMATION WILL BE LOST WITH BLACK AND
WHITE VIEWING.
4.PATHWAY WIDENING TO 10 FEET REQUIRES WORK ON
ADJACENT PROPERTY. OBTAINING AN EASEMENT FOR
THIS WORK IS UNDERWAY AND WILL BE COMPLETED
PRIOR TO CONSTRUCTION START DATE.
5.CONTRACTOR SHALL PROVIDE CONTINUOUS UTILITY
SERVICE AND DRIVEWAY ACCESS TO RANGER RESIDENCE.
OHWM BUFFER
SOIL TYPE BOUNDARY
ZONING
EARTH SUBSIDENCE AND LANDSLIDE AREA
MINIMUM BUFFER ADJACENT TO HAZARD
100-YEAR FLOODPLAIN
RS-20
ALDER-
WOOD
0
SCALE IN FEET
30 60
NORTH
00500900000500
00500900000100
SWALE, PAVED
EX ROADSIDE SWALE, PAVEDROADSIDESWALE, PAVED
SOIL REINFORCEMENT AREA, TYP,
SEE SHEETS RD-1 AND RD-2
RS-12
ALDERWOOD-EVERETT-COMPLEX ALDERWOOD-EVERETT-COMPLEX
ALDERWOOD
ALDERWOOD-EVERETT-COMPLEX
RS-20
Nov 16, 2018 3:31pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-COMPOSITE Plan_Permit.dwg 5 CS-3 (PERMIT)APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
CS-3
COMPOSITE SITE PLAN (3 OF 3)5 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
NOTES:
1.FOR EXISTING PROPERTY BOUNDARIES,
EASEMENTS, EXISTING CONTOURS, DRAINAGE,
TOPOGRAPHIC FEATURES, AND STRUCTURES, SEE
DRAWINGS EC-1 THROUGH EC-3.
2.FOR PROPOSED CONTOURS, CUT, FILL, AND
GRADING FEATURES, SEE DRAWINGS C-1
THROUGH C-3.
3.FOR TREE REMOVAL AND PROTECTION, SEE
DRAWINGS D-1, THROUGH D-3.
4.FOR TEMPORARY EROSION CONTROL MEASURES,
SEE DRAWINGS T-1 THROUGH T-3.
5.FOR SOIL SPECIFICATIONS AND COMPACTION
REQUIREMENTS, SEE THIS DRAWING.
6.FOR PLANTING, SEE DRAWINGS L-1 THROUGH L-4.
MATCH LINE, SEE SHEET CS-2
0
SCALE IN FEET
30 60
NORTH
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
4.CONTRACTOR SHALL PROVIDE CONTINUOUS
UTILITY SERVICE AND DRIVEWAY ACCESS TO
RANGER RESIDENCE.75TH PL. WOVERLAY EX. ROADWAY
LEGEND:
PARK BOUNDARY
PROJECT BOUNDARY
EXISTING CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED CLEARING LIMITS
TREE TO REMAIN
PAVEMENT TO BE REMOVED AND REPLACED
GRIND AND OVERLAY EXISTING ASPHALT PAVEMENT
SPIRAL NAIL ROAD REINFORCEMENT
10
11
OHWM BUFFER
SOIL TYPE BOUNDARY
ZONING
EARTH SUBSIDENCE AND LANDSLIDE AREA
MINIMUM BUFFER ADJACENT TO HAZARD
100-YEAR FLOODPLAIN
RS-20
ALDER-WOOD
PERCENTAGE OF MAXIMUM DENSITY REQUIREMENTS: COMPACT SOIL TO NOT LESS THAN THE
FOLLOWING PERCENTAGES FOR MAXIMUM DRY DENSITY FOR SOILS DETERMINED IN
ACCORDANCE WITH ASTM 1557 (MODIFIED PROCTOR).
1.BACKFILL:
a)UTILITY PIPE ZONE BEDDING – 95%
b)UTILITY PIPE ZONE BACKFILL – 95%
c)UTILITY TRENCH BACKFILL (PAVED AREA) – 95%
d)UTILITY TRENCH BACKFILL (UNPAVED AREA) – 90%
e)IRRIGATION PIPE BEDDING BELOW PIPE – 95%
f)IRRIGATION PIPE BACKFILL OVER PIPE – HAND TAMP TO 75% WHERE NOT IN PAVED
AREA; WHERE IRRIGATION PIPE IS UNDER PAVING, COMPACT TO 95%
g)GENERAL LANDSCAPE BACKFILL – 85%
h)OVER EXCAVATION BACKFILL OF EXISTING SUB-GRADE TO REMAIN – 95%
2.SUB-GRADES:
a)SUBGRADE SOILS IN PAVING AREAS – 90%
b)IMPORT AGGREGATE BASE IN PAVING AREAS – 95%
c)SUBGRADE FOR TOPSOIL AND SOIL AMENDMENTS (PLANTED/SEEDED AREAS) – 85%
3.SURFACE FILLS:
a)STRUCTURAL FILL – 95%
b)EMBANKMENT FILL – 95%
C) FILLS ON SLOPES EXCEEDING 3:1, TO PREVENT EROSION – 90%
2704050020010027040500200100
00500900000500
00500900001602
00500900001601
BNSF RAILWAYPUGET
SOUND
LUN
D
S CREEKGUL
C
H
100' BNSF ROW
PICNIC SHELTER
VOLLEYBALL
COURT
ASPHALTPATH
CONCRETE CULVERT, SLABS,GRATING, AND CHANNEL MATERIALS
CRUSHED ROCK PATH
RESTROOM ENCLOSURE,FOUNDATION,AND CONC. SLAB
EXISTING PEDESTRIANLIGHT WITH SECONDARYUNDERGROUND POWER
CONC. PAD, PICNIC
TABLE, GRILL
EXTENT OF TOPOGRAPHIC SURVEY
EXTENT OF TOPOGRAPHIC SURVEY
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXISTING BEACHTOPOGRAPHY (SEE NOTE 5)
EXISTINGINFORMAL TRAILTO GAP IN FENCE
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:32pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 7 EC-10
SCALE IN FEET
30 60
LEGEND:
NORTH
EC-1
EXISTING CONDTIONS PLAN (1 OF 3)7 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
MATCH LINE, SEE SHEET EC-2NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
5.BEACH TOPOGRAPHY REPRESENTS JUNE 2016
CONDITIONS AND ARE SUBJECT TO CHANGE.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING
GRADES AND BEACH CONDITIONS PRIOR TO
GRADING.
CONFIRMED LOCATIONS
OF BURIED DEBRIS
27040500200100
00500900000500
00500900000500
00500900001602 27040500200100
LUN
D
S CREEKGUL
C
H
LUN
D
S
G
U
L
C
H
CREE
K
OFF-CHANNEL
POND
RANGERRESIDENCE
ASPHALTPARKING LOT
ASPHALTROAD
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXTENT OF TOPOGRAPHIC SURVEY
EXTENT OF TOPOGRAPHIC SURVEY
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:32pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 8 EC-2LEGEND:
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
EC-2
EXISTING CONDITIONS PLAN (2 OF 3)8 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
0
SCALE IN FEET
30 60
NORTHMATCH LINE, SEE SHEET EC-1MATCH LINE, SEE SHEET EC-3
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
00500900000500
00500900000100
ACCESS GATE
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXTENT OF TOPOGRAPHIC SURVEY
EX. 1-1/2" WATER METER, TO PARK
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:33pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 9 EC-3LEGEND:
75TH PL W.75TH PL W.APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
EC-3
EXISTING CONDITIONS PLAN (3 OF 3)9 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
0
SCALE IN FEET
30 60
NORTH
MATCH LINE, SEE SHEET EC-2
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
BNSF RAILWAYPUGET
SOUND
LUN
D
S CREEKGUL
C
H
SD SD
SD
SDWW
W
W W
W W W WSD
SDSD92 LF
12" CPE SD
88
L
F
12
"
C
P
E 24
2
5 2610
9
12
13
14
17
18
2012
13
1415
16
17
20
11
10
9
9
1
0 1112131415212122
15
2311
22251
9
16
26212724292818 19
242322
1213111415161718192010
9
11
81098769
109101188 9272829303120191817
16
15
14
13
1211
TYPE 1 CB W/ HERRINGBONE GRATE
WET BIO-FILTRATION SWALE
185 LF, S = 2% MAX
3' WIDE BOTTOM
LOG DROP STRUCTURE
COBBLE SCOUR
PROTECTION
IE SWALE = 22.04
TYPE 1 CB W/
BEEHIVE GRATE
LOG EDGE,
ONE 12" ∅ LOG HIGH
TYPE 2 CB W/ SOLID COVER
OUTLET TO ROCK-LINED SWALE
IE = 11.00 (12" CPE)
REPLACE EX DRINKING FOUNTAIN AND SUMP
SHEET FLOW DISPERSION AREA
SHEET FLOW DISPERSION AREA
COBBLE SCOUR
PROTECTION
2" X 3/4" TEE TO DRINKING FOUNTAIN
2" X 3/4" TEE TO EX VALVE BOX
STORM DRAIN,
SEE PROFILE A,
SHEET CU-3
6 LF
12" CPE
TYPE 1 CB W/ SOLID COVER
DRINKING FOUNTAIN TRENCH DRAIN
TYPE 1 CB W/ HERRINGBONE GRATE
57 LF8" CPESTORM DRAIN,
SEE PROFILE C,
SHEET CU-3
STORM DRAIN,
SEE PROFILE B,
SHEET CU-3
ROCK-LINED SWALE (STREAMBED COBBLE) EXTEND TO MHHW
2" X 1" REDUCER
270
L
F
1" D
R
1
1
HDP
E
CONNECT 1" HDPE WATER SERVICE TO FOOT WASH
24 LF
8" CP
E
OUTLET TO ESTUARY
IE=11.75 (8" CPE)
OUTLET PROTECTION
TYPE 1 CB W/ BEEHIVE GRATE
INSTALL GRAVEL SPLASH TRENCH AROUND
RESTROOM SHELTER AT ROOF LINE
ROCKERY
PLAT CENTERLINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
UNDERGROUND SEWER FORCEMAIN LINE
BNSF CENTERLINE
Nov 16, 2018 3:41pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Utility Plan.dwg 43 CU-1PARK BOUNDARY
PROJECT BOUNDARY
BNSF RIGHT OF WAY
WATER PIPE
STORMWATER PIPE
FOUNDATION DRAIN
SWALE
CATCH BASIN, TYPE 1
CATCH BASIN, TYPE 2
DRINKING FOUNTAIN
WETLAND TO BE PROTECTED
TREE TO REMAIN
W
SD
0
SCALE IN FEET
30 60
NORTH
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017.
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
LEGEND:MATCH LINE, SEE SHEET CU-240265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
B
CU-4
C
CU-4
CU-1
UTILITY PLAN (1 OF 2)43 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
A
CU-4
GENERAL UTILITY NOTES:
1.FOR DEMOLITION OF EXISTING UTILITIES, SEE DRAWINGS D-1 THROUGH D-3.
2.EXISTING UTILITIES - THE CONTRACTOR SHALL FIELD VERIFY THE DEPTH, LOCATION, SIZE, AND MATERIAL OF
EXISTING UTILITIES PRIOR TO CONSTRUCTION, AS OUTLINED IN THE SPECIFICATIONS AND IN THE EXISTING
UTILITY NOTES ON DRAWING G-3. THE CONTRACTOR SHALL POTHOLE TO VERIFY THE DEPTH, LOCATION,
SIZE, AND MATERIAL OF EXISTING BURIED UTILITIES. RECOMMENDED POTHOLE LOCATIONS ARE SHOWN ON
THESE DRAWINGS FOR GUIDANCE, BUT ADDITIONAL OR DIFFERENT POTHOLES MAY NEED TO BE
COMPLETED TO MEET THESE REQUIREMENTS. WHERE POTHOLING INDICATES A POTENTIAL CONFLICT AT A
UTILITY CROSSING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE.
3.FOR UTILITY STORM DRAIN ELEVATIONS, SEE STORM DRAIN PROFILES ON DRAWING CU-3.
4.PIPE ZONE BEDDING AND BACKFILL SHALL BE PER
5.PARK WATER METER SHOWN ON SHEET EC-3.
BNSF RIGHT OF WAY
1
CU-4
10/11
CM-5
11
CM-5
STANDARD UTILITY DETAILS
SYMBOL AGENCY STANDARD
DETAIL DESCRIPTION
SNOHOMISH
CO. PW 5-120 CATCH BASIN DETAILS
WSDOT B-05.20-02 CATCH BASIN TYPE 1
WSDOT B-10.20-02 CATCH BASIN TYPE 2
WSDOT B-30.20-04 RECTANGULAR SOLID
METAL COVER
WSDOT B-30.30-03 RECTANGULAR VANED
GRATE
WSDOT B-30.50-03 RECTANGULAR
HERRINGBONE GRATE
WSDOT B-30.70-04 CIRCULAR FRAME (RING)
AND COVER
WSDOT B-55.20-00 PIPE ZONE BEDDING AND
BACKFILL
1
2
3
4
5
6
7
8
1 2
1 2137
1 2 5
1 2 4
8
2
CU-4
2
CU-4
UTILITY LOCATIONS:
THE CONTRACTOR SHALL CALL THE ONE-CALL
UTILITY CENTER AT 811 OR 1-800-424-5555 FOR
UTILITY LOCATIONS NOT LESS THAN TWO (2)
BUSINESS DAYS BEFORE DEMOLITION WORK. FOR
ADDITIONAL REQUIREMENTS SEE SHEET G-3.
3
CU-4
LUN
D
S CREEKGUL
C
H
LUN
D
S
G
U
L
C
H
CREE
K
OFF-CHANNELPOND
SD
SD
SD
SD
SD
SDSD
SD
W W
W
50 LF12" CPE
42 L
F
12"
C
P
E
52 LF
12" CPE30 LF8" CPE
61 LF
12" CPE
114 L
F
12" CP
E
104
LF
12" CP
E
2
9
2
L
F
2"
D
R
1
1
H
D
P
E
2
6
50454025262730292831323334353639383736
55606570352
7 282930313233343535
34
TYPE 1 CB W/ BEEHIVE GRATE
TYPE 1 CB W/ VANED GRATE
TYPE 1 CB W/ VANED GRATE
TYPE 1 CB W/ HERRINGBONE GRATE
TYPE 1 CB W/ HERRINGBONE GRATE
TYPE 1 CB W/ SOLID COVER
TYPE 1 CB W/ HERRINGBONE GRATE
OUTLET TO WET BIO-FILTRATION SWALE
IE = 27.00 (12" CPE)
OUTLET PROTECTIONWET BIO-FILTRATION SWALE
185 LF, S = 2% MAX
3' WIDE BOTTOM LOG EDGE,
TWO 12" ∅ LOGS HIGH
24 LF
12" CPE
LOG DROP STRUCTURE
COBBLE SCOUR
PROTECTION
IE SWALE = 22.04
LOG EDGE,
ONE 12" ∅ LOG HIGH
CPLG, CONNECT TO EX 2-1/2" PVC W
2" 45° HDPE BEND
STORM DRAIN, SEE
PROFILE A, SHEET CU-3
STORMWATER SWALE, SEE RD-232 LF8" CPETYPE 1 CB W/ HERRINGBONE GRATE
TYPE 1 CB W/ HERRINGBONE GRATE
STORM DRAIN, SEE
PROFILE D, SHEET CU-3
STORM DRAIN, SEE
PROFILE E, SHEET CU-3
ROCKERY
PLAT CENTERLINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
UNDERGROUND SEWER FORCEMAIN LINE
BNSF CENTERLINE
Nov 16, 2018 3:41pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Utility Plan.dwg 44 CU-240265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
CU-2
UTILITY PLAN (2 OF 2)44 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018MATCH LINE, SEE SHEET CU-1A
CU-4
1
CU-4
0
SCALE IN FEET
30 60
NORTH
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017.
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
5.CONTRACTOR SHALL PROVIDE CONTINUOUS
UTILITY SERVICE AND DRIVEWAY ACCESS TO
RANGER RESIDENCE.
GENERAL UTILITY NOTES:
1.FOR DEMOLITION OF EXISTING UTILITIES, SEE DRAWINGS D-1 THROUGH D-3.
2.EXISTING UTILITIES - THE CONTRACTOR SHALL FIELD VERIFY THE DEPTH, LOCATION, SIZE, AND MATERIAL OF
EXISTING UTILITIES PRIOR TO CONSTRUCTION, AS OUTLINED IN THE SPECIFICATIONS AND IN THE EXISTING
UTILITY NOTES ON DRAWING G-3. THE CONTRACTOR SHALL POTHOLE TO VERIFY THE DEPTH, LOCATION,
SIZE, AND MATERIAL OF EXISTING BURIED UTILITIES. RECOMMENDED POTHOLE LOCATIONS ARE SHOWN ON
THESE DRAWINGS FOR GUIDANCE, BUT ADDITIONAL OR DIFFERENT POTHOLES MAY NEED TO BE
COMPLETED TO MEET THESE REQUIREMENTS. WHERE POTHOLING INDICATES A POTENTIAL CONFLICT AT A
UTILITY CROSSING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE.
3.FOR UTILITY STORM DRAIN ELEVATIONS, SEE STORM DRAIN PROFILES ON DRAWING CU-3.
4.PIPE ZONE BEDDING AND BACKFILL SHALL BE PER
5.PARK WATER METER SHOWN ON SHEET EC-3
PARK BOUNDARY
PROJECT BOUNDARY
WATER PIPE
STORMWATER PIPE
SWALE
CATCH BASIN, TYPE 1
CATCH BASIN, TYPE 2
DRINKING FOUNTAIN
WETLAND TO BE PROTECTED
TREE TO REMAIN
W
SD
LEGEND:
STANDARD UTILITY DETAILS
SYMBOL AGENCY STANDARD
DETAIL DESCRIPTION
SNOHOMISH
CO. PW 5-120 CATCH BASIN DETAILS
WSDOT B-05.20-02 CATCH BASIN TYPE 1
WSDOT B-10.20-02 CATCH BASIN TYPE 2
WSDOT B-30.20-04 RECTANGULAR SOLID
METAL COVER
WSDOT B-30.30-03 RECTANGULAR VANED
GRATE
WSDOT B-30.50-03 RECTANGULAR
HERRINGBONE GRATE
WSDOT B-30.70-04 CIRCULAR FRAME (RING)
AND COVER
WSDOT B-55.20-00 PIPE ZONE BEDDING AND
BACKFILL
1
2
3
4
5
6
7
8
8
1 2 6
1 2 4
1 2 6
1 2 6
1 2 6
1 2 6
1 2 5
1 2 5
1 2
UTILITY LOCATIONS:
THE CONTRACTOR SHALL CALL THE ONE-CALL
UTILITY CENTER AT 811 OR 1-800-424-5555 FOR
UTILITY LOCATIONS NOT LESS THAN TWO (2)
BUSINESS DAYS BEFORE DEMOLITION WORK. FOR
ADDITIONAL REQUIREMENTS SEE SHEET G-3.
C
CU-4
ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
-10
0
10
20
30
40
50
-10
0
10
20
30
40
50
0+00 0+30 0+60 0+90 1+20 1+50 1+80 2+10 2+40 2+70 3+00 3+30 3+60 3+90 4+20 4+50 4+80 5+10 5+40
ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
10
20
30
40
50
60
70
10
20
30
40
50
60
70
4+80 5+10 5+40 5+70 6+00 6+30 6+60 6+90 7+20 7+50 7+80 8+10 8+40 8+70 9+00 9+30 9+60TYPE 1 CB W/ BEEHIVE GRATERIM=22.21STA:3+22TYPE 2 CB W/ SOLID COVERRIM=21.10IE=16.96 (12" CPE, E)IE=11.88 (12" CPE, NW)IE=16.18 (8" CPE, N)STA:2+23TYPE 1 CB W/ BEEHIVE GRATERIM=51.00IE=46.12 (12" CPE, N)STA:9+56TYPE 1 CB W/ VANED GRATERIM=44.26IE=40.37 (12" CPE, S)IE=40.34 (12" CPE, NW)STA:9+06TYPE 1 CB W/ VANED GRATERIM=41.00IE=36.98 (12" CPE, SE)IE=36.95 (12" CPE, W)STA:8+64TYPE 1 CB W/ HERRINGBONE GRATERIM=37.28IE=33.28 (12" CPE, E)IE=33.25 (12" CPE, W)IE=33.28 (8" CPE, S)STA:8+11TYPE 1 CB W/HERRINGBONE GRATERIM=36.21IE=32.33 (12" CPE, E)IE=32.31 (12" CPE, W)IE=32.33 (8" CPE, S)STA:7+50TYPE 1 CB W/ SOLID COVERRIM=35.22IE=30.60 (12" CPE, E)IE=30.57 (12" CPE, SW)STA:6+36ROCK-LINED SWALE (EXTEND TO MHHW)WET BIO-FILTRATION SWALE (185 LF)88 LF 12" ∅ CPE SD
S=1.00%
6 LF 12" ∅ CPE SD
S=1.00%
104 LF 12" ∅ CPE SD
S=2.50%
114 LF 12" ∅ CPE SD
S=1.50%
61 LF 12" ∅ CPE SD
S=1.50%
52 LF 12" ∅
CPE SD
S=7.00%
42 LF 12" ∅
CPE SD
S=8.00%
50 LF 12" ∅ CPE SD
S=11.50%
3/4"∅ W STA 4+32LOG DROP STRUCTUREIE=26.20 (US)IE=25.20 (DS)STA 3+81LOG DROP STRUCTUREIE=24.20 (US)IE=23.20 (DS)2"∅ W
2%
2%
2%
IE=11.00
24 LF 12" ∅ CPE SD
S=1.00%
92 LF 12" ∅ CPE SD
S=2.00%TYPE 1 CB W/HERRINGBONE GRATERIM=30.50IE=27.97 (12" CPE, NE)IE=27.94 (12" CPE, SW)STA:5+32TYPE 1 CB W/SOLID COVERRIM=23.57IE=18.82 (12" CPE, S)IE=18.80 (12" CPE, W)STA:3+154" ∅ SD
2"∅ W MATCHLINESEE BELOW1 1/2" ∅ SS FM,
3" ∅ SLEEVE
2"∅ P
2"∅ COMM
2 1/2"∅ W ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
-10
0
10
20
30
40
50
-10
0
10
20
30
40
50
0 30 60 80TYPE 2 CB W/SOLID COVERRIM=21.10IE=16.96 (12" CPE, E)IE=11.88 (12" CPE, NW)IE=16.18 (8" CPE, N)STA:2+23RIM=20.75IE=16.75 (8" CPE, S)TYPE 1 CB W/HERRINGBONE GRATE57 LF 8" ∅ CPE SD
S=1.00%ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
0
10
20
30
40
50
60
0
10
20
30
40
50
60
0 30 60TYPE 1 CB W/HERRINGBONE GRATERIM=36.21IE=32.33 (12" CPE, E)IE=32.31 (12" CPE, W)IE=32.33 (8" CPE, S)STA:7+5032 LF 8" ∅
CPE SD
S=1.50%TYPE 1 CB W/HERRINGBONE GRATERIM=36.60IE=32.81 (8" CPE, N)STA:7+50ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
10
20
30
40
50
60
70
10
20
30
40
50
60
70
0 30 60TYPE 1 CB W/HERRINGBONE GRATERIM=37.28IE=33.28 (12" CPE, E)IE=33.25 (12" CPE, W)IE=33.28 (8" CPE, S)STA:8+11TYPE 1 CB W/HERRINGBONE GRATERIM=38.10IE=33.73 (12" CPE, N)STA:8+2530 LF 8"
∅ CPE SD
S=1.50%ELEVATION IN FEETHORIZONTAL DISTANCE IN FEET
3X VERTICAL EXAGGERATION
-20
-10
0
10
20
30
40
-20
-10
0
10
20
30
40
0 30 40RIM=14.35IE=11.99 (8" CPE, NE)TYPE 1 CB W/BEEHIVE GRATE Nov 16, 2018 3:42pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Utility Plan.dwg 45 CU-30
SCALE IN FEET
30 60
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.SEE SHEETS CU-1 AND CU-2 FOR STANDARD
UTILITY DETAIL LEGEND.
40265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
HORIZ. SCALE:VERT. SCALE:1" = 30'
STORM DRAIN PROFILEA
CU-1/CU-2 1" = 10'
LEGEND, PROFILE
EXISTING GRADE
PROPOSED GRADEMATCH LINE, SEE ABOVECU-3
STORM DRAIN PROFILE 45 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
HORIZ. SCALE:
VERT. SCALE:
1" = 30'
STORM DRAIN PROFILEC
CU-1 1" = 10'
HORIZ. SCALE:
VERT. SCALE:
1" = 30'
STORM DRAIN PROFILED
CU-2 1" = 10'
HORIZ. SCALE:
VERT. SCALE:
1" = 30'
STORM DRAIN PROFILEE
CU-2 1" = 10'
HORIZ. SCALE:
VERT. SCALE:
1" = 30'
STORM DRAIN PROFILEB
CU-1 1" = 10'
IE = 11.75
OUTLET PROTECTION
1
CU-4
IE=27.70
OUTLET
PROTECTION
1
CU-4
1
3
7
1
2
4
1
2
1
2
6
1
2
4
1
2
6
1
2
6
1
2
5
1
2
5
1
2
1
2
1
3
7
1
2
5
1
2
6
1
2
6 1
2
6
1
2
6
A
CU-4
C
CU-4
C
CU-4
SCALE:
TYPICAL WET BIO-FILTRATION SWALE SECTIONA
C-12 1" = 3'
3H 1V 3H1V
3' MIN
BASE
8" MIN. COMPOST
AMENDED SOIL
WITHOUT LOG EDGE
EX GROUND
VARIES
3' MIN
WITH LOG EDGE
12" MIN
CRUSHED SHOULDER
6" MIN. CRUSHED
BASE COURSE
ASPHALT PATHWAY
1.5%
3' MIN
BASE
3H1V
8" MIN. COMPOST
AMENDED SOIL
MIN 12" ∅ LOG EDGE , TYP
3H 1V
EX GROUND
SCALE:
WET BIO-FILTRATION SWALE - LOG DROP DETAILC
C-12 1" = 3'
SECTION D-D'
PROFILE
3H 1V
3H1V
3' MIN
BASE
EX GROUND
8" MIN. COMPOST
AMENDED SOILMIN 12" ∅ LOG EDGE, TYP
LOGS AND CHANNEL
DOWNSTREAM OF DROP
4" DESIGN
DEPTH
4" DESIGN
DEPTH
4" DESIGN
DEPTH
2.0%
2.0%
8" MIN. COMPOST
AMENDED SOIL
MIN 12" ∅ LOG EDGE, TYP
STREAMBED AND SWALE
SUBSTRATE, MIN 8" DEEP
5' MIN
12" DROP
SWALE INVERT
TOP OF BANK
SCALE:
TYPICAL OUTFALL SWALE SECTIONB
C-12 1" = 3'
STREAMBED AND SWALE
SUBSTRATE, MIN 12" DEEP
3' MIN
BASE
7'-0"
2H1V2H1V12"
6" TOPSOIL WITH
HIGH TIDAL MARSH
PLANTING DD'12" MIN
CRUSHED SHOULDER
6" MIN. CRUSHED
BASE COURSE
ASPHALT PATHWAY
1.5%
12" MIN
12" MIN
CRUSHED SHOULDER
6" MIN. CRUSHED
BASE COURSE
ASPHALT PATHWAY
1.5%
SCALE:
SHEET FLOW DISPERSION AREA2
CU-1 1" = 3'
12" MIN
CRUSHED SHOULDER
6" MIN. CRUSHED
BASE COURSE
ASPHALT PATHWAY
1.5%
10' VEGETATED FILTER STRIP
15% MAX
TOPSOIL
SCALE:
SPLASH TRENCH3
CU-1 1" = 3'
2' SPLASH TRENCH (UNDER ROOF LINE)
1'-6"
SLAB ON GRADE FOR
RESTROOM ENCLOSURE
(SEE DWG S2.2)
2.0%
23
CM-9 LOG EDGE
23
CM-9
23
CM-9
D
STREAMBED AND
SWALE SUBSTRATE,
MIN 12" DEEP
STREAMBED
COBBLES
2xD MIN.2xD MIN.
1xD MIN. (MEASURED ALONG SLOPE)
5xD MIN. (MEASURED ALONG SLOPE)
D
5xD MIN.
1xD MIN.
PROFILE
SEE SECTION
SECTION
SCALE:
OUTLET PROTECTION1
CU-1 NTS
40265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
Nov 16, 2018 3:42pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Utility Plan.dwg 46 CU-4CU-4
DRAINAGE DETAILS 46 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
Appendix B
Drainage Area and Land Cover Analysis
Meadowdale Beach ParkStormwater Analysis - Existing Land Cover and Drainage AreasTDA 1TDA 2AREA 1 AREA 2 AREA 3 AREA 4 Area 5 TOTAL AREA 6Designation(SF) (AC) (SF) (AC) (SF) (AC) (SF) (AC) (SF) (AC) (SF) (AC) (SF) (AC)Sidewalks Non PGIS 0 0 760 0.02 12,133 0.28 12,096 0.28 0 0 24,989 0.57 0 0Gravel Paths Non PGIS 0 0 424 0.010000004240.01 0 0Concrete Pads Non PGIS00001,175 0.03 63 0.00 0 0 1,238 0.03 0 0Roofs Non PGIS00009030.0200009030.02 0 0Railroad AlignmentNon PGIS0000000010,206 0.23 10,206 0.23 0 0SUBTOTAL Non PGIS 0 0 1,184 0.03 14,211 0.33 12,159 0.28 10,206 0.23 37,760 0.8700RoadwaysPGIS22,836 0.520000000022,836 0.525,1080.12SUBTOTALPGIS22,836 0.520000000022,836 0.52 5,108 0.12SUBTOTALImpervious 22,836 0.52 1,184 0.03 14,211 0.33 12,159 0.28 10,206 0.23 60,596 1.39 5,108 0.12Forested, TreesNon PGPS 8,5900.205,9690.14 53,805 1.24 39,786 0.9100108,150 2.483,5200.08LandscapingNon PGPS 8520.021,8310.04 58,471 1.34000061,154 1.4000BeachNon PGPS0000000027,368 0.63 27,368 0.6300EstuaryNon PGPS00000000000000SUBTOTAL Non PGPS 9,442 0.22 7,800 0.18 112,276 2.58 39,786 0.91 27,368 0.63 196,672 4.51 3,520 0.08SUBTOTALPervious 9,442 0.22 7,800 0.18 112,276 2.58 39,786 0.91 27,368 0.63 196,672 4.51 3,520 0.08TOTALAll32,278 0.74 8,984 0.21 126,487 2.90 51,945 1.19 37,574 0.86 257,268 5.91 8,628 0.20SidewalksNon PGIS004830.010000004830.0100Gravel PathsNon PGIS002,8520.070000002,8520.0700Concrete PadsNon PGIS00000000000000RoofsNon PGIS 5,8650.131,4430.030000007,3080.1700Railroad AlignmentNon PGIS0000000014,795 0.34 14,795 0.34 0 0SUBTOTAL Non PGIS 5,865 0.13 4,778 0.11000014,795 0.34 25,438 0.58 0 0Roadways PGIS0000000000006170.01SUBTOTAL PGIS0000000000006170.01SUBTOTAL Impervious 5,865 0.13 4,778 0.11000014,795 0.34 25,438 0.58 617 0.01Forested, Trees Non PGPS 210,883 4.84 26,506 0.61 67,331 1.55 461,931 10.6000766,651 17.60 131,991 3.03LandscapingNon PGPS003,6060.080000003,6060.0800BeachNon PGPS0000000016,408 0.38 16,408 0.3800EstuaryNon PGPS00000000000000SUBTOTAL Non PGPS 210,883 4.84 30,112 0.69 67,331 1.55 461,931 10.60 16,408 0.38 786,665 18.06 131,991 3.03SUBTOTALPervious 210,883 4.84 30,112 0.69 67,331 1.55 461,931 10.60 16,408 0.38 786,665 18.06 131,991 3.03TOTALAll216,748 4.98 34,890 0.80 67,331 1.55 461,931 10.60 31,203 0.72 812,103 18.64 132,608 3.04Within Project Site AreaOff-Site Areas that Drain through Project AreaAccess Driveway and Parking Area, Drains to CreekRanger Residence Area, Drains to CreekWest of Ranger Residence and South of Creek, Drains to Creek North Side of Creek, Drains to CreekRailroad Berm and BeachAreas 1-5Access Driveway and Off-Site Areas, Drains to Puget Sound South of Project SiteSurfaceDescriptionStormwater Site PlanMeadowdale Beach Park and Estuary Restoration ProjectDRAFTPage 1 of 5November 2018
Meadowdale Beach ParkStormwater Analysis - Existing Land Cover and Drainage AreasTDA 1TDA 2AREA 1AREA 2AREA 3AREA 4Area 5TOTALAREA 6Designation(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)Access Driveway and Parking Area, Drains to CreekRanger Residence Area, Drains to CreekWest of Ranger Residence and South of Creek, Drains to Creek North Side of Creek, Drains to CreekRailroad Berm and BeachAreas 1-5Access Driveway and Off-Site Areas, Drains to Puget Sound South of Project SiteSurfaceDescriptionSidewalksNon PGIS001,2430.03 12,133 0.28 12,096 0.280025,472 0.5800Gravel PathsNon PGIS003,2760.080000003,2760.0800Concrete PadsNon PGIS0001,1750.03630.00001,2380.0300RoofsNon PGIS 5,8650.131,4430.039030.0200008,2110.1900Railroad AlignmentNon PGIS0000000025,001 0.57 25,001 0.57 0 0SUBTOTAL Non PGIS 5,865 0.13 5,962 0.14 14,211 0.33 12,159 0.28 25,001 0.57 63,198 1.4500RoadwaysPGIS22,836 0.5200000022,836 0.525,7250.13SUBTOTALPGIS22,836 0.520000000022,836 0.52 5,725 0.13SUBTOTALImpervious 28,701 0.66 5,962 0.14 14,211 0.33 12,159 0.28 25,001 0.57 86,034 1.98 5,725 0.13Forested, TreesNon PGPS 219,473 5.04 32,475 0.75 121,136 2.78 501,717 11.52874,801 20.08 135,511 3.11LandscapingNon PGPS 8520.025,4370.12 58,471 1.340064,760 1.4900BeachNon PGPS0000000043,776 1.00 43,776 1.0000EstuaryNon PGPS00000000 0000SUBTOTAL Non PGPS 220,325 5.06 37,912 0.87 179,607 4.12 501,717 11.52 43,776 1.00 983,337 22.57 135,511 3.11SUBTOTALPervious 220,325 5.06 37,912 0.87 179,607 4.12 501,717 11.52 43,776 1.00 983,337 22.57 135,511 3.11TOTALAll249,026 5.72 43,874 1.01 193,818 4.45 513,876 11.80 68,777 1.58 1,069,371 24.55 141,236 3.24Notes:PGIS: Pollution Generating Impervious SurfacePGPS: Pollution Generating Pervious SurfaceTotal Drainage AreaStormwater Site PlanMeadowdale Beach Park and Estuary Restoration ProjectDRAFTPage 2 of 5November 2018
Meadowdale Beach ParkStormwater Analysis - Proposed Land Cover and Drainage AreasAREA 1AREA 2AREA 3AAREA 3BAREA 4Area 5TOTALAREA 6Designation(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)SidewalksNon PGIS004,4250.104,3860.101,1940.03 10,1960.230020,201 0.4600Existing (Remain) Non PGIS0000000010,196 0.23 0 0 10,196 0.23 0 0Replaced Non PGIS 0 0 4,425 0.10 4,386 0.10 1,194 0.03000010,005 0.23 0 0New Non PGIS0000000000000000Gravel Paths Non PGIS005440.01 1,0240.02 1,1990.0300002,7670.0600Existing (Remain) Non PGIS0000000000000000Replaced Non PGIS 0 0 544 0.01000000005440.01 0 0New Non PGIS00001,024 0.02 1,199 0.0300002,223 0.05 0 0Concrete Pads Non PGIS00630.006690.023300.01008290.02 1,891 0.0400Existing (Remain) Non PGIS0000000000000000Replaced Non PGIS00001670.0000005860.01 753 0.02 0 0New Non PGIS 0 0 63 0.00 502 0.01 330 0.01 0 0 243 0.01 1,138 0.03 0 0Roofs Non PGIS002350.01 1,171 0.030000001,4060.0300Existing (Remain) Non PGIS00005420.010000005420.01 0 0Replaced Non PGIS 0 0 235 0.01000000002350.01 0 0New Non PGIS00006290.010000006290.01 0 0Railroad Alignment Non PGIS000000000025,0000.5725,0000.5700Existing (Remain) Non PGIS000000000025,000 0.57 25,000 0.57 0 0Replaced Non PGIS0000000000000000New Non PGIS0000000000000000SUBTOTAL Non PGIS 0 0 5,267 0.12 7,250 0.17 2,723 0.06 10,196 0.23 25,829 0.59 51,265 1.1800RoadwaysPGIS22,1780.51000000000022,1780.51 5,1080.12Existing (Remain) PGIS 21,372 0.49000000000021,372 0.49 5,108 0.12Replaced PGIS0000000000000000New PGIS 806 0.0200000000008060.02 0 0SUBTOTAL PGIS 22,178 0.51000000000022,178 0.51 5,108 0.12SUBTOTAL Impervious 22,178 0.51 5,267 0.12 7,250 0.17 2,723 0.06 10,196 0.23 25,829 0.59 73,443 1.69 5,108 0.12Forested, TreesNon PGPS8,1600.190010,9970.2547,6171.0942,9150.9900109,6892.523,5200.08Landscaping Non PGPS4650.0116,7530.3811,2020.2600000028,4200.6500Beach Non PGPS000000000012,4320.2912,4320.2900EstuaryNon PGPS000024,7720.5721,9980.51000046,7701.0700SUBTOTAL Non PGPS 8,625 0.20 16,753 0.38 46,971 1.08 69,615 1.60 42,915 0.99 12,432 0.29 197,311 4.53 3,520 0.08SUBTOTAL Pervious 8,625 0.20 16,753 0.38 46,971 1.08 69,615 1.60 42,915 0.99 12,432 0.29 197,311 4.53 3,520 0.08TOTAL All 30,803 0.71 22,020 0.51 54,221 1.24 72,338 1.66 53,111 1.22 38,261 0.88 270,754 6.22 8,628 0.20TDA 1TDA 2Within Project Site AreaNorth Side of Creek, Drains to CreekRailroad Berm and Beach Areas 1-5Access Driveway and Parking AreaRanger Residence AreaArea West of Ranger Residence and South of Creek That Drains to Rock Swale Area West of Ranger Residence and South of Creek That Drains to Creek Access Driveway and Off-Site Areas, Drains to Puget Sound South of Project SiteSurfaceDescriptionStormwater Site PlanMeadowdale Beach Park and Estuary Restoration ProjectDRAFTPage 3 of 5November 2018
Meadowdale Beach ParkStormwater Analysis - Proposed Land Cover and Drainage AreasAREA 1AREA 2AREA 3AAREA 3BAREA 4Area 5TOTALAREA 6Designation(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)TDA 1TDA 2North Side of Creek, Drains to CreekRailroad Berm and BeachAreas 1-5Access Driveway and Parking AreaRanger Residence AreaArea West of Ranger Residence and South of Creek That Drains to Rock Swale Area West of Ranger Residence and South of Creek That Drains to Creek Access Driveway and Off-Site Areas, Drains to Puget Sound South of Project SiteSurfaceDescriptionSidewalksNon PGIS004920.01000000004920.0100Existing (Remain) Non PGIS004920.01000000004920.0100ReplacedNon PGIS0000000000000000NewNon PGIS0000000000000000Gravel PathsNon PGIS002,2640.05000000002,2640.0500Existing (Remain) Non PGIS002,2640.05000000002,2640.0500ReplacedNon PGIS0000000000000000NewNon PGIS0000000000000000Concrete PadsNon PGIS0000000000000000Existing (Remain) Non PGIS0000000000000000Replaced Non PGIS0000000000000000New Non PGIS0000000000000000Roofs Non PGIS 5,8650.13 1,0500.02000000006,9150.1600Existing (Remain) Non PGIS 5,8650.131,0500.02000000006,9150.1600ReplacedNon PGIS0000000000000000NewNon PGIS0000000000000000Railroad Alignment Non PGIS0000000000000000Existing (Remain) Non PGIS0000000000000000Replaced Non PGIS0000000000000000New Non PGIS0000000000000000SUBTOTAL Non PGIS 5,865 0.13 3,806 0.09000000009,671 0.22 0 0Roadways PGIS 1,4640.0300000000001,4640.036170.01Existing (Remain) PGIS -19,908 -0.460000000000-19,908 -0.46 -4,383 -0.10Replaced PGIS 21,372 0.49000000000021,372 0.49 5,000 0.11New PGIS0000000000000000SUBTOTAL PGIS 1,464 0.0300000000001,464 0.03 617 0.01SUBTOTAL Impervious 7,329 0.17 3,806 0.090000000011,135 0.26 617 0.01Forested, TreesNon PGPS210,8914.8436,7290.8444,1131.017080.02460,76510.5800753,20617.29131,9913.03Landscaping Non PGPS30.003,7570.09000000003,7600.0900BeachNon PGPS000000000030,5160.7030,5160.7000EstuaryNon PGPS0000000000000000SUBTOTALNon PGPS 210,894 4.84 40,486 0.93 44,113 1.017080.02 460,765 10.58 30,516 0.70 787,482 18.08 131,991 3.03SUBTOTALPervious 210,894 4.84 40,486 0.93 44,113 1.017080.02 460,765 10.58 30,516 0.70 787,482 18.08 131,991 3.03TOTALAll218,223 5.01 44,292 1.02 44,113 1.017080.02 460,765 10.58 30,516 0.70 798,617 18.33 132,608 3.04Off-Site Areas that Drain Through Project AreaStormwater Site PlanMeadowdale Beach Park and Estuary Restoration ProjectDRAFTPage 4 of 5November 2018
Meadowdale Beach ParkStormwater Analysis - Proposed Land Cover and Drainage AreasAREA 1AREA 2AREA 3AAREA 3BAREA 4Area 5TOTALAREA 6Designation(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)(SF)(AC)TDA 1TDA 2North Side of Creek, Drains to CreekRailroad Berm and BeachAreas 1-5Access Driveway and Parking AreaRanger Residence AreaArea West of Ranger Residence and South of Creek That Drains to Rock Swale Area West of Ranger Residence and South of Creek That Drains to Creek Access Driveway and Off-Site Areas, Drains to Puget Sound South of Project SiteSurfaceDescriptionSidewalksNon PGIS004,9170.11 4,3860.101,1940.03 10,1960.230020,693 0.4800Existing (Remain) Non PGIS004920.01000010,196 0.230010,688 0.2500ReplacedNon PGIS004,4250.104,3860.101,1940.03000010,005 0.2300NewNon PGIS0000000000000000Gravel PathsNon PGIS002,8080.061,0240.02 1,1990.0300005,031 0.1200Existing (Remain) Non PGIS002,2640.05000000002,2640.0500ReplacedNon PGIS005440.01000000005440.0100NewNon PGIS00001,0240.021,1990.0300002,2230.0500Concrete PadsNon PGIS00630.006690.023300.01008290.02 1,891 0.0400Existing (Remain) Non PGIS0000000000000000ReplacedNon PGIS00001670.0000005860.017530.0200NewNon PGIS00630.005020.013300.01002430.011,1380.0300RoofsNon PGIS 5,8650.13 1,2850.03 1,171 0.030000008,321 0.1900Existing (Remain) Non PGIS 5,8650.131,0500.025420.010000007,4570.1700ReplacedNon PGIS002350.01000000002350.0100NewNon PGIS00006290.010000006290.0100Railroad Alignment Non PGIS000000000025,0000.5725,0000.5700Existing (Remain) Non PGIS000000000025,000 0.57 25,000 0.57 0 0ReplacedNon PGIS0000000000000000NewNon PGIS0000000000000000SUBTOTALNon PGIS 5,865 0.13 9,073 0.21 7,250 0.17 2,723 0.06 10,196 0.23 25,829 0.59 60,936 1.4000RoadwaysPGIS23,6420.54000000000023,6420.54 5,7250.13Existing (Remain)PGIS1,4640.0300000000001,4640.037250.02ReplacedPGIS21,372 0.49000000000021,372 0.495,0000.11NewPGIS8060.0200000000008060.0200SUBTOTALPGIS23,642 0.54000000000023,642 0.54 5,725 0.13SUBTOTALImpervious 29,507 0.68 9,073 0.21 7,250 0.17 2,723 0.06 10,196 0.23 25,829 0.59 84,578 1.94 5,725 0.13Forested, TreesNon PGPS219,0515.0336,7290.8455,1101.2748,3251.11503,68011.5600862,89519.81135,5113.11LandscapingNon PGPS4680.0120,5100.4711,2020.2600000032,1800.7400BeachNon PGPS000000000042,9480.9942,9480.9900EstuaryNon PGPS000024,7720.5721,9980.51000046,7701.0700SUBTOTALNon PGPS 219,519 5.04 57,239 1.31 91,084 2.09 70,323 1.61 503,680 11.56 42,948 0.99 984,793 22.61 135,511 3.11SUBTOTALPervious 219,519 5.04 57,239 1.31 91,084 2.09 70,323 1.61 503,680 11.56 42,948 0.99 984,793 22.61 135,511 3.11TOTALAll249,026 5.72 66,312 1.52 98,334 2.26 73,046 1.68 513,876 11.80 68,777 1.58 1,069,371 24.55 141,236 3.24Notes:PGIS: Pollution Generating Impervious SurfacePGPS: Pollution Generating Pervious SurfaceTotal Drainage AreaStormwater Site PlanMeadowdale Beach Park and Estuary Restoration ProjectDRAFTPage 5 of 5November 2018
Appendix C
Minimum Requirements Flow Charts
EDMONDS STORMWATER ADDENDUM JUNE 2017
8 3. APPLICABILITY OF THE MINIMUM REQUIREMENTS
Figure 3.1. Flow Chart for Determining Requirements for Development.
Yes No
Next Question
Yes No
Minimum Requirements No. 1 through 5 apply Minimum Requirement No. 2 applies
Does the project add 5,000 square feet or more of new plus replaced hard surfaces?
OR
Convert 0.75 acres or more of vegetation to lawn or landscaped areas?
OR
Convert 2.5 acres or more of native vegetation to pasture?
No
Is this a road related project? Yes
All Minimum Requirements
apply to the new and replaced
hard surfaces and converted
vegetation areas.
Does the project add
5,000 square feet or
more of new hard
surfaces?
Does the project result in 2,000 square feet, or greater, of new plus replaced hard surface area?
OR
Does the land disturbing activity total 7,000 square feet or greater?
Yes Do new hard surfaces add 50% or
more to the existing hard surfaces
within the project limits?
No additional
requirements.
No
No
Yes
All Minimum Requirements
apply to the new hard surfaces
and converted vegetation areas.
Appendix D
Construction SWPPP
DRAFT
Page | 1
Construction Stormwater Pollution Prevention Plan For Meadowdale Beach Park and Estuary Restoration Project Prepared For Department of Ecology – Northwest Regional Office 3190 – 160th Avenue SE Bellevue, WA 98008-5452 425-649-7000
Owner, Developer, and Operator/Contractor
Snohomish County:
Logan Daniels, P.E., Parks Engineer
Snohomish County Parks and Recreation
6705 Puget Park Drive
Snohomish WA 98296
Project Site Location 6026 156th Ave SW Edmonds, WA 98036 Certified Erosion and Sediment Control Lead Placeholder… SWPPP Prepared By Anchor QEA, LLC 720 Olive Way Suite 1900 Seattle, WA 98101 206-287-9130 David Rice, P.E – Project Civil Engineer SWPPP Preparation Date November 16, 2018 Project Construction Dates [Date]
DRAFT
Page | 2
Table of Contents
1 Project Information .............................................................................................................. 4
1.1 Existing Conditions ...................................................................................................... 5
1.2 Proposed Construction Activities .................................................................................. 9
2 Construction Stormwater Best Management Practices.......................................................11
2.1 The 13 Elements .........................................................................................................11
2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits .......................................11
2.1.2 Element 2: Establish Construction Access ...........................................................12
2.1.3 Element 3: Control Flow Rates ............................................................................13
2.1.4 Element 4: Install Sediment Controls ...................................................................14
2.1.5 Element 5: Stabilize Soils ....................................................................................15
2.1.6 Element 6: Protect Slopes....................................................................................16
2.1.7 Element 7: Protect Drain Inlets ............................................................................17
2.1.8 Element 8: Stabilize Channels and Outlets ..........................................................17
2.1.9 Element 9: Control Pollutants ...............................................................................18
2.1.10 Element 10: Control Dewatering ..........................................................................24
2.1.11 Element 11: Maintain BMPs .................................................................................24
2.1.12 Element 12: Manage the Project ..........................................................................25
2.1.13 Element 13: Protect Low Impact Development BMPs ..........................................26
3 Pollution Prevention Team .................................................................................................27
4 Monitoring and Sampling Requirements ............................................................................27
4.1 Site Inspection ............................................................................................................27
4.2 Stormwater Quality Sampling ......................................................................................27
4.2.1 Turbidity Sampling ...............................................................................................28
4.2.2 pH Sampling ........................................................................................................29
5 Reporting and Record Keeping ..........................................................................................30
5.1 Record Keeping ..........................................................................................................30
5.1.1 Site Log Book ......................................................................................................30
5.1.2 Records Retention ...............................................................................................30
5.1.3 Updating the SWPPP ...........................................................................................30
5.2 Reporting ....................................................................................................................30
5.2.1 Discharge Monitoring Reports ..............................................................................30
5.2.2 Notification of Noncompliance ..............................................................................31
DRAFT
Page | 3
List of Acronyms and Abbreviations
Acronym / Abbreviation Explanation ADA Americans with Disabilities Act
BMP Best Management Practice(s)
CESCL Certified Erosion and Sediment Control Lead
CO2 Carbon Dioxide
County Snohomish County Parks and Recreation Department
CSWGP Construction Stormwater General Permit
DMR Discharge Monitoring Report
Ecology Washington State Department of Ecology
ESC Erosion and Sediment Control
NTU Nephelometric Turbidity Units
sf square feet
SSP Stormwater Site Plan
SPCC Spill Prevention, Control, and Countermeasure
su Standard Units
SWPPP Stormwater Pollution Prevention Plan
TESC Temporary Erosion and Sediment Control
TMDL Total Maximum Daily Load
DRAFT
Page | 4
1 Project Information
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared as part of the National
Pollutant Discharge Elimination System stormwater permit requirements for the Meadowdale Beach
Park and Estuary Restoration project (Project). Project information is as follows:
Project/Site Name: Meadowdale Beach Park and Estuary Restoration
Street/Location: 6026 156th SW
City: Edmonds State: Washington Zip code: 98036
Subdivision: N/A
Receiving waterbody: Puget Sound
The Snohomish County Parks and Recreation Department (County) is proposing to construct
improvements to Meadowdale Beach County Park. The primary objectives of the project are to
restore ecological functions and expand the Lund’s Gulch Creek estuary, improve habitat conditions
for salmon and other wildlife in lower Lund’s Gulch Creek, address public safety issues involving the
existing railroad crossing, and improve access (including Americans with Disabilities Act (ADA)-
compliant access) to the beach.
Additional elements of the design include the following:
• Converting portions of the lower lawn area to stream marsh and riparian habitat
• Enhancing riparian vegetation along the creek
• Placing in-stream wood structures
• Enhancing existing habitat north of the existing foot-bridge
• Connecting existing fresh water wetland to the creek
• Providing picnic viewpoints
• Re-routing paths
• Providing a new, portable restroom enclosure
• Constructing a new foot-bridge over Lund’s Gulch Creek
• Addressing other ADA issues within the lower park area
• Improving stormwater runoff controls and treatment
The project will also include improvements to the ADA access road and parking, as needed to
support construction activity and improve ADA access, as well as interpretive/educational signage.
The purpose of this SWPPP is to describe the proposed construction activities and temporary and
permanent erosion and sediment control (TESC) measures, pollution prevention measures,
inspection/monitoring activities, and recordkeeping that will be implemented during the proposed
construction project. This SWPPP is intended to be reviewed with construction documentation to
DRAFT
Page | 5
support final project permitting for construction and to provide guidance for selection and
implementation of required construction stormwater pollution prevention measures. The SWPPP has
been prepared using the Washington State Department of Ecology Construction SWPPP template.
A Stormwater Site Plan (SSP) report has been prepared and submitted with this SWPPP for the
Project. The SSP is the comprehensive report containing the technical information and analyses to
demonstrate compliance with stormwater requirements. The SSP incorporates the SWPPP by
reference as Appendix D of the SSP. The SSP supports the stormwater design as shown on the
Project construction plans.
The Project construction plans include TESC drawings. The TESC drawings are included in Appendix A
of this document and specifically address work to be undertaken in areas above the ordinary high
water line. Work to be undertaken below the ordinary high water line shall comply with the Section
404 permit issued by the U.S. Army Corps of Engineers, the Hydraulic Project Approval issued by the
Washington State Department of Fish and Wildlife, the Section 401 Certificate issued by Washington
State Department of Ecology (Ecology), and other applicable permit requirements.
1.1 Existing Conditions
Existing conditions and acreage of the existing project site are as follows:
Total acreage: 108 acres (Park Total), 10 acres (Project Site)
Disturbed acreage: 4.4 acres
Existing structures: 0.02 acres
Landscape topography: 1.4 acres
Drainage patterns: See description below.
Existing Vegetation: 4.0 acres
Critical Areas (wetlands, streams, high erosion risk, steep or difficult to stabilize slopes):
List of known impairments for 303(d) listed or Total Maximum Daily Load (TMDL) for the receiving
waterbody: Ecology’s Water Quality Atlas indicates that Lund’s Gulch Creek, which flows through the
Project site to Puget Sound, has a Category 5 bioassessment listing because the two most recent
data points indicate that biological integrity is degraded based on benthic sampling by Snohomish
County. There is also an area in Puget Sound just west of the Project Site that has a Category 2
sediment listing for 2,4-Dimethylphenol and Benzyl Alcohol. The site also has a Category 1 sediment
listing for several chemical constituents. Another site along the shoreline of Puget Sound 1 mile
south of the park has Category 1 listing for several constituents and a site approximately 1 mile north
has a Category 1 sediment listing for several constituents.
DRAFT
Page | 6
The park spans the boundary between the City of Edmonds and unincorporated Snohomish County.
The 108-acre Park consists of several parcels and is owned, operated, and maintained by the
Snohomish County Parks and Recreation Department. The park extends from the rim of Lund’s Creek
Gulch down to tidelands at the northern end of Browns Bay on Puget Sound.
The park’s natural forests, stream, beach, and trails are the main attractions and are popular with
residents throughout Snohomish County and nearby areas, attracting 50,000 to 70,000 annual
visitors. The beach access is currently one of two available access points, along with Picnic Point
County Park, between downtown Edmonds and Mukilteo. The park is also extensively used for
environmental education by local schools, Boy and Girl Scouts, and Edmonds Community College
(Dailer 2015). The park is also an official Washington Water Trails campsite, providing beach camping
to people using a non-motorized watercraft.
The park’s main public access is from a parking lot located off of 156th Street SW. This upper portion
of the park includes a small playground, portable toilets, a trailhead, and 30 parking stalls. A
1.25-mile earthen trail begins at the upper parking lot and follows Lund’s Gulch Creek to a partially
paved loop trail in the lower park area. This loop trail connects recreational amenities to the box
culvert that provides beach access under the BNSF railroad. Facilities at the lower park include paved
and unpaved trails, a sand volleyball court, picnic shelter, five uncovered picnic tables on concrete
pads, a lawn area, pedestrian bridge, ADA parking, portable toilets, and a ranger residence. The main
recreational activities at the park include beach access, walking and hiking, picnicking, bird
watching/nature enjoyment, and environmental education programs.
The existing earthen railroad embankment parallels the beach, separating the County tidelands from
the park lawn. The embankment is heavily armored with riprap and boulder-sized rock and is
approximately 30 feet wide at the top and 60 feet wide at the base. The top of the embankment is
approximately 8 feet above the adjacent foot-path. The embankment lies within the 100-foot BNSF-
owned right-of-way. The embankment supports two tracks: Main 1 track (west track) and Main 2
track (east track). The corridor, a segment of the BNSF Scenic Subdivision (Line Segment 50, Milepost
21.8; Seattle to Wenatchee, Washington), has a high daily volume of freight, passenger, and
commuter railroad traffic, which will likely increase over time. This line also serves Amtrak and Sound
Transit passenger trains.
The existing concrete box culvert is located at the beginning of an approximately 4.5-degree curve in
the railroad line. The culvert opening is 6 feet high by 6 feet wide and has an upstream invert
elevation of 9.59 feet and a downstream invert elevation of 9.07 feet North American Vertical Datum
of 1988. Following construction of the culvert, a wooden deck was placed approximately 2 feet above
DRAFT
Page | 7
the bottom of the culvert to accommodate public beach access and maintenance of the culvert. The
wooden deck has since been replaced with steel grating.
The culvert must accommodate creek flows, sediment, and fish passage, and it provides the only
public beach access for park visitors. Year-round creek backwatering, high winter tides and stream
flows, and sand and gravel deposition frequently render the culvert inaccessible. In addition, walkway
grates are removed when sediments accumulate at the entrance, to facilitate fish passage. Without
the grates installed, there is no suitable walking surface within the culvert for pedestrian beach
access. Park users either traverse the culvert (sometimes in very cold knee-high water) or seek
alternate routes to the beach, such as crossing the tracks, despite railroad right-of-way fencing and
signs indicating the hazard and prohibiting trespassing. In addition, the culvert does not meet ADA
guidelines for horizontal or vertical clearance.
Description of Existing Drainage Areas and Patterns:
Topographic survey data for the Project site, along with light detection and ranging (LiDAR) data and
aerial photography, were used to delineate existing drainage areas that discharge to Lund’s Gulch
Creek or Puget Sound within or adjacent to the Project site. Table 1 provides a summary of existing
drainage areas. Drainage areas are characterized by pervious and hard surface areas.
Most of the site discharges stormwater runoff directly to Lund’s Gulch Creek, which then discharges
to Puget Sound at the west end of the site. Drainage Areas 1 through 4 represent the lower part of
the larger Lund’s Gulch Creek Drainage Basin. The Lund’s Gulch Creek Drainage Basin includes
approximately 1,440 acres (2.25 square miles) that drain to Puget Sound through the outlet of Lund’s
Gulch Creek within the project site.
Local stormwater drainage basins and existing stormwater facilities at the site are shown on the Site
Maps in Appendix A.
DRAFT
Page | 8
Table 1 Existing Drainage Areas
Area
TDA 1 TDA 2
Area 1
Access Road and Parking Area
(sf)
Area 2
Ranger Residence Area
(sf)
Area 3
Hillside and Park Area South of Creek
(sf)
Area 4
Hillside and Park Area North of Creek
(sf)
Area 5
Railroad Berm and Beach
(sf)
TOTAL Areas 1–5
(sf)
Overall Lund’s Gulch Creek Drainage Basin
(acres)
Area 6
Access Road Entrance and Off-Site Areas
(sf)
Within Project Site Area
Hard Surface Area 22,836 1,184 14,211 12,159 10,206 60,596 1.4 5,108
Pervious Surface Area 9,442 7,800 112,276 39,786 27,368 196,672 4.5 3,520
Subtotal 32,278 8,984 126,487 51,945 37,574 257,268 5.9 8,628
Off-Site Areas that Drain through Project Site
Hard Surface Area 5,865 4,778 0 0 14,795 25,438 362.9 617
Pervious Surface Area 210,883 30,112 67,331 461,931 16,408 786,665 1,071.2 131,991
Subtotal 216,748 34,890 67,331 461,931 31,203 812,103 1,434.1 132,608
Total Drainage Area
Hard Surface Area 28,701 5,962 14,211 12,159 25,001 86,034 364.3 5,725
Pervious Surface Area 220,325 37,912 179,607 501,717 43,776 983,337 1,075.7 135,511
Total 249,026 43,874 193,818 513,876 68,777 1,069,371 1,440.0 141,236
Notes:
TDA = Threshold Drainage Area SF = square foot
DRAFT
Page | 9
1.2 Proposed Construction Activities
Description of Site Development:
The Project will include significant investment by Snohomish County to improve recreation in the
park and restore vital estuarine habitat. Improvements are envisioned to include the following:
• Railroad Bridge: The existing box culvert will be replaced with a four-span railroad bridge with
two 40-foot clear center spans and two 25-foot abutment spans centered on the location of the
current culvert and creek outlet alignment.
• Habitat Restoration: The lower lawn area and part of the upper lawn area will be converted to
estuary, stream, marsh, and riparian habitat, with additional habitat area restored by enhancing
riparian vegetation and in-stream wood structures. Existing habitat will also be enhanced
upstream of the pedestrian footbridge across Lund’s Gulch Creek by installing large woody
debris and enhancing existing riparian vegetation.
• Recreation Facilities:
- Beach Access: A pedestrian access path to the beach will be located under the railroad
bridge and will provide the 80-inch minimum vertical clearance required for ADA-
compliant access.
- Pedestrian Bridge: A new pedestrian bridge will be installed across the restored stream
channel downstream of the existing pedestrian bridge to connect pathways on the north
and south sides of the stream.
- Paths: The path connecting the picnic shelter to the pedestrian bridge and path on the
north side of the creek will be partially re-aligned. The loop path north of the creek and
proposed marsh will be truncated to avoid habitat fragmentation. Other existing paths
will be resurfaced and modified, as needed, to accommodate restoration and new park
facilities.
- Lawn Renovation: Drainage of remaining lawn areas will be improved by regrading lawn
areas and adding a more permeable subsurface layer, and the volleyball court will be
converted to lawn area.
- ADA-Compliant Access: ADA-compliant access will be extended throughout the park by
constructing accessible walkways from the parking area to the beach.
- Site Furnishings: New benches, picnic tables, and other site furnishings will be provided
to enhance the park and recreational facilities.
- Picnic Viewpoints: Two picnic viewpoints would be established at the new path
terminus.
Description of construction activities:
Construction activities will include site preparation, placement of temporary erosion control best
management practices (BMPs), clearing and grubbing, upland demolition, construction of the new
BNSF Railroad Bridge, mass upland grading, fill and excavation, creation of estuarine habitat, removal
and replanting of native and ornamental tree and shrub vegetation, placing of habitat gravel and
boulders for drainage channel daylighting, new utility construction and removal/abandonment of old
DRAFT
Page | 10
utilities, installation of a wet bio-filtration swale and other drainage swales, shoreline grading and
nourishment with new beach habitat gravel, and access road and parking lot improvements.
Description of site drainage including flow from and onto adjacent properties:
Most of the site discharges stormwater runoff directly to Lund’s Gulch Creek, which then discharges
to Puget Sound at the west end of the site. The existing park has limited stormwater conveyance and
control infrastructure. Existing stormwater facilities within the project site include the following:
• Access Road Swale: A paved swale runs along the upslope side of the existing a that
provides ADA-compliant and ranger access to the lower park. The access road is sloped so
that runoff from the access road and forested slope south of the access road collects in the
swale and discharges through a vegetated area towards Lund’s Gulch Creek, where the access
road makes a hairpin turn into the ADA parking area. As-built drawings of the park indicate
that the swale is 1 foot deep and is paved with asphalt, similar to the adjacent access road.
Existing water, sewer, electrical, and communications service lines are buried under the swale.
• Catch Basin and Drain to Creek in ADA Parking Lot: A single catch basin is located in the
lowest (northwest) corner of the ADA parking area at the bottom of the access road, behind
the ranger residence. The catch basin discharges runoff through a 6-inch-diameter PVC pipe
north to Lund’s Gulch Creek. The catch basin only captures runoff from a small portion of the
paved parking area surface. Runoff from most of the paved parking area and lower access
road discharges via sheet flow runoff to adjacent vegetated areas.
• Roof Drains: Gutters and downspouts collect and discharge runoff from rooftops over the
ranger residence, an existing picnic shelter, and a portable restroom enclosure directly to
adjacent lawn, landscaping, or paved areas.
• Drinking Fountain Drain: A drinking fountain adjacent to the existing picnic shelter drains to
the soil below the adjacent lawn area through a small sump with an inlet grate and a
subsurface trench drain.
• Lund’s Gulch Creek and Culvert: Runoff from all of the upland area of the project site drains
to Lund’s Gulch Creek. As noted, the creek flows through a concrete box culvert through the
BNSF railway embankment to Puget Sound.
Proposed drainage improvements to be constructed as part of the project include the following:
• A reconstructed swale along the uphill side of the access road that will convey runoff from
the access road to a catch basin at the downstream end of the swale. The catch basin will
convey runoff to a storm drain system.
• A network of 8- and 12-inch-diameter corrugated polyethylene storm drain pipe and catch
basins will be installed to capture and convey runoff from PGHS in the access road and
parking area to a wet bio-filtration swale located in Drainage Area 2.
DRAFT
Page | 11
• The wet bio-filtration swale will be installed along the south edge of the paved loop pathway
near the lawn area. The wet bio-filtration swale will serve as the treatment BMP for runoff
from the access road, parking area, and other surfaces tributary to the storm drain facilities.
• Flow from the biofiltration swale will be conveyed to a rock-lined swale located in the estuary
area via a 12-inch-diameter corrugated polyethylene storm drain pipe.
• The rock-lined swale will be constructed to convey the stormwater to the mean higher high
water mark within the estuary to meet requirements for discharging directly to Puget Sound
through manmade conveyance facilities.
• Runoff from impervious pathways will be dispersed through adjacent sheet flow dispersion
areas that will consist of a gravel dissipating strip and landscaping that will provide the
needed 10-foot of vegetated flow path for every 20 feet of contributing surface.
• Runoff from roofs will be dispersed through adjacent lawn areas or landscaping.
Description of final stabilization:
Final stabilization will include more than 28,000 sf of new landscaping; native tree and shrub
plantings; riparian enhancement planting and estuary restoration over an area of over 47,000 sf;
placement of more than 15,000 sf of crushed rock, gravel, or beach sand and gravel surfaces;
placement of more than 20,000 sf of paved walkway surface, and placement of more than 22,000 sf
of new or overlaid roadway surface.
Contaminated Site Information:
The Project does not include or anticipate any proposed activities dealing with contaminated soils or
groundwater.
2 Construction Stormwater Best Management Practices
2.1 The 13 Elements
2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of
construction will be clearly marked before land-disturbing activities begin. Trees that are to be
preserved, as well as all sensitive areas and their buffers, shall be clearly delineated and tree
protection fencing shall be installed, as shown on the design drawings. In general, natural vegetation
and native topsoil shall be retained in an undisturbed state to the maximum extent possible. High
Visibility Plastic or Metal Fence will be used to mark clearing limits for the project and will be placed
prior to construction. Fences will be maintained throughout the construction period. Natural
vegetation will be preserved for any areas beyond the clearing limits; no disturbance or removal of
ground cover beyond the clearing limits will be permitted. Where a silt fence is placed along the
clearing limits, marking using High Visibility Plastic or Metal Fence will not be required. Tree
protection and clearing limit marking and maintenance requirements are shown on the TESC
drawings in Appendix A and on the details included in Appendix B.
DRAFT
Page | 12
List and describe BMPs:
BMP C101 (Preserving Natural Vegetation)
BMP C102 (Buffer Zones)
BMP C103 (High Visibility Plastic or Metal Fence)
Installation Schedules:
Prior to Clearing and Grading.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the Certified Erosion and Sediment Control Lead
(CESCL) and within 24 hours following any increase in discharge from the site. The site inspector will
use the site inspection forms provided in Appendix D. Where the need is identified by the site
inspection, maintenance and repairs will be made to each BMP and documented as soon as possible
following site inspections.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.2 Element 2: Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized; however, where
necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads.
Stabilized Construction Entrances shall be required at each entrance to the site from public roads.
Wheel washing, street sweeping, and street cleaning shall be employed, as needed, to prevent
sediment from entering state waters. All wash wastewater shall be controlled on site.
A Stabilized Construction Entrance will be placed at the entrance to the Project site and will remain
throughout the full period of construction (or will be reconstructed as the entrance point from the
paved access road changes). The entrance will initially be located at the access point from the paved
parking lot at the end of the access road. The Construction Entrance will be relocated as needed as
Project work proceeds. The entrance will consist of geotextile beneath 4- to 8-inch quarry spalls a
minimum of 12 inches thick. The entrance pad will be a minimum of 15 feet wide and 100 feet long.
Additional details are provided on the TESC drawings in Appendix A and in the BMP description in
Appendix B.
List and describe BMPs:
• BMP C105 (Stabilized Construction Entrance)
• BMP C107 (Construction Road/Parking Area Stabilization)
Installation Schedules:
DRAFT
Page | 13
Prior to Clearing and Grading.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. Where the need is identified by the site inspection, quarry spalls, crushed rock, gravel
base, or hog fuel shall be added to maintain a stable driving surface and prevent sediment from
leaving the site.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.3 Element 3: Control Flow Rates
No properties or waterways downstream of the Project site require flow control protection.
Stormwater runoff discharges from the site directly to Puget Sound. Because Puget Sound is listed a
major receiving body and meets the criteria for flow control exemption, no permanent flow controls
are required. However, Snohomish County requires temporary facilities to control discharge of
sediment laden water to Puget Sound.
Will you construct stormwater retention and/or detention facilities?
Yes No
Will you use permanent infiltration ponds or other low impact development (example: rain gardens,
bio-retention, porous pavement) to control flow during construction?
Yes No
List and describe BMPs:
• No BMPs are specified.
Installation Schedules:
N/A
Inspection and Maintenance plan:
N/A
Responsible Staff:
CESCL, Construction Contractor Primary Contact
DRAFT
Page | 14
2.1.4 Element 4: Install Sediment Controls
All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP
before leaving the construction site or prior to being discharged to an infiltration facility. Runoff from
fully stabilized areas may be discharged without a sediment removal BMP. Full stabilization means
concrete or asphalt paving; quarry spalls used as ditch lining; or the use of rolled erosion products, a
bonded fiber matrix product, or established vegetative cover in a manner that will fully prevent soil
erosion.
Silt fences will be installed downslope of all disturbed upland areas. Silt Fences will be installed at the
same time clearing limits are marked, after the Stabilized Construction Entrance is installed and prior
to initiating other grading work. Silt Fences will remain during the duration of the Project, but may
be relocated to accommodate grading and riparian and shoreline work. Silt Fence will consist of steel
or wood posts no more than 6 feet apart with welded wire backing and filter fabric material no less
than 2 feet high. Additional details are provided on the TESC drawings in Appendix A and in the BMP
description in Appendix B.
Where soil materials and imported materials will be stockpiled on or adjacent to existing pavement,
inlet protection or other appropriate sediment control device will be installed around all inlets and
on the paved surface downslope of these areas, to prevent sediment from leaving the site. Additional
details are provided on the TESC drawings in Appendix A and in the BMP description in Appendix B.
In addition, sediment will be removed from paved areas in and adjacent to construction work areas
manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle
tires away from the site and to minimize washoff of sediments from adjacent streets in runoff.
Whenever possible, sediment-laden water shall be dispersed into on-site, relatively level, vegetated
areas.
List and describe BMPs:
• BMP C233 (Silt Fence)
• BMP C220 (Storm Drain Inlet Protection)
Installation Schedules:
Prior to clearing and grading, following construction entrance construction.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. Where the sediment controls are damaged or do not provide a complete barrier for
sediment transport from the site, as indicated by the inspection, maintenance and repairs will be
made to each BMP and documented as soon as possible following site inspections.
DRAFT
Page | 15
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.5 Element 5: Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent
erosion throughout the life of the Project. The specific BMPs for soil stabilization that shall be used
on the Project include Temporary and Permanent Seeding, Mulching, and Nets and Blankets. If
needed, Plastic Covering may also be used.
Nets and Blankets or Plastic Covering will be provided as temporary cover for exposed soils during
construction. Additional details are provided on the TESC drawings in Appendix A and in the BMP
descriptions in Appendix B. Mulching and Permanent Seeding will be used to stabilized permanent
slopes or slopes that will be exposed for an extended period of time.
In general, cut and fill slopes will be stabilized as soon as possible, and soil stockpiles will be
temporarily covered with plastic. All stockpiled soils shall be stabilized from erosion, protected with a
silt fence or block and gravel filter, and where possible, be located away from storm drain inlets,
waterways, and drainage channels.
West of the Cascade Mountains Crest
Season Dates Number of Days Soils Can be Left Exposed
During the Dry Season May 1 – September 30 7 days
During the Wet Season October 1 – April 30 1 day
Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on the
weather forecast.
Anticipated project dates: Start date: XXX XX, 20XX End date: XXX XX, 20XX
Will you construct during the wet season?
Yes No
List and describe BMPs:
• BMP C120 (Temporary and Permanent Seeding)
• BMP C121 (Mulching)
• C122 (Nets and Blankets)
• C123 (Plastic Covering)
DRAFT
Page | 16
Installation Schedules:
When soils are exposed or stockpiles are stablished, as indicated in the table above or at the end of a
shift before a holiday or weekend, if needed, based on the weather forecast.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. Where exposed soils or stockpiles are not well covered or coverings are not in good
contact with the ground, as indicated by the inspection, maintenance and repairs will be made to
each BMP and documented as soon as possible following site inspections.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.6 Element 6: Protect Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes
erosion. The specific BMPs for slope protection that shall be used on this project include Temporary
and Permanent Seeding, Mulching, and Nets and Blankets. Nets and Blankets or Plastic Covering will
be provided as temporary cover for exposed slopes during construction. Additional details are
provided on the TESC drawings in Appendix A and in the BMP descriptions in Appendix B. Mulching
and Permanent Seeding will be used to stabilize permanent slopes or slopes that will be exposed for
an extended period of time. Steep slopes will be present at the site during construction.
Will steep slopes be present at the site during construction?
Yes No
List and describe BMPs:
• BMP C120 (Temporary and Permanent Seeding)
• BMP C121(Mulching)
• BMP C122 (Nets and Blankets)
• BMP C123 (Plastic Covering)
Installation Schedules:
When steep slopes are exposed, as indicated in the table above or at the end of a shift before a
holiday or weekend, if needed, based on the weather forecast.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. Where exposed slopes are not well covered or coverings are not in good contact with
DRAFT
Page | 17
the ground, as indicated by the inspection, maintenance and repairs will be made to each BMP and
documented as soon as possible following site inspections.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.7 Element 7: Protect Drain Inlets
All existing storm drain inlets, or any new storm drain inlets and culverts made operable during
construction, shall be protected to prevent unfiltered or untreated water from entering the drainage
conveyance system. There is only one existing storm drain inlet at the site. The first priority is to keep
all access roads clean of sediment and sediment-laden water from entering storm drains until
treatment can be provided. A Storm Drain Inlet Protection (catch basin insert) will be implemented
for all drainage inlets and culverts that could potentially be impacted by sediment-laden runoff on
and near the project site.
The Storm Drain Inlet Protection shall consist of catch basin filters located at all catch basin inlets
within the Project area. They will consist of a geotextile fabric that captures sediment for removal.
Each insert shall have a built-in overflow or runoff that will allow water to pass through to the storm
drain system during a storm event when the catch basin filter is full or plugged. Additional details are
provided on the TESC drawings in Appendix A and in the BMP description in Appendix B.
List and describe BMPs:
• BMP C220 (Storm Drain Inlet Protection)
Installation Schedules:
Install prior to clearing and grading and prior to installation of construction entrances, after clearing
limits are marked.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. If the catch basin insert becomes clogged, as indicated by the inspection, clean or
replace the insert as soon as possible following site inspections. Do not wash sediment from inserts
or other inlet controls into storm drains while clearing.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
2.1.8 Element 8: Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels or discharged to a stream or some other natural
drainage point, efforts will be taken to prevent downstream erosion. An existing stream channel and
DRAFT
Page | 18
natural outlet are part of the existing natural drainage system at the Project site. Construction of
permanent drainage channels are also proposed as part of the Project; however, neither the
proposed permanent drainage channels, nor the natural drainage channel will be used to convey
runoff during construction. Runoff will be diverted around the channels during construction by
temporary pumps and piping. Therefore, no BMPs from this element will be implemented.
All temporary on-site conveyance facilities shall be designed, constructed, and stabilized to minimize
erosion from the expected peak flow from a Type 1A, 10-year, 24-hour recurrence interval storm for
the developed condition. Alternatively, the 10-year, 1-hour peak flow rate indicated by an approved
continuous runoff simulation model, increased by a factor of 1.6, may be used. Stabilization,
including armoring material adequate to prevent erosion of outlets, adjacent streambanks, slopes,
and downstream reaches shall be provided at the outlets of all conveyance systems. Permanent
channels will be armored with streambed boulder, cobbles, and large woody debris prior to diverting
flow into the channels.
List and describe BMPs:
• No BMPs are specified
Installation Schedules:
N/A
Inspection and Maintenance plan:
N/A
Responsible Staff:
N/A
2.1.9 Element 9: Control Pollutants
The following pollutants are anticipated to be present on-site:
Table 1 – Pollutants
Pollutant
Waste Materials
Demolition Debris
Fuel for Construction Equipment
Mechanical Fluids for Construction Equipment
All pollutants, including waste materials and demolition debris, that occur on site shall be handled
and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping
and preventative measures will be taken to ensure that the site will be kept clean, organized, and free
DRAFT
Page | 19
of debris. If required, BMPs noted below shall be implemented to control specific sources of
pollutants.
Cover, containment, and protection from vandalism shall be provided for all chemicals, liquid
products, petroleum products, and other materials that have the potential to pose a threat to human
health or the environment. On-site fueling tanks shall include secondary containment.
Application of fertilizers and pesticides shall be conducted in a manner and at application rates that
will not result in loss of chemical to stormwater runoff. Manufacturers’ label requirements for
application rates and procedures shall be followed.
Maintenance, fueling and repair of heavy equipment and vehicles shall be conducted using spill
prevention and control measures consistent with Volume IV, Chapters 2 and 3 of the Snohomish
County Drainage Manual and Chapter 7.53 of the Snohomish County Code.
• All vehicles, equipment, and petroleum product storage/dispensing areas will be inspected
regularly to detect any leaks or spills, and to identify maintenance needs to prevent leaks or
spills.
• Spill prevention measures, such as drip pans, will be used when conducting maintenance and
repair of vehicles or equipment.
• In order to perform emergency repairs on site, temporary plastic will be placed beneath and,
if raining, over the vehicle.
• Contaminated surfaces shall be cleaned immediately following any discharge or spill incident.
• Water from wheel washes shall be disposed of in accordance with the requirements of BMP
C106 – Wheel Wash.
• Contaminated surfaces shall be cleaned immediately following any spill incident.
Excavation and dewatering waste:
• Dewatering BMPs and BMPs specific to the excavation (including handling of contaminated
soils) are discussed under Element 10.
Demolition:
• Dust released from demolished paved pathways, buildings, or structures will be controlled
using Dust Control measures.
• Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will be
protected using Storm Drain Inlet Protection.
• Process water and slurry resulting from sawcutting and surfacing operations will be
prevented from entering the waters of the State by implementing Sawcutting and Surfacing
Pollution Prevention measures.
Concrete and grout:
BMPs shall be used to prevent or treat contamination of stormwater runoff by pH modifying sources.
These sources include, but are not limited to, bulk cement, cement kiln dust, fly ash, new concrete
DRAFT
Page | 20
washing, curing waters, waste streams generated from concrete grinding and sawing, exposed
aggregate processes, dewatering concrete vaults, concrete pumping and mixer washout waters.
• Concrete trucks shall only be washed out off-site or in designated concrete washout areas,
and shall not be washed out onto the ground, or into storm drains, open ditches, streets, or
streams. Excess concrete shall not be dumped on site, except in designated concrete washout
areas.
• Adjustment to the pH of stormwater will be performed if necessary to prevent violations of
water quality standards. Written approval shall be obtained from the Washington State
Department of Ecology prior to using chemical treatment other than carbon dioxide (CO2) or
dry ice to adjust pH.
Sanitary wastewater:
• Portable sanitation facilities shall be located away from sensitive areas and will be firmly
secured, regularly maintained, and emptied and cleaned regularly as needed.
Solid Waste:
• Solid waste will be stored in secure, clearly marked containers.
Other:
• Other BMPs will be administered as necessary to address any additional pollutant sources on
site.
As per the Federal regulations of the Clean Water Act and according to Final Rule 40 CFR Part 112, as
stated in the National Register, a Spill Prevention, Control, and Countermeasure (SPCC) Plan is
required for construction activities. The Contractor shall be responsible for preparing and
maintaining an SPCC Plan per the requirements of the Contract Documents. This Plan must:
• Be well thought out in accordance with good engineering
• Achieve three objectives: prevent spills, contain a spill that occurs, and clean up the spill
• Identify the name, location, owner, and type of facility
• Include the date of initial operation and oil spill history
• Name the designated person responsible
• Show evidence of approval and certification by the person in authority
• Contain a facility analysis
Mobile refueling, maintenance and repair of heavy equipment, and concrete washing and sawing
operations will occur per the approved SPCC Plan. Any spill locations will be immediately cleaned
and waste material appropriately disposed of following any discharge or spill incident, as required by
the approved SPCC Plan.
List and describe BMPs:
• BMP C140 (Dust Control)
DRAFT
Page | 21
• BMP C150 (Materials On Hand)
• BMP C151 (Concrete Handling)
• BMP C152 (Sawcutting and Surfacing Pollution Prevention)
• BMP C220 (Storm Drain Inlet Protection)
Installation Schedules:
Install, maintain, or upgrade BMPs, as needed throughout construction to control pollutants.
Inspection and Maintenance plan:
All BMPs to be inspected at least once a week by the CESCL and within 24 hours following any
increase in discharge from the site. The site inspector will use the site inspection forms provided in
Appendix D. If a BMP is damaged or if additional control measures need to be applied to control
pollution, as indicated by an inspection, repair, replace, or upgrade BMPs as soon as possible after
site inspections.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site?
Yes No
If maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site, the project
specifications require that the Contractor comply with the following:
Storage tank placement: The Contractor shall place fuel or other petroleum product (hereinafter
referred to collectively as fuel) storage tanks or containers at least 20 feet from saltwater bodies,
streams, flowing or dry watercourses, lakes, wetlands, reservoirs, and any other water source in a
discharge area.
Storage area dikes: The Contractor shall construct storage area dikes at least 12 inches high or
graded and sloped to permit safe containment of leaks and spills equal to the capacity located in
each area plus a sufficient amount of freeboard to contain the 25-year rainstorm.
Diked area barriers: The Contractor shall provide diked areas with an impermeable barrier at least
50 mils thick. The Contractor shall provide areas used for refueling operations with an impermeable
liner at least 50 mils thick buried under 2 to 4 inches of soil.
Underground tank prohibitions: The Contractor shall not use underground storage tanks.
Installation schedules: Prior to fueling or maintenance of equipment on site.
Inspection and Maintenance plan: All BMPs to be inspected at least once a week by the CESCL and
within 24 hours following any increase in discharge from the site. The site inspector will use the site
DRAFT
Page | 22
inspection forms provided in Appendix D. If a BMP is damaged or if additional control measures
need to be applied to control pollution, as indicated by an inspection, repair, replace, or upgrade
BMPs as soon as possible after site inspections.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
Will wheel wash or tire bath system BMPs be used during construction?
Yes No
List and describe BMPs:
• No BMPs are specified.
Installation Schedules:
N/A
Inspection and Maintenance plan:
N/A
Responsible Staff:
N/A
Will pH-modifying sources be present on-site?
Yes No If yes, check the source(s).
Table 3 – pH-Modifying Sources
None
Bulk cement
Cement kiln dust
Fly ash
Other cementitious materials
New concrete washing or curing waters
Waste streams generated from concrete grinding and sawing
Exposed aggregate processes
Dewatering concrete vaults
Concrete pumping and mixer washout waters
Recycled concrete
Recycled concrete stockpiles
Other (i.e., calcium lignosulfate) [please describe: ]
DRAFT
Page | 23
List and describe BMPs:
• BMP C152 (Sawcutting and Surfacing Pollution Prevention)
Installation Schedules:
Prior to performing new concrete installations and sawcutting or surfacing concrete.
Inspection and Maintenance plan:
All BMPs to be inspected prior to and weekly during concrete installation and sawcutting work. The
site inspector will use the site inspection forms provided in Appendix D. If a BMP is damaged or if
additional control measures need to be applied to control pollution, as indicated by an inspection,
stop concrete work and upgrade controls as soon as possible.
Responsible Staff:
Adjustment of pH will be performed if outside the range of 6.5 to 8.5 su. Written approval from
Ecology shall be obtained before using chemical treatment with the exception of CO2 or dry ice to
modify pH. The following shall be used to prevent pH-modifying sources from contaminating
stormwater:
List and describe BMPs:
BMP C152 (Sawcutting and Surfacing Pollution Prevention)
Installation Schedules:
Prior to performing new concrete installations and sawcutting or surfacing concrete.
Inspection and Maintenance plan:
All BMPs to be inspected prior to and weekly during concrete installation and sawcutting work. The
site inspector will use the site inspection forms provided in Appendix D. If a BMP is damaged or if
additional control measures need to be applied to control pollution, as indicated by an inspection,
stop concrete work and upgrade controls as soon as possible.
Responsible Staff:
CESCL, Construction Contractor Primary Contact
Will uncontaminated water from water-only based shaft drilling for construction of building, road,
and bridge foundations be infiltrated provided the wastewater is managed in a way that prohibits
discharge to surface waters?
Yes No
DRAFT
Page | 24
List and describe BMPs:
• No BMPs are specified.
Installation Schedules:
N/A
Inspection and Maintenance plan:
N/A
Responsible Staff:
N/A
2.1.10 Element 10: Control Dewatering
All dewatering water from open cut excavation, foundation work, trench, or underground vaults shall
be dispersed over relatively flat, vegetated areas. Clean, non-turbid dewatering water will be
dispersed or discharged to systems tributary to the receiving waters of the State in a manner that
does not cause erosion, flooding, or a violation of state water quality standards in the receiving
water. Highly turbid dewatering water from soils known or suspected to be contaminated, or from
use of construction equipment, will require additional monitoring and treatment as required for the
specific pollutants based on the receiving waters into which the discharge is occurring. Such
monitoring is the responsibility of the contractor. Dewatering of soils known to be free of
contamination will trigger BMPs to trap sediment and reduce turbidity.
List and describe BMPs:
• No BMPs are specified.
Installation Schedules:
N/A
Inspection and Maintenance plan:
N/A
Responsible Staff:
N/A
2.1.11 Element 11: Maintain BMPs
All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained and
repaired as needed to ensure continued performance of their intended function. Maintenance and
repair shall be conducted in accordance with each particular BMP specification (see Volume II of the
Snohomish County Drainage Manual). Visual monitoring of all BMPs installed at the site will be
DRAFT
Page | 25
conducted at least once every calendar week and within 24 hours of any stormwater or non-
stormwater discharge from the site. If the site becomes inactive and is temporarily stabilized, the
inspection frequency may be reduced to once every calendar month.
All temporary ESC BMPs shall be removed within 30 days after final site stabilization is achieved or
after the temporary BMPs are no longer needed. Trapped sediment shall be stabilized on-site or
removed. Disturbed soil resulting from removal of either BMPs or vegetation shall be permanently
stabilized.
Additionally, protection must be provided for all BMPs installed for the permanent control of
stormwater from sediment and compaction. BMPs that are to remain in place following completion
of construction shall be examined and restored to full operating condition. If sediment enters these
BMPs during construction, the sediment shall be removed and the facility shall be returned to
conditions specified in the construction documents.
2.1.12 Element 12: Manage the Project
The project will be managed based on the following principles:
• Construction of the project will be phased to the maximum extent practicable and seasonal
work limitations will be taken into account.
• Inspection and monitoring:
o Inspection, maintenance and repair of all BMPs will occur regularly and as needed to
ensure performance of their intended function.
• Maintain an updated SWPPP.
o As site work progresses the SWPPP will be modified routinely to reflect changing site
conditions. The SWPPP will be reviewed monthly to ensure the content is current.
As site work progresses the SWPPP will be modified routinely to reflect changing site conditions. The
SWPPP will be reviewed monthly to ensure the content is current.
Table 5 – Management
Design the project to fit the existing topography, soils, and drainage patterns
Emphasize erosion control rather than sediment control
Minimize the extent and duration of the area exposed
Keep runoff velocities low
Retain sediment on-site
Thoroughly monitor site and maintain all ESC measures
Schedule major earthwork during the dry season
Other (please describe) SEE BELOW
DRAFT
Page | 26
Because the Project Site is located west of the Cascade Mountain Crest, the Project will be managed
according to the following key project components:
• Phasing of Construction
o The construction project will be phased to the extent practicable in order to prevent
soil erosion, and, to the maximum extent possible, the transport of sediment from the
site during construction; however, the construction schedule will extend through the
wet season.
o Revegetation of exposed areas and maintenance of that vegetation shall be an
integral part of the clearing activities during each phase of construction.
• Seasonal Work Limitations
o Construction is anticipated to occur during the wet season, from October 1 through
April 30. From October 1 through April 30, clearing, grading, and other soil disturbing
activities shall be permitted with the approval of Snohomish County. The Contractor
shall demonstrate that potential for sediment-laden runoff to leave the site is
minimized through a combination of the following:
- Site conditions, including existing vegetative coverage, slope, soil type, and
proximity to receiving waters
- Limitations on activities and the extent of disturbed areas
- Proposed erosion and sediment control measures
o Based on the information provided and/or local weather conditions, Snohomish
County may expand or restrict the seasonal limitation on site disturbance.
2.1.13 Element 13: Protect Low Impact Development BMPs
The proposed project does not include any Low Impact Development BMPs designed to infiltrate
runoff into underlying soils. The project will include the following permanent stormwater control
BMPs:
• A wet biofiltration swale that will treat stormwater runoff from the access road, parking lot,
pathways, and other hard surfaces near the Ranger Residence.
• Sheet flow dispersion areas will receive runoff from the pathways west of the biofiltration
swale.
The sheet flow dispersion areas and biofiltration swale will both be constructed to prevent
sedimentation during construction. These BMPs will be constructed later during construction when
adjacent surfaces have been stabilized. Following construction of these facilities, runoff from adjacent
non-stabilized surfaces will be controlled so that sediment is not transported to these facilities until
permanent storm drainage systems and controls are in place.
DRAFT
Page | 27
3 Pollution Prevention Team
Table 5 – Team Information
Title Name(s) Phone Number
CESCL Placeholder Placeholder
Resident Engineer Placeholder Placeholder
Emergency Ecology Contact Northwest Regional Office, Spill and Emergency Reporting 425-649-7000
Emergency Permittee/
Owner Contact
Placeholder Placeholder
Non-Emergency Owner
Contact
Placeholder Placeholder
Monitoring Personnel Placeholder Placeholder
Ecology Regional Office Northwest Regional Office 425-649-7000
4 Monitoring and Sampling Requirements
Monitoring includes visual inspection, sampling for water quality parameters of concern, and
documentation of the inspection and sampling findings in a site log book. A site log book will be
maintained for all on-site construction activities and will include:
• A record of the implementation of the SWPPP and other permit requirements
• Site inspections
• Stormwater sampling data
A sample form can be found in Appendix D.
The site log book must be maintained on-site within reasonable access to the site and be made
available upon request to Ecology or the local jurisdiction.
4.1 Site Inspection
Site inspections will be conducted at least once every calendar week and within 24 hours following
any discharge from the site. For sites that are temporarily stabilized and inactive, the required
frequency is reduced to once per calendar month.
The discharge point(s) are indicated on the Site Map (see Appendix A).
4.2 Stormwater Quality Sampling
Turbidity and pH sampling shall be performed at all discharge points where stormwater (or
authorized non-stormwater) is discharged from the site to Puget Sound or other off-site location,
before it mixes with the storm drainage system or receiving waters. The Contractor shall identify a
qualified CESCL to provide turbidity and pH monitoring as required by the Construction Stormwater
General Permit (CSWGP). The CESCL shall monitor and report turbidity and pH as indicated in the
CSWGP.
DRAFT
Page | 28
4.2.1 Turbidity Sampling
Requirements may include a calibrated turbidity meter or transparency tube to sample site
discharges for compliance with the CSWGP. Sampling will be conducted at all discharge points at
least once per calendar week, or more frequently if required by the CSWGP.
Method for sampling turbidity:
• Not to exceed 5 Nephelometric Turbidity Units (NTU) over upstream turbidity when
upstream turbidity is 50 NTU or less; and
• Not to exceed 10% above upstream turbidity when upstream turbidity is greater than
50 NTU.
For construction turbidity monitoring, turbidity benchmarks of 25 and 250 NTU are used. It is
presumed that turbidity of 25 NTU or less is not likely to cause an exceedance of state water quality
standards under most conditions, and BMPs are thought to be functioning well. Turbidity readings
above 25 NTU indicate BMPs are not functioning properly, and action must be taken to correct
problems.
If the discharge’s turbidity is 26 to 249 NTU, the following steps will be conducted:
1. The CESCL must immediate notify the Contractor.
2. The Contractor will make all necessary efforts to correct the condition(s) on site that are
causing, or contributing to, the excess turbidity.
3. The CESCL shall review the SWPPP for compliance with Special Condition S9. Make
appropriate revisions to the SWPPP within 7 days of the date the discharge exceeded the
benchmark.
4. The Contractor shall immediately begin the process to fully implement and maintain
appropriate source control and/or treatment BMPs as soon as possible. Address the
problems within 10 days of the date the discharge exceeded the benchmark. If installation of
necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional
time when the Permittee requests an extension within the initial 10-day response period.
5. Document BMP implementation and maintenance in the site log book.
If the turbidity benchmark of 250 NTU is exceeded, there is a much higher risk of exceeding
standards. In this event, immediate corrective actions must be taken, and the Washington State
Department of Ecology (Ecology) must be notified within 24 hours (425-649-7000). If the turbidity
exceeds 250 NTU, the following steps will be conducted:
1. The CESCL must immediately notify the Contractor and appropriate Snohomish County
Clearing and Grading inspector.
2. The Clearing and Grading Inspector will forward the information to the Snohomish County
Clearing and Grading Supervisor, who will telephone or submit an electronic report to the
applicable Ecology Region’s Environmental Report Tracking System within 24 hours.
DRAFT
Page | 29
• Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish, Whatcom):
(425) 649-7000 or
http://www.ecy.wa.gov/programs/spills/forms/nerts_online/NWRO_nerts_online.html
3. The Contractor shall immediately begin the process to fully implement and maintain
appropriate source control and/or treatment BMPs as soon as possible. Address the
problems within 10 days of the date the discharge exceeded the benchmark. If installation of
necessary treatment BMPs is not feasible within 10 days, Ecology may approve additional
time when the Permittee requests an extension within the initial 10-day response period.
4. Document BMP implementation and maintenance in the site log book.
5. The CESCL shall continue to sample discharges daily until one of the following is true:
• Turbidity is 25 NTU (or lower).
• The discharge stops or is eliminated.
4.2.2 pH Sampling
The Contractor shall monitor pH as required by the CSWGP. Monitoring for pH is required for
“Significant concrete work” (i.e., greater than 1,000 cubic yards poured concrete over the life of the
project). The use of recycled concrete or engineered soils (soil amendments including but not limited
to Portland cement-treated base, cement kiln dust or fly ash) also requires pH monitoring.
For significant concrete work, pH sampling will start the first day concrete is poured and continue
until it is cured, typically three (3) weeks after the last pour.
For engineered soils and recycled concrete, pH sampling begins when engineered soils or recycled
concrete are first exposed to precipitation and continues until the area is fully stabilized.
The benchmark value for pH is 8.5 standard units unless otherwise noted in the CSWGP. Values shall
be within the range of 6.5 to 8.5, with a human-caused variation within the above range of less than
0.2 units. Anytime sampling indicates that pH is 8.5 or greater, the high pH water (8.5 or above) must
be prevented from entering the storm drainage system or surface waters, and, if necessary, the high
pH water must be adjusted or neutralized.
If the measured pH is 8.5 or greater, the following measures will be taken:
1. Prevent high pH water from entering storm sewer systems or surface water.
2. Adjust or neutralize the high pH water to the range of 6.5 to 8.5 su using appropriate technology such as CO2 sparging or dry ice.
3. Written approval will be obtained from Ecology prior to the use of chemical treatment other than CO2 sparging or dry ice.
Method for sampling pH:
A pH meter, pH test kit, or Wide range pH indicator paper shall be used to sample pH.
DRAFT
Page | 30
5 Reporting and Record Keeping
5.1 Record Keeping
5.1.1 Site Log Book
A site log book will be maintained for all on-site construction activities and will include:
• A record of the implementation of the SWPPP and other permit requirements
• Site inspections
• Sample logs
5.1.2 Records Retention
Records will be retained during the life of the project and for a minimum of three (3) years following
the termination of permit coverage unless otherwise specified in the CSWGP.
Permit documentation to be retained on-site:
• CSWGP
• Permit Coverage Letter
• SWPPP
• Site Log Book
Permit documentation will be provided within 14 days of receipt of a written request from Ecology. A
copy of the SWPPP or access to the SWPPP will be provided to the public when requested in writing
in accordance with the CSWGP.
5.1.3 Updating the SWPPP
The SWPPP will be modified if:
• Found ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site.
• There is a change in design, construction, operation, or maintenance at the construction site
that has, or could have, a significant effect on the discharge of pollutants to waters of the
State.
The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine
additional or modified BMPs are necessary for compliance. An updated timeline for BMP
implementation will be prepared.
5.2 Reporting
5.2.1 Discharge Monitoring Reports
Cumulative soil disturbance is one (1) acre or larger; therefore, Discharge Monitoring Reports (DMRs)
will be submitted to Ecology monthly. If there was no discharge during a given monitoring period
DRAFT
Page | 31
the DMR will be submitted as required, reporting “No Discharge.” The DMR due date is 15 days
following the end of each calendar month.
DMRs will be reported online through Ecology’s WQWeb DMR System.
5.2.2 Notification of Noncompliance
If any of the terms and conditions of the permit are not met, and the resulting noncompliance may
cause a threat to human health or the environment, the following actions will be taken:
1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable
Regional office Environmental Report Tracking System phone number (Regional office
numbers listed below).
2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or
correct the noncompliance. If applicable, sampling and analysis of any noncompliance will be
repeated immediately and the results submitted to Ecology within five (5) days of becoming
aware of the violation.
3. A detailed written report describing the noncompliance will be submitted to Ecology within
five (5) days, unless requested earlier by Ecology.
Specific information to be included in the noncompliance report is found in the CSWGP.
Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6 cm
or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as required
by Special Condition S5.A of the CSWGP.
• Central Region at (509) 575-2490 for Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan,
or Yakima County
• Eastern Region at (509) 329-3400 for Adams, Asotin, Columbia, Ferry, Franklin, Garfield,
Grant, Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, or Whitman County
• Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit, Snohomish, or
Whatcom County
• Southwest Region at (360) 407-6300 for Clallam, Clark, Cowlitz, Grays Harbor, Jefferson,
Lewis, Mason, Pacific, Pierce, Skamania, Thurston, or Wahkiakum
The following information shall be included:
1. Your name and Phone number
2. Permit number
3. City and County of project
4. Sample results
5. Date and Time of call
6. Date and Time of sample
7. Project name
DRAFT
Page | 32
In accordance with the CSWGP, the Ecology Regional office will be notified if chemical treatment
other than CO2 sparging is planned for adjustment of high pH water.
DRAFT
Page | 33
Appendix A – Site Maps and TESC Drawings
1
2
6
3
4
5
DRAFT
0 200
Feet
LEGEND:
Existing Storm Drain Project Limits Flow Direction
Existing Storm Structure City/County Boundary BNSF ROW
Drainage Area Existing Wetlands
Publish Date: 2018/03/06 4:34 PM | User: jsexton
Filepath: I:\Projects\Snohomish County\Meadowdale Beach Park\Park and Habitat Design\Task 5.2 60% Design\Stormwater\CAD\0723-RP-Figure 2-3 Exist Drainage Facilities(CSWPPP).dwg Figure 2-3
Figure A
Site Map & Existing Drainage Facilities
Stormwater Pollution Prevention Plan
Meadowdale Beach Park Recreation and Habitat Improvements Project
Lund's Gulch Creek
6' x 6' Outlet
Culvert Under
BNSF ROW
Drainage Swale
Ranger Residence
Picnic Shelter Drinking
Fountain
& Drain
Portable
Restroom
Enclosure
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Cover Sheet.dwg G-1G-1
PLAN COVER SHEET 1 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
PERMIT SUBMITTAL
MEADOWDALE BEACH PARK AND ESTUARY DESIGN
SNOHOMISH COUNTY PARKS AND RECREATION
PROJECT SITE
Prime Consultant
Project Manager: Peter Hummel, PLA
Landscape Architect: Betsy Severtsen, PLA
Civil Engineer: David Rice, PE
720 Olive Way
Suite 1900
Seattle WA, 98101
(206) 287-9130
VICINITY MAPSOURCE: ESRI
0
SCALE IN FEET
2000 4000
NORTH
Not to Scale
TACOMA
VANCOUVER
BELLINGHAM
WASHINGTON
EDMONDS
EDMONDS
LYNNWOOD
PUGET
SOUND
SEATTLE
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
COUNTY EXECUTIVE: DAVE SOMERS
DIRECTOR OF PARKS AND RECREATION: TOM TEIGEN
COUNCIL DISTRICT 1: ROB PUTNAM
COUNCIL DISTRICT 2: JULIE LANGABEER
COUNCIL DISTRICT 3: JOHN BRINEY
COUNCIL DISTRICT 4: STEVE YANDL
COUNCIL DISTRICT 5: BOB MCCARTY
SITE ADDRESS: 15433 75TH PLACE WEST EDMONDS, WA 98026
TAX PARCEL NUMBERS: 00500900000500, 27040500200100,
27040500200200
LEGAL DESCRIPTIONS: SEE DRAWING G-3
PROJECT CESCL: TO BE DETERMINED BY CONTRACTOR
Owner
Logan Daniels
Snohomish County Parks and Recreation
6705 Puget Park Drive
Snohomish, WA 89296
(425) 388-6619
logan.daniels@snoco.org
EARTHWORK - APPROXIMATE GRADING QUANTITIES
GRADING LIMIT OF DISTURBANCE: 191,878 SF
CUT: 19,100 CY
FILL: 7,800 CY
SLOPES GREATER THAN 33% WITHIN PROJECT SITE AREA:
6,070 SF (0.14 AC)
DRAWING INDEX
SHT #DWG #TITLE
1 G-1 PLAN COVER SHEET
2 G-2 PLAN COVER SHEET
2a G-3 PLAN COVER SHEET
3 CS-1 COMPOSITE SITE PLAN (1 OF 3)
4 CS-2 COMPOSITE SITE PLAN (2 OF 3)
5 CS-3 COMPOSITE SITE PLAN (3 OF 3)
6 TA-1 TEMPORARY ACCESS AND STAGING PLAN
7 EC-1 EXISTING CONDITIONS PLAN (1 OF 3)
8 EC-2 EXISTING CONDITIONS PLAN (2 OF 3)
9 EC-3 EXISTING CONDITIONS PLAN (3 OF 3)
10 T-1 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (1 OF 3)
11 T-2 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (2 OF 3)
12 T-3 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLAN (3 OF 3)
13 D-1 CLEARING AND DEMOLITION PLAN (1 OF 3)
14 D-2 CLEARING AND DEMOLITION PLAN (2 OF 3)
15 D-3 CLEARING AND DEMOLITION PLAN (3 OF 3)
16 CV-1 LAYOUT CONTROL PLAN (1 OF 3)
17 CV-2 LAYOUT CONTROL PLAN (2 OF 3)
18 CV-3 LAYOUT CONTROL PLAN (3 OF 3)
19 C-1 GRADING PLAN (1 OF 3)
20 C-2 GRADING PLAN (2 OF 3)
21 C-3 GRADING PLAN (3 OF 3)
22 C-4 GRADING CROSS-SECTIONS (1 OF 4)
23 C-5 GRADING CROSS-SECTIONS (2 OF 4)
24 C-6 GRADING CROSS-SECTIONS (3 OF 4)
25 C-7 GRADING CROSS SECTIONS (4 OF 4)
26 CM-1 CONSTRUCTION MATERIALS PLAN (1 OF 3)
27 CM-2 CONSTRUCTION MATERIALS PLAN (2 OF 3)
28 CM-3 CONSTRUCTION MATERIALS PLAN (3 OF 3)
29 CM-4 CONSTRUCTION MATERIAL DETAILS (1 OF 6)
30 CM-5 CONSTRUCTION MATERIAL DETAILS (2 OF 6)
31 CM-6 CONSTRUCTION MATERIAL DETAILS (3 OF 6)
32 CM-7 CONSTRUCTION MATERIAL DETAILS (4 OF 6)
33 CM-8 CONSTRUCTION MATERIAL DETAILS (5 OF 6)
34 CM-9 CONSTRUCTION MATERIAL DETAILS (6 OF 6)
35 RD-1 ROADWAY PLAN AND PROFILE (1 OF 2)
36 RD-2 ROADWAY PLAN AND PROFILE(2 OF 2)
37 RD-3 TYPICAL ACCESS ROADWAY SECTIONS
36 RD-2 ROADWAY PLAN AND PROFILE(2 OF 2)
DRAWING INDEX
SHT #DWG #TITLE
37 RD-3 TYPICAL ACCESS ROADWAY SECTIONS
38 RD-4 TYPICAL PARKING AREA SECTIONS
39 RD-5 ROADWAY AND PARKING AREA DETAILS
40 RD-6 ROADWAY REINFORCEMENT ELEVATIONS AND SECTIONS
41 RD-7 SPIRAL NAIL ROADWAY REINFORCEMENT DETAILS
42 RD-8 PARKING AREA STRIPING PLAN
43 CU-1 UTILITY PLAN (1 OF 2)
44 CU-2 UTILITY PLAN (2 OF 2)
45 CU-3 STORM DRAIN PROFILE
46 CU-4 DRAINAGE DETAILS
47 A1.0 ARCHITECTURAL GENERAL INFORMATION
48 A1.1 ARCHITECTURAL GENERAL NOTES
49 A2.0 PORTABLE TOILET ENCLOSURE FOUNDATION AND FLOOR PLANS
50 A2.1 ROOF PLANS
51 A3.0 PORTABLE TOILET ENCLOSURE ELEVATIONS
52 A3.1 EXISTING PICNIC SHELTER ELEVATIONS
53 A7.0 PORTABLE TOILET ENCLOSURE DETAILS
54 A7.1 PORTABLE TOILET ENCLOSURE ENLARGED ELEVATION, PICNIC SHELTER
COLUMN BASE DETAIL
55 S1.1 GENERAL STRUCTURAL NOTES
56 S1.2 GENERAL STRUCTURAL NOTES
57 S2.1 STRUCTURAL OVERVIEW SITE PLAN
58 S2.2 TOILET ENCLOSURE STRUCTURAL PLANS
59 S2.3 PEDESTRIAN BRIDGE ABUTMENT AND BOARDWALK PLANS
60 S3.1 TOILET ENCLOSURE STRUCTURAL TYPICAL CONCRETE DETAILS
61 S3.2 TOILET ENCLOSURE STRUCTURAL CONCRETE DETAILS
62 S3.3 PEDESTRIAN BRIDGE CONCRETE ABUTMENT DETAILS
63 S3.4 BOARDWALK DETAILS
64 S4.1 TOILET ENCLOSURE DETAILS
65 S-4 PEDESTRIAN BRIDGE DETAIL
66 E-1 ELECTRIC SITE PLAN
67 E-2 ELECTRIC NOTES, DETAILS AND SCHEDULES
68 I-1 IRRIGATION PLAN (1 OF 3)
69 I-2 IRRIGATION PLAN (2 OF 3)
70 I-3 IRRIGATION PLAN (3 OF 3)
71 I-4 IRRIGATION DETAILS
72 L-1 PLANTING PLAN (1 OF 3)
73 L-2 PLANTING PLAN (2 OF 3)
74 L-3 PLANTING PLAN (3 OF 3)
75 L-4 PLANTING DETAILS
MEADOWDALE BEACH PARK
168TH ST SW
164TH ST SW
INTERSTATE 575TH PL WN MEADOWDALE ROAD
Architectural Consultant
Salt Studio LLC
66 Bell Street Unit #1
Seattle, WA 98121
(206) 948-2104
Surveyor
Duane Hartman and Associates
16928 Woodinville-Redmond Road, Suite B-107
Woodinville, WA 98072
(425) 483-5355
Structural Engineering Consultant
Swenson Say Faget
2124 Third Ave, Suite 100
Seattle, WA 98121
(206) 443-6212
Mechanical Engineering Consultant
Rainbow Consulting
336 NW 50th St
Seattle, WA 98107
(206) 235-6002
Irrigation Consultant
William Stewart Design
9220 58th Avenue SE
Olympia, WA 98513
(206) 605-9863
Electrical Engineering Consultant
Cross Engineers
923 Martin Luther King Jr. Way
Tacoma, WA 98405
(253) 759-0118
Activity Snohomish County City of Edmonds Total
New impervious surfaces 3,964 666 4,630
Replaced impervious surfaces 17,103 26,584 43,687
Removed impervious surfaces -6,562 -2,839 -9,401
Net Change Total -2,598 -2,173 -4,771
BNSF RAILWAYPUGET
SOUND
LUND
S
CREEK
GUL
C
H
LUNDS
G
U
L
C
H
CREEK
OFF-CHANNELPOND
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Site Context and Layout Plan.dwg 2 G-20
SCALE IN FEET
80 160
NORTH
X-1
X-2
X-3
PUGET SOUND
LEGEND:
PROJECT BOUNDARY
CITY OF EDMONDS/SNOHOMISH COUNTY
BOUNDARY
PARK BOUNDARY
PARCEL BOUNDARY
BNSF RIGHT-OF-WAY
BNSF CENTERLINE
EXISTING OHWM
EXISTING MHHW (EL. +9.0' MLLW)
EXISTING LUND GULCH CREEK THALWEG
EXISTING WETLAND TO BE PROTECTED
75TH PL W.G-2
PLAN COVER SHEET 2 75
PH/BS
CH/TG
BS
PH
1" = 80'
NOVEMBER 2018
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
RANGER RESIDENCE
Nov 16, 2018 3:30pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Cover Sheet.dwg 2a G-3G-3
PLAN COVER SHEET 2A 75
PH/BS
CH/TG
BS
PH
AS NOTED
NOVEMBER 2018
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
STATE OFWASHINGTON
LICENSEDLANDSCAPE ARCHITECT
CERTIFICATE NO. 422
PETER C. HUMMEL
GENERAL NOTES:
1.ALL EMPLOYEES MUST COMPLY WITH BNSF SAFETY REQUIREMENTS. THIS INCLUDES, BUT IS NOT LIMITED TO, PASSING A
SAFETY COURSE, OBTAINING DOCUMENTATION OF SUCCESSFULLY PASSING THE COURSE, AND ADHERING TO
REQUIREMENTS IDENTIFIED IN THE COURSE. THE REQUIRED BNSF SAFETY COURSE MAY BE ACCESSED AT THE FOLLOWING
WEBSITE: WWW.RAILROADCOURSES.COM.
2.A BNSF FLAGGER SHALL BE PRESENT ANY TIME THE CONTRACTOR IS WORKING WITHIN 25 FEET OF THE TRACKS. THE
CONTRACTOR SHALL COMMUNICATE WITH THE OWNER TO ARRANGE FOR A FLAGGER TO BE PRESENT DURING THESE
TIMES.
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR. SOME INFORMATION WILL BE LOST WITH BLACK AND WHITE VIEWING.
SURVEY NOTES:
1.SURVEY BY DUANE HARTMAN & ASSOCIATES, INC IN 2017.
2.HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE NAD83(91), U.S. FEET UTILIZING RTK GPS
FIELD PROCEDURES
3.VERTICAL DATUM: TO CONVERT ELEVATIONS SHOWN HEREON TO MEAN LOWER LOW WATER DATUM PLEASE ADD 2.05
FEET.
4.UTILITIES MAPPING: ALL EXISTING UTILITIES SHOWN HEREIN ARE TO BE VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO
ANY CONSTRUCTION. ALL EXISTING FEATURES INCLUDING BURIED UTILITIES ARE SHOWN AS INDICATED BY RECORD
LOCATION OR FIELD TIED AS A RESULT OF A UTILITY PAINT-OUT DURING THE COURSE OF THE FIELD SURVEY. DUANE
HARTMAN & ASSOCIATES, INC. (DHA) ASSUMES NO LIABILITY FOR THE ACCURACY OF THE RECORD INFORMATION. FOR THE
FINAL LOCATION OF THE EXISTING UTILITIES IN AREAS CRITICAL TO CONSTRUCTION, CONTACT THE UTILITY
OWNER/AGENCY AND UTILITIES UNDERGROUND CENTER (800/424-5555).
5.TOPOGRAPHIC MAPPING: THE MAP SHOWN HEREON IS THE RESULT OF A TOPOGRAPHIC SURVEY BY DUANE HARTMAN &
ASSOCIATES, INC. (DHA) COMPLETED ON OCTOBER 2016. DHA ASSUMES NO LIABILITY, BEYOND SAID DATE, FOR ANY
FUTURE SURFACE FEATURE MODIFICATIONS OR CONSTRUCTION ACTIVITIES THAT MAY OCCUR WITHIN OR ADJOINING THE
PERIMETER OF THIS SURVEY. CONTACT DHA (425) 483-5355 FOR SITE UPDATES AND VERIFICATIONS.
6.RAILROAD RIGHT OF WAY LINES: THE BNSF RAILWAY RIGHT OF WAY LINES SHOWN HEREON HAVE BEEN CALCULATED USING
TRACK STATIONING, RAILROAD GEOMETRY AND CADASTRAL CALL OUTS AS SHOWN ON "BNSF RAILWAY RIGHT OF WAY".
LEGAL DESCRIPTION:
DETAIL AND SECTION REFERENCING:
DETAIL REFERENCE NUMBER
DRAWING ON WHICH DETAIL APPEARS
"-" INDICATES TYPICAL OR ON SAME DRAWING
DETAIL REFERENCE NUMBER
SECTION "A" IS SHOWN ON DRAWING "C-2"
INDICATES DIRECTION
OF CUTTING PLAN
SECTION REFERENCE NUMBER
1
C-1
SCALE:
DETAIL1
-1" = 10'
A
C-2
SCALE:
SECTIONA
-1" = 10'
GENERAL CONSTRUCTION NOTES:
1.UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR IN THE SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE ACCOMPLISHED
IN ACCORDANCE WITH THE CURRENT SNOHOMISH COUNTY ENGINEERING DESIGN AND DEVELOPMENT STANDARDS, THE CITY OF EDMONDS
COMMUNITY DEVELOPMENT CODE, THE SNOHOMISH COUNTY DRAINAGE MANUAL, THE CITY OF EDMONDS STORMWATER MANAGEMENT
CODE, THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION), AND OTHER
APPLICABLE CODES AND STANDARDS.
2.THE CONTRACTOR SHALL HAVE COPIES OF THE APPROVED DRAWINGS, APPLICABLE SNOHOMISH COUNTY AND CITY OF EDMONDS STANDARDS,
AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION) ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
3.THE CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO CONSTRUCTION AND SHALL BE RESPONSIBLE FOR VERIFYING FIELD CONDITIONS AND
DIMENSIONS, AND CONFIRMING THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON THESE DRAWINGS. ANY DISCREPANCIES BETWEEN
THE EXISTING FIELD CONDITIONS AND THE DRAWINGS OR ANY INCONSISTENCIES OR AMBIGUITIES BETWEEN THE DRAWINGS AND OTHER
CONTRACT DOCUMENTS SHALL BE REPORTED IN WRITING TO THE OWNER (SNOHOMISH COUNTY) PRIOR TO PROCEEDING WITH THE WORK.
WORK DONE BY THE CONTRACTOR INVOLVING SUCH DISCREPANCIES WITHOUT A WRITTEN REPORT AND RESPONSE FROM THE OWNER SHALL
BE DONE AT THE CONTRACTOR'S SOLE RISK AND EXPENSE.
4.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION,
INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND IS NOT LIMITED TO NORMAL
WORKING HOURS.
5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND
ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH
THE PERFORMANCE OF WORK COVERED BY THE CONTRACT.
6.THE CONTRACTOR SHALL PROVIDE TEMPORARY CUT SLOPES AND SHORING AS NECESSARY FOR THE CONSTRUCTION AS SHOWN ON THESE
DRAWINGS. THE STABILITY OF ALL TEMPORARY SLOPES AND SHORING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
7.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES
AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THIS CONTRACT.
8.THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO PROTECT EXISTING STRUCTURES, SIGNS, FENCES, GATES, CURBS, ROADWAYS,
DRAINAGE WAYS, CULVERTS, VEGETATION, AND OTHER IMPROVEMENTS UNLESS AND UNTIL SUCH ITEMS ARE TO BE DISTURBED OR REMOVED
AS INDICATED ON THE DRAWINGS. IF SUCH ITEMS ARE DAMAGED OR NEED TO BE REMOVED OR MODIFIED TO FACILITATE CONSTRUCTION, THE
CONTRACTOR SHALL FIRST NOTIFY SNOHOMISH COUNTY AND THEN REPLACE OR REPAIR THE ITEMS TO EQUAL OR BETTER CONDITION TO THE
SATISFACTION OF SNOHOMISH COUNTY.
9.THE CONTRACTOR SHALL NOT DISTURB OR DESTROY ANY EXISTING SURVEY MONUMENT OR BENCHMARK. ANY SURVEY MONUMENT OR
BENCHMARK DISTURBED OR DESTROYED BY THE CONTRACTOR SHALL BE REPLACED AS DIRECTED BY SNOHOMISH COUNTY AT THE
CONTRACTOR'S SOLE EXPENSE.
10.THE CONTRACTOR SHALL MAINTAIN CONTINUOUS ACCESS TO THE RANGER RESIDENCE THROUGHOUT CONSTRUCTION OF THE PROJECT. ANY
TEMPORARY DISRUPTION OF ACCESS TO THE RANGER RESIDENCE SHALL BE AND APPROVED BY SNOHOMISH COUNTY.
11.WHERE A CONSTRUCTION DETAIL IS NOT SHOWN OR NOTED, THE DETAIL SHALL BE THE SAME AS FOR OTHER SIMILAR WORK.
12.THE DETAILS AND NOTES PROVIDED ON THE DRAWINGS AND IN THE SPECIFICATIONS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES.
13.DIMENSION CALL-OUTS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON THE CONTRACT DOCUMENTS.
14.ALL MATERIALS SHALL BE NEW AND UNDAMAGED, UNLESS OTHERWISE APPROVED BY SNOHOMISH COUNTY AND THE ENGINEER. THE SAME
MANUFACTURER OF EACH ITEM SHALL BE USED THROUGHOUT THE WORK UNLESS OTHERWISE APPROVED BY SNOHOMISH COUNTY AND THE
ENGINEER.
15.RUBBISH, DEBRIS, AND GARBAGE SHALL BE REMOVED FROM THE JOB SITE AND DISPOSED OF LEGALLY, AS ALLOWED BY THE SNOHOMISH
COUNTY ENGINEERING DESIGN AND DEVELOPMENT STANDARDS AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND
MUNICIPAL CONSTRUCTION (CURRENT EDITION).
16.THE CONTRACTOR SHALL MAINTAIN HAND DRAWN REDLINES, FIELD NOTES AND PHOTOGRAPHS ("FIELD DOCUMENTATION") OF ALL
IMPROVEMENTS AS THE WORK PROGRESSES, AS REQUIRED BY THE SPECIFICATIONS. THE CONTRACTOR SHALL ALSO TAKE PHOTOGRAPHS AND
VIDEO TO DOCUMENT CONDITIONS PRIOR TO CONSTRUCTION. THE CONTRACTOR'S FIELD DOCUMENTATION SHALL BE MAINTAINED ON SITE
AND SHALL BE AVAILABLE FOR REVIEW BY SNOHOMISH COUNTY AND THE ENGINEER AT ALL TIMES.
EXISTING UTILITY NOTES:
1.THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND ARE BASED ON SURVEYED UTILITY MARKINGS
AND FEATURES VISIBLE AT THE SURFACE, SUPPLEMENTED BY AS-BUILT INFORMATION PROVIDED BY SNOHOMISH COUNTY.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING ALL UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL CALL THE
UTILITY LOCATION REQUEST CENTER (ONE-CALL CENTER) AT 811 OR 1-800-424-5555 FOR UTILITY LOCATIONS NOT LESS THAN TWO (2) BUSINESS
DAYS BEFORE THE SCHEDULED DATE FOR TRENCHING OR EARTHWORK THAT MAY IMPACT EXISTING UTILITIES.
3.THE SIZE, LOCATION, AND TYPE OF UNDERGROUND UTILITIES EXPOSED OR MODIFIED BY THE CONTRACTOR SHALL BE ACCURATELY NOTED AND
PLACED ON THE CONTRACTOR'S RECORD DRAWINGS.
4.THE CONDITION OF ALL ABANDONED UTILITIES THAT INTERFERE WITH EXECUTION OF THE WORK SHALL BE VERIFIED BY THE UTILITY OWNER
PRIOR TO DISTURBANCE OR MODIFICATION. THE CONTRACTOR MAY ONLY TAKE ACTION AFTER WRITTEN APPROVAL HAS BEEN RECEIVED FROM
THE UTILITY OWNER BY THE SNOHOMISH COUNTY.
5.THE CONTRACTOR SHALL ENSURE THAT OPERATIONS OF EXISTING SEWER, WATER, POWER, TELECOMMUNICATIONS, AND OTHER UTILITY
SYSTEMS SERVING THE RANGER RESIDENCE ARE NOT DISRUPTED DURING CONSTRUCTION WITHOUT PRIOR AUTHORIZATION OF THE
SNOHOMISH COUNTY.
2704050020010027040500200100
00500900000500
00500900001602
00500900001601
BNSF RAILWAYPUGET
SOUND
LUN
D
S CREEKGUL
C
H
100' BNSF ROW
PICNIC SHELTER
VOLLEYBALL
COURT
ASPHALTPATH
CONCRETE CULVERT, SLABS,GRATING, AND CHANNEL MATERIALS
CRUSHED ROCK PATH
RESTROOM ENCLOSURE,FOUNDATION,AND CONC. SLAB
EXISTING PEDESTRIANLIGHT WITH SECONDARYUNDERGROUND POWER
CONC. PAD, PICNIC
TABLE, GRILL
EXTENT OF TOPOGRAPHIC SURVEY
EXTENT OF TOPOGRAPHIC SURVEY
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXISTING BEACHTOPOGRAPHY (SEE NOTE 5)
EXISTINGINFORMAL TRAILTO GAP IN FENCE
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:32pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 7 EC-10
SCALE IN FEET
30 60
LEGEND:
NORTH
EC-1
EXISTING CONDTIONS PLAN (1 OF 3)7 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
MATCH LINE, SEE SHEET EC-2NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
5.BEACH TOPOGRAPHY REPRESENTS JUNE 2016
CONDITIONS AND ARE SUBJECT TO CHANGE.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING
GRADES AND BEACH CONDITIONS PRIOR TO
GRADING.
CONFIRMED LOCATIONS
OF BURIED DEBRIS
27040500200100
00500900000500
00500900000500
00500900001602 27040500200100
LUN
D
S CREEKGUL
C
H
LUN
D
S
G
U
L
C
H
CREE
K
OFF-CHANNEL
POND
RANGERRESIDENCE
ASPHALTPARKING LOT
ASPHALTROAD
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXTENT OF TOPOGRAPHIC SURVEY
EXTENT OF TOPOGRAPHIC SURVEY
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:32pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 8 EC-2LEGEND:
APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
EC-2
EXISTING CONDITIONS PLAN (2 OF 3)8 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
0
SCALE IN FEET
30 60
NORTHMATCH LINE, SEE SHEET EC-1MATCH LINE, SEE SHEET EC-3
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
00500900000500
00500900000100
ACCESS GATE
CONTOURS FROM LIDAR
CONTOURS FROM LIDAR
EXTENT OF TOPOGRAPHIC SURVEY
EX. 1-1/2" WATER METER, TO PARK
SANITARY SEWER MANHOLE
JUNCTION BOX
WATER METER
ROCKERY
STORM DRAIN CATCH BASIN(TYPE I)
MONUMENT IN CASE
CONIFER
DECIDUOUS
SIGN
EDGE OF ASPHALT
PLAT CENTERLINE
BNSF RIGHT OF WAY
PLAT LOT LINE
UNDERGROUND STORM LINE
UNDERGROUND SEWER GRAVITY LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND WATER LINE
UNDERGROUND POWER LINE
FENCING
PVC
CONC
P.A.
POLYVINYL CHLORIDE PIPE
ABBREVIATIONS:
PLANTED AREA
CONCRETE
YARD LIGHT
POWER VAULT
TREES:
C CEDAR
P
F
PINE
FIR
DEC DECIDUOUS
HEM HEMLOCK
DHA SURVEY CONTROL
YARD DRAIN
BOLLARD
(A)APPROXIMATE
PRD PER RECORD DRAWING
CTN
A
COTTONWOOD
ALDER
ORN ORNAMENTAL
B BIRCH
WETLAND/ ORDINARY HIGH WATER FLAG
WP WOOD POST
SANITARY/ STORM CLEAN-OUT
M MAPLE
GRAVEL PATH
LOG DEBRIS
UNDERGROUND SEWER FORCEMAIN LINE
PICNIC TABLE x 13
MONITOR WELL
RD ROOF DRAIN
CO CLEAN-OUT
CREEK TOP
CREEK TOE
RAILROAD SIGNAL
PARK BOUNDARY LINE
ORDINARY HIGH WATER MARK
WETLAND BOUNDARY
BNSF CENTERLINE
MEAN HIGHER HIGH WATER (EL. +9.0' MLLW)
PARK BOUNDARY
PROJECT BOUNDARY
Nov 16, 2018 3:33pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-Existing Plan.dwg 9 EC-3LEGEND:
75TH PL W.75TH PL W.APPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
EC-3
EXISTING CONDITIONS PLAN (3 OF 3)9 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
0
SCALE IN FEET
30 60
NORTH
MATCH LINE, SEE SHEET EC-2
NOTES:
1.SURVEY PROVIDED BY DHA, DATED JUNE 2017
16928 WOODINVILLE-REDMOND ROAD
SUITE B-107
WOODINVILLE, WASHINGTON 98072
(425) 483-5355
2.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
3.VERTICAL DATUM: NAVD 88
4.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
BNSF RAILWAYPUGET
SOUND
LUN
D
S CREEKGUL
C
H
510467891112121
2 121
010 888992522 2324 2627152013141
6
17181915 2
0
2
5
11
12
1314 1617181818
192
1
21
21
2222
23242626
15152025121213131414
16 1617171
8 1921222324242426152
0
25131314161718181819
212223 24
2
6
2
7
2
8101010101010151520202020677788899
9 1111121213131414161617171818191921211
5
2011
1111
12
12
12
131
4
1
414
1616161616 17
1818181818 191919
212223242
4
2
5 2610
9
12
13
14
17
18
2012
13
1415
16
17
20
11
10
9
9
1
0 1112131415212122
15
2311
22251
9
16
262127242818 19
242322
1213111415161718192010
9
11
81098769
109101188 927282920191817
16
15
14
13
1211
TCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCTCIN-WATER TURBITY
CURTAIN, EXTEND CURTAIN
TO OUTER LIMITS OF WORK
AS REQUIRED BY PERMIT
1
-
TEMPORARY
DIVERSION PIPE
PLACE SILT FENCE AT
CLEARING LIMITS
C233
PLACE SILT FENCE AT
CLEARING LIMITS
C233
PLACE SILT FENCE AT
CLEARING LIMITS
C233
PLACE SILT FENCE AT
CLEARING LIMITS
C233
MARK CLEARING
LIMITS C103
MARK CLEARING
LIMITS C103C103
INTALL BULK-BAG
COFFERDAM FOR
TEMPORARY DIVERSION
STOCKPILE AREA
EX RESTROOM ENCLOSURE,FOUNDATION,AND CONC. SLAB
EX VOLLEYBALLCOURT
EX ASPHALT
PATH
CONCRETE CULVERT, SLABS,GRATING, AND CHANNEL MATERIALS
EX CRUSHED ROCK PATH
CONC. PAD, PICNIC
TABLE, GRILL
EX PICNIC SHELTER
LEGEND, TESC
CLEARING LIMITS
SILT FENCE
BULK BAG COFFERDAM
STABILIZED ROCK CONSTRUCTION ENTRANCE
IN-WATER TURBIDITY CURTAIN
SNOHOMISH COUNTY BMP NUMBER (SEE TABLE)
CATCH BASIN INLET PROTECTION
STAGING AND STOCKPILE AREA
EXISTING WETLAND TO BE PROTECTEDTCTC
C103
1
T-1
Nov 16, 2018 3:33pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-TESC.dwg 10 T-140265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
0
SCALE IN FEET
30 60
NORTH
BMP DESCRIPTION
C103 HIGH VISIBILITY PLASTIC OR METAL FENCE
C105 STABILIZED CONSTRUCTION ENTRANCE
C220 STORM DRAIN INLET PROTECTION
C233 SILT FENCE
STANDARD TESC DETAILS LEGEND:
THE FOLLOWING ARE STANDARD SNOHOMISH COUNTY
TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) BEST
MANAGEMENT PRACTICE (BMP) DETAILS:
T-1
TEMPORARY EROSION AND SEDIMENT CONTROL
(TESC) PLAN (1 OF 3)10 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE
PLANE NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN
COLOR. SOME INFORMATION WILL BE LOST
WITH BLACK AND WHITE VIEWING.
4.SEE DRAWING T-3 FOR TESC NOTES AND
ADDITIONAL REQUIREMENTS.
POCKET
BALLAST
IMPERVIOUSTURBIDITYCURTAINFLOATATION
SEE NOTESNOTES:
1.AROUND PILE DRIVING AREAS AND EXISTING
PILE REMOVAL AREAS, LENGTH OF CURTAIN
SHALL EXTEND TO MUDLINE FOR ALL TIDELEVELS.
2.ALL OTHER AREAS, WHERE DEBRIS FROM
DEMOLITION WORK MAY EXIST, LENGTH OF
CURTAIN SHALL BE 6 FEET.
3.THE CONTRACTOR SHALL BE RESPONSIBLE
FOR MAINTAINING THE TURBIDITY CURTAIN TO
MAINTAIN FUNCTIONALITY OF THE TURBIDITY
CURTAIN THROUGHOUT ALL TIDAL CONDITIONSAND WEATHER EXPECTED DURING THECONSTRUCTION PERIOD, AS REQUIRED BY THE
APPROVED PROJECT PERMITS.
4.SEE SPECIFICATIONS FOR MATERIALREQUIREMENTS.
SCALE:
IN-WATER TURBIDITY CURTAIN1
T-1 NOT TO SCALE
MATCH LINE, SEE SHEET T-2BNSF RIGHT OF WAY
LUN
D
S CREEKGUL
C
H
LUN
D
S
G
U
L
C
H
CREE
K
OFF-CHANNEL
POND
252627283540
45
50
36 3738 39 414243
44
46
47
48
49
5560657075808590951001051105
2535456575859616263646667686971727374
76777879818283848687888991929394969798991011021031041061071081091111121133531
31
32
323232
33
3334
34
362
5 3035
242626 2627 28
2
9
31
32
3
3
3
4
36
253024242426272829313233
25 303
5
35
35404550
2
6 2
7
28 293132333434343637 3839 414243444647
48
49
51
25
303535354022232426
27
2727
28
2
828
292929
31 32 33343636363737
3738
39 412650454025262730292831323334353639383736
556065703527282930313233343535
34
STABILIZED ROCK CONSTRUCTION
ENTRANCE, TO BE INSTALLED PRIOR
TO REMOVAL OR FOLLOWING
PLACEMENT OF PAVEMENT AT
PARKING AREA AND DRIVEWAY
STABILIZED ROCK CONSTRUCTION
ENTRANCE, TO BE INSTALLED WHEN
DRIVEWAY PAVEMENT IS REMOVED
INSTALL FISH EXCLUSION
NETTING UPSTREAM OF
WORK AREA
C105
C105
PLACE SILT FENCE
AT CLEARING LIMITS
C233
PLACE SILT FENCE AT
CLEARING LIMITSC233
CATCH BASIN
INLET PROTECTION C220
MARK CLEARING
LIMITS C103
PLACE SILT FENCE AT
CLEARING LIMITS
PLACE SILT FENCE AT
CLEARING LIMITS
C233
C233
MARK CLEARING
LIMITS C103
MARK CLEARING
LIMITS C103
SOIL NAIL/ROADWAY
STABILIZATION AREA
STOCKPILE AREA EX RANGERRESIDENCE
EX ASPHALTPARKING LOT
EX ASPHALT
ROAD
LEGEND, TESC
CLEARING LIMITS
SILT FENCE
BULK BAG COFFERDAM
STABILIZED ROCK CONSTRUCTION ENTRANCE
IN-WATER TURBIDITY CURTAIN
SNOHOMISH COUNTY BMP NUMBER (SEE TABLE)
CATCH BASIN INLET PROTECTION
STAGING AND STOCKPILE AREA
EXISTING WETLAND TO BE PROTECTEDTCTC
C103
1
T-1
Nov 16, 2018 3:33pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-TESC.dwg 11 T-240265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
T-2
TEMPORARY EROSION AND SEDIMENT CONTROL
(TESC) PLAN (2 OF 3)11 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018MATCH LINE, SEE SHEET T-1MATCH LINE, SEE SHEET T-3
0
SCALE IN FEET
30 60
NORTH
BMP DESCRIPTION
C103 HIGH VISIBILITY PLASTIC OR METAL FENCE
C105 STABILIZED CONSTRUCTION ENTRANCE
C220 STORM DRAIN INLET PROTECTION
C233 SILT FENCE
STANDARD TESC DETAILS LEGEND:
THE FOLLOWING ARE STANDARD SNOHOMISH COUNTYTEMPORARY EROSION AND SEDIMENT CONTROL (TESC) BESTMANAGEMENT PRACTICE (BMP) DETAILS:
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE PLANE
NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR.
SOME INFORMATION WILL BE LOST WITH BLACK AND
WHITE VIEWING.
4.PATHWAY WIDENING TO 10 FEET REQUIRES WORK ON
ADJACENT PROPERTY. OBTAINING AN EASEMENT FOR
THIS WORK IS UNDERWAY AND WILL BE COMPLETED
PRIOR TO CONSTRUCTION START DATE.
5.CONTRACTOR SHALL PROVIDE CONTINUOUS UTILITY
SERVICE AND DRIVEWAY ACCESS TO RANGER RESIDENCE.
6.SEE DRAWING T-3 FOR TESC NOTES AND ADDITIONAL
REQUIREMENTS.
00500900000500
00500900000100859095100105110
115 115120 12
0
125125130818283848687888991929394969798991011021031041061071081091
1
1 111112 112113 113114114116116117117118118119119121 121122 122123124124126126127127128128129129PLACE SILT FENCE AT
CLEARING LIMITS
C233
C103
MARK CLEARING
LIMITS
SOIL NAIL/ROADWAY
STABILIZATION AREA
SOIL NAIL/ROADWAY
STABILIZATION AREA
C103
EX ASPHALTROAD
ACCESS GATE
LEGEND, TESC
CLEARING LIMITS
SILT FENCE
BULK BAG COFFERDAM
STABILIZED ROCK CONSTRUCTION ENTRANCE
IN-WATER TURBIDITY CURTAIN
SNOHOMISH COUNTY BMP NUMBER (SEE TABLE)
CATCH BASIN INLET PROTECTION
STAGING AND STOCKPILE AREATCTC
C103
1
T-1
GENERAL TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) NOTES:
1.ALL CLEARING AND GRADING CONSTRUCTION MUST BE IN ACCORDANCE WITH THE
SNOHOMISH COUNTY ENGINEERING DESIGN AND DEVELOPMENT STANDARDS, THE
SNOHOMISH COUNTY DRAINAGE MANUAL, THE CITY OF EDMONDS COMMUNITY
DEVELOPMENT CODE, THE CITY OF EDMONDS DRAINAGE ADDENDUM, AND OTHER
APPLICABLE STANDARDS, CODES, AND ORDINANCES. ANY VARIANCE FROM
ADOPTED EROSION CONTROL STANDARDS IS NOT ALLOWED UNLESS SPECIFICALLY
APPROVED BY SNOHOMISH COUNTY.
2.THE CONTRACTOR SHALL PROVIDE A CERTIFIED EROSION AND SEDIMENT CONTROL
LEAD (CESCL) TO MANAGE AND MAINTAIN TEMPORARY EROSION AND SEDIMENT
CONTROL FOR THE PROJECT. THE NAMED PERSON OR FIRM SHALL BE ON-SITE OR
ON-CALL AT ALL TIMES.
3.THE IMPLEMENTATION OF THESE TESC DRAWINGS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE
RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED
AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.
4.THE CLEARING AND DISTURBANCE LIMITS SHALL BE CLEARLY MARKED IN THE FIELD
PRIOR TO CLEARING AND GRADING. WHERE SILT FENCE IS NOT SPECIFIED AT THE
CLEARING AND DISTURBANCE LIMITS, THE CONTRACTOR SHALL INSTALL
HIGH-VISIBILITY FENCING OR FLAGGING TO CLEARLY MARK THE CLEARING AND
DISTURBANCE LIMITS. FENCES SHALL BE MAINTAINED BY THE CONTRACTOR FOR
THE DURATION OF CONSTRUCTION.
5.THE TESC FACILITIES SHOWN ON THESE DRAWINGS MUST BE CONSTRUCTED IN
CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A
MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT
ENTER SURFACE WATER BODIES, INCLUDING LUND'S GULCH CREEK OR PUGET
SOUND.
6.THE TESC FACILITIES SHOWN ON THESE DRAWINGS ARE THE MINIMUM
REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING CONSTRUCTION,
THESE TESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM
EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT
LEAVE THE SITE.
7.THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND
MAINTAINED, REPAIRED, OR AUGMENTED AS NECESSARY TO ENSURE THEIR
CONTINUED FUNCTIONING.
8.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE
KEPT CLEAN FOR THE DURATION OF THE PROJECT.
9.FROM OCTOBER 1 THROUGH APRIL 30, NO SOILS SHALL REMAIN EXPOSED AND
UNWORKED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS
SHALL REMAIN EXPOSED AND UNWORKED FOR MORE THAN 7 DAYS. SOILS SHALL BE
STABILIZED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND IF NEEDED
BASED ON THE WEATHER FORECAST. THESE STABILIZATION REQUIREMENTS APPLY
TO ALL SOILS ON SITE, WHETHER AT FINAL GRADE OR NOT.
10.SOIL AND OTHER STOCKPILES MUST BE STABILIZED AND PROTECTED WITH
SEDIMENT-TRAPPING MEASURES.
11.ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THAT
OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN
A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER.
12.MAINTENANCE AND REPAIR OF HEAVY EQUIPMENT AND VEHICLES AND OTHER
ACTIVITIES WHICH MAY RESULT IN DISCHARGE OR SPILLAGE OF POLLUTANTS TO THE
GROUND OR INTO STORMWATER RUNOFF MUST BE CONDUCTED USING SPILL
PREVENTION MEASURES APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE. REPORT ALL SPILLS TO CESCL LEAD AND DOE NW REGION:
425-649-7000.
13.WATER FROM MOST DEWATERING OPERATIONS SHALL BE DISPERSED IN AN
ADJACENT OPEN SPACE, AS APPROVED BY THE OWNER'S REPRESENTATIVE. THE
CONTRACTOR SHALL PROTECT PRIVATE PROPERTY FROM SCOUR AND EROSION
RESULTING FROM DEWATERING OPERATIONS. HIGHLY TURBID OR CONTAMINATED
DEWATERING WATER SHALL BE HANDLED SEPARATELY FROM STORMWATER AND
PROPERLY DISPOSED.
14.THE CONTRACTOR SHALL PRESERVE NATURAL LANDSCAPE, AND PRESERVE AND
PROTECT EXISTING VEGETATION NOT REQUIRED OR OTHERWISE AUTHORIZED TO BE
REMOVED, AS OUTLINED IN THE SPECIFICATIONS.
15.THE CONTRACTOR SHALL REPAIR OR TREAT INJURED TREES AND VEGETATION AS
REQUIRED BY THE SPECIFICATIONS.
16.THE CONTRACTOR SHALL REMOVE AND DISPOSE OF TREES AND VEGETATION THAT
ARE INJURED OR DAMAGED BEYOND SAVING AND NOT REQUIRED OR OTHERWISE
AUTHORIZED FOR REMOVAL AS REQUIRED IN THE SPECIFICATIONS. REPLACE THE
INJURED TREE OR SHRUB AS DIRECTED BY THE OWNER.
PROJECT SPECIFIC TESC NOTES:
1.THE TESC PLAN DRAWINGS SHOWN ARE CONCEPTUAL. THE CONTRACTOR IS
REQUIRED TO SUBMIT DETAILED TESC PLANS AND ANY SUGGESTED REVISIONS TO
THE APPROVED CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
(SWPPP) TO SNOHOMISH COUNTY FOR APPROVAL.
2.THE CONTRACTOR IS RESPONSIBLE FOR THE CARE AND DIVERSION OF WATER
DURING CONSTRUCTION IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
WATER QUALITY STANDARDS AND PROJECT PERMIT REQUIREMENTS.
3.THE CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PRECAUTIONS BE TAKEN TO
PREVENT ANY CEMENT CONCRETE OR BY-PRODUCTS, ASPHALT CONCRETE OR
BYPRODUCTS, OR ANY DISCHARGE FROM SAW CUTTING AND PLANING FROM BEING
DISCHARGED INTO LUND'S GULCH CREEK, PUGET SOUND, OR ANY SURFACE WATER
SYSTEM.
4.TESC IMPLEMENTATION AND MAINTENANCE SHALL COMPLY WITH ALL PROJECT
PERMIT REQUIREMENTS.
5.THE CONTRACTOR SHALL NOT FUEL EQUIPMENT OR STORE FUEL AT ELEVATIONS
LOWER THAN 5 FEET ABOVE THE ORDINARY HIGH WATER (OHW) OF THE NEAREST
STREAM OR SURFACE WATER BODY.
6.WASHING OF EQUIPMENT ON THE PROJECT SITE SHALL NOT BE ALLOWED UNLESS
AUTHORIZED IN WRITING BY THE CONTRACTING OFFICER.
7.THE CONTRACTOR SHALL PROVIDE, OPERATE, AND MAINTAIN EQUIPMENT NEEDED
TO DIVERT AND BYPASS LUNDS GULCH CREEK FLOWS THROUGH THE SITE DURING
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY
DIVERSION AND CONTROL OF THE FULL RANGE OF FLOWS THAT CAN BE EXPECTED
DURING CONSTRUCTION. PEAK FLOWS ESTIMATED IN LUNDS GULCH CREEK
THROUGH THE PROJECT SITE ARE AS FOLLOWS:
·Q (2-YEAR) = 57 CFS
·Q (5-YEAR) = 89 CFS
·Q (25-YEAR) = 106 CFS
·Q (100-YEAR) = 135 CFS
Nov 16, 2018 3:34pm chewett k:\Projects\0723-snohomish county\meadowdale park\construction plans\0723-PL-TESC.dwg 12 T-3ACCES
S
R
O
A
D
75TH PL W.T-3
TEMPORARY EROSION AND SEDIMENT CONTROL
(TESC) PLAN (3 OF 3)12 75
PH/BS
CH/TG
BS
PH
1" = 30'
NOVEMBER 2018
MATCH LINE, SEE SHEET T-2
0
SCALE IN FEET
30 60
NORTH
BMP DESCRIPTION
C103 HIGH VISIBILITY PLASTIC OR METAL FENCE
C105 STABILIZED CONSTRUCTION ENTRANCE
C220 STORM DRAIN INLET PROTECTION
C233 SILT FENCE
STANDARD TESC DETAILS LEGEND:
THE FOLLOWING ARE APPLICABLE STANDARD SNOHOMISHCOUNTY TEMPORARY EROSION AND SEDIMENT CONTROL(TESC) BEST MANAGEMENT PRACTICE (BMP) DETAILS, SEE
SPECIFICATION APPENDIX E:
CONSTRUCTION SEQUENCE:
1.SCHEDULE AND CONDUCT A PRE-CONSTRUCTION MEETING
WITH SNOHOMISH COUNTY, THE CONTRACTOR'S
SUPERINTENDENT AND CESCL; SUB-CONTRACTOR
SUPERINTENDENTS; AND OTHER EROSION/SEDIMENT
CONTROL LEADS. THIS MEETING SHALL BE HELD NO LESS
THAN 48 HOURS PRIOR TO THE START OF WORK.
2.FLAG OR FENCE CLEARING LIMITS.
3.POST SIGN WITH NAME AND CONTACT NUMBER OF
SUPERINTENDENT AND CESCL.
4.INSTALL CATCH BASIN INLET PROTECTION.
5.INSTALL STABILIZED CONSTRUCTION ENTRANCES.
6.INSTALL SILT FENCE, OTHER PERIMETER CONTROLS.
7.INSTALL FLOATING TURBIDITY CURTAIN.
8.INSTALL AND TEST TEMPORARY BYPASS PIPING AND PUMPS.
BEGIN ROUTING STREAMFLOWS AND RUN-ON FLOWS
AROUND OR THROUGH SITE.
9.GRADE AND STABILIZE ON-SITE CONSTRUCTION ACCESS
ROUTES.
10.COMMENCE CLEARING, DEMOLITION, AND GRADING.
11.CONSTRUCT PERMANENT IMPROVEMENTS
12.MAINTAIN AND UPGRADE TESC BMPS, AS NEEDED TO COMPLY
WITH PERMIT REQUIREMENTS AND MANUFACTURER'S
RECOMMENDATIONS.
13.RELOCATE BMPS OR IMPLEMENT ADDITIONAL BMPS AS
CONDITIONS CHANGE TO ENSURE THAT BMPs COMPLY WITH
CONSTRUCTION STORMWATER PERMIT REQUIREMENTS.
14.COVER ALL AREAS WITHIN THE SPECIFIED TIME FRAME WITH
STRAW, MULCH, COVERS, BLANKETS, PLASTIC SHEETING, OR
EQUIVALENT.
15.STABILIZE EXPOSED SOILS THAT REACH FINAL GRADE BY
SEEDING OR PLANTING.
16.STABILIZE ALL DISTURBED AREAS AND REMOVE ALL
TEMPORARY BMPS WHEN WORK IS COMPLETE.
17.ADJUST THIS SEQUENCE AS NEEDED TO INCLUDE ADDITIONAL
MEASURES REQUIRED TO MEET CONSTRUCTION STORMWATER
PERMIT REQUIREMENTS.
40265 +&94+%'STAT E OF WASHIN
G
T
ONREGISTEREDPROF
ESSIONAL EN G IN EERAPPROVED FOR CONSTRUCTION
BY:
R/W PERMIT NO.
DATE
DESCRIPTIONAPP'DDATEBY
REVISIONS
REV ONE INCHAT FULL SIZE, IF NOT ONEINCH SCALE ACCORDINGLYDESIGNED BY:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DATE:
SCALE:
MEADOWDALE BEACH PARK
AND ESTUARY DESIGN
18-XXXXX
SHEET # OF
LDA PERMIT SUBMITTAL, NOT FOR CONSTRUCTION
720 Olive Way | Suite 1900 | Seattle, WA 98101
PFN: 18-XXXXX LDA
SECTION 5, TOWNSHIP 27 N., RANGE 4 E
NOTES:
1.HORIZONTAL DATUM: WASHINGTON STATE PLANE
NORTH ZONE, NAD 83, U.S. FEET.
2.VERTICAL DATUM: NAVD 88
3.DRAWINGS ARE INTENDED TO BE VIEWED IN COLOR.
SOME INFORMATION WILL BE LOST WITH BLACK AND
WHITE VIEWING.
4.PATHWAY WIDENING TO 10 FEET REQUIRES WORK ON
ADJACENT PROPERTY. OBTAINING AN EASEMENT FOR
THIS WORK IS UNDERWAY AND WILL BE COMPLETED
PRIOR TO CONSTRUCTION START DATE.
5.CONTRACTOR SHALL PROVIDE CONTINUOUS UTILITY
SERVICE AND DRIVEWAY ACCESS TO RANGER RESIDENCE.
6.SEE DRAWING T-3 FOR TESC NOTES AND ADDITIONAL
REQUIREMENTS.
DRAFT
Page | 34
Appendix B – BMP Details
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 27
4.1 Source Control BMPs
BMP C101: Preserving Natural Vegetation
Purpose
Preserving natural vegetation helps reduce erosion and surface runoff.
Conditions of Use
Natural vegetation should be preserved on steep slopes, near perennial and intermittent
watercourses or swales, and on building sites in wooded areas.
Design and Installation Specifications
Phase construction to preserve natural vegetation on the project site for as long as possible
during the construction period.
Fence or clearly mark areas around trees that are to be saved. Where feasible, do not disturb
ground within the dripline of trees that are to be saved.
Do not place fill of more than six inches depth within the dripline of trees that are to be saved.
If roots of plants intended to be saved must be cut due to excavations:
Cut as few roots as possible, and cut them cleanly.
Paint cut root ends with a wood dressing such as asphalt base paint.
Backfill excavations in these areas as soon as possible.
Maintenance Standards
Inspect flagged and/or fenced areas regularly to make sure flagging or fencing has not been
removed or damaged. If the flagging or fencing has been damaged or visibility reduced, it shall
be repaired or replaced immediately and visibility restored.
If tree roots have been exposed or injured, “prune” cleanly with an appropriate pruning saw or
loppers directly above the damaged roots and recover with native soils. Treatment of sap
flowing trees (fir, hemlock, pine, soft maples) is not advised as sap forms a natural healing
barrier.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 28
BMP C102: Buffer Zones
Purpose
Buffer zones are undisturbed areas or strips of natural vegetation or an established suitable
planting that reduce soil erosion and runoff velocities.
Conditions of Use
Note: use of buffer zones located in critical areas requires compliance with Chapter 30.62A
SCC. Natural buffer zones are used along streams, wetlands and other bodies of water that need
protection from erosion and sedimentation. Vegetative buffer zones can be used to protect
natural swales and can be incorporated into the natural landscaping of an area.
Design and Installation Specifications
Preserve natural vegetation or plantings in clumps, blocks, or strips where feasible..
Leave all unstable steep slopes in natural vegetation.
Mark clearing limits with high visibility fence meeting the requirements of BMP C103, and keep
all equipment and construction debris out of buffer zones.
Keep all excavations outside the dripline of trees and shrubs.
Do not push debris or extra soil into the buffer zone area.
Maintenance Standards
Inspect the area frequently to make sure flagging remains in place and the area remains
undisturbed.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 29
BMP C103: High Visibility Fence
Purpose
High visibility fencing is intended to:
restrict clearing to approved limits;
prevent disturbance of sensitive areas, their buffers, and other areas required to be left
undisturbed;
limit construction traffic to designated construction entrances or roads; and,
protect areas where marking with survey tape may not provide adequate protection.
Conditions of Use
See purpose.
Design and Installation Specifications
High visibility fence shall be either plastic or metal fence meeting the requirements of WSDOT
Standard Specification 9-14.5(8) High Visibility Fencing.
Fencing shall be installed in accordance with WSDOT Standard Plan I-10.10-01 High Visibility
Fence.
Fabric silt fence may be installed to serve as high visibility fence, provided the fence materials
meet all specifications for BMP C103.
Fences shall not be wired or stapled to trees.
Maintenance Standards
If the fence has been damaged or visibility reduced, it shall be repaired or replaced immediately
and visibility restored.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 30
BMP C105: Stabilized Construction Exit
Purpose
Construction exits are stabilized to reduce the amount of sediment transported from construction
sites onto paved roads by vehicles or equipment by constructing a stabilized pad of quarry spalls
at exits to construction sites.
Conditions of Use
Construction exits shall be stabilized wherever traffic will be leaving a construction site if paved
roads or other paved areas are within 1,000 feet of the site.
For construction on single-family residential lots following plat approval, provide a stabilized
construction exit for each lot at which construction is occurring, rather than only at the main
subdivision exit. Stabilized surfaces shall be of sufficient length and width to provide vehicle
access and parking, with a minimum length of 50 feet for construction sites less than 1 acre.
Design and Installation Specifications
See WSDOT Standard Plan I-80.10.01 Stabilized Construction Entrance for detail drawing and
construction plan notes.
Construct stabilized construction exits with a 12-inch-thick pad of 4-inch to 8-inch quarry spalls,
a 4-inch course of asphalt treated base (ATB), or use existing pavement. Do not use crushed
concrete, cement, or calcium chloride for construction exit stabilization.
Fencing (see BMPs C103 and C104) shall be installed as necessary to restrict traffic to the
stabilized construction exit.
Whenever possible, the stabilized construction exit shall be constructed on a firm, compacted
subgrade.
Stabilized construction exits shall not cross existing sidewalks and back-of-walk drains if
feasible. If such crossings cannot be avoided, the full length of the sidewalk and associated drain
must be covered and protected from sediment leaving the site.
Maintenance Standards
Quarry spalls shall be added if the pad is no longer in accordance with the specifications.
If the entrance is not preventing sediment from being tracked onto pavement, alternative
measures to keep the streets free of sediment shall be used. These may include replacement or
cleaning of existing quarry spalls, street sweeping, an increase in the dimensions of the entrance,
or the installation of a wheel wash.
Any sediment tracked onto pavement shall be removed by shoveling or street sweeping. The
sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not
be cleaned by washing down the street, except when sweeping is ineffective and there is a threat
to public safety. Street wash water shall be collected and disposed of as process wastewater, or
disposed of on-site using one of the following BMPs:
BMP C236 – Pumped Vegetated Dispersion System
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 31
BMP T5.30 – Full Dispersion (see Snohomish County Drainage Manual, Volume V)
an infiltration BMP designed in accordance with Snohomish County Drainage Manual,
Volume V Chapter 7.
Perform street sweeping by hand or with a high-efficiency sweeper.
Immediately remove quarry spalls from the roadway that have been transported from the
stabilized construction entrance / exit.
Upon project completion and site stabilization, all construction accesses intended as permanent
access for maintenance shall be permanently stabilized.
Approved equivalents
The Washington State Department of Ecology has approved products as able to meet the
requirements of this BMP. Snohomish County may approve these products if they are used in
accordance with all requirements of this BMP and all instructions and specifications provided by
the manufacturer, plus additional requirements that may be established by the County. These
products are available for review at
http://www.ecy.wa.gov/programs/wq/stormwater/newtech/equivalent.html.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 35
BMP C107: Construction Road/Parking Area Stabilization
Purpose
Stabilizing subdivision roads, parking areas, and other onsite vehicle transportation routes
immediately after grading reduces erosion caused by construction traffic or runoff.
Conditions of Use
Permanent and temporary roads and parking areas used for construction traffic shall be
stabilized.
High Visibility Fencing (BMP C103) shall be installed to limit the access of vehicles to only
those roads and parking areas that are stabilized.
Design and Installation Specifications
On areas that will receive asphalt as part of the project, install the first lift as soon as possible.
A 6-inch depth of 2- to 4-inch crushed rock, gravel base, or crushed surfacing base course shall
be applied immediately after grading or utility installation. A 4-inch course of asphalt treated
base (ATB) may also be used, or the road/parking area may be paved. If cement or cement kiln
dust is used for road base stabilization, pH monitoring and BMPs are necessary to evaluate and
minimize the effects on stormwater. If the area will not be used for permanent roads, parking
areas, or structures, a 6-inch depth of hog fuel may also be used. Whenever possible,
construction roads and parking areas shall be placed on a firm, compacted subgrade.
Temporary road gradients shall not exceed 15 percent. If road runoff is concentrated in a
drainage ditch, the runoff shall be routed to a sediment control BMP acceptable for using in
treating concentrated flow. If feasible, road runoff may be allowed to sheetflow into a vegetated
area meeting the requirements of BMP C234 – Vegetated Strip.
Storm drain inlets shall be protected to prevent sediment-laden water entering the storm drain
system (see BMP C220).
Maintenance Standards
Inspect stabilized areas regularly, especially after large storm events.
Crushed rock, gravel base, hog fuel, etc. shall be added as required to maintain a stable driving
surface and to stabilize any areas that have eroded.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 36
BMP C120: Temporary and Permanent Seeding
NOTE: Small projects permitted in accordance with SCC 30.63A.810 shall
only use BMPs in this section that do not require the involvement of a
licensed engineer.
Purpose
Seeding is intended to reduce erosion by stabilizing exposed soils. A well-established vegetative
cover is one of the most effective methods of reducing erosion.
Conditions of Use
Use seeding throughout the project on disturbed areas that have reached final grade or that will
remain unworked for more than 30 days.
Between July 1 and August 30 seeding requires irrigation until 75 percent grass cover is
established.
Between October 1 and March 30 seeding requires a cover of mulch with straw or an erosion
control blanket until 75 percent grass cover is established.
Inspect all disturbed areas in late August to early September and complete all seeding by
September 30.
Design and Installation Specifications
General
Seed shall conform to WSDOT Standard Specification 9-14.2 Seed.
Unless contradicted by information stated below, temporary and permanent seeding shall be
performed in accordance with WSDOT Standard Specification 8-01.3(2) Seeding, Fertilizing,
and Mulching, Sections A-F.
Final seed application is restricted to the periods April 1 through June 30 and September 1
through October 1.
Use of polyacrylamide (PAM) shall conform to the requirements of BMP C126.
Seed and mulch all disturbed areas not otherwise vegetated at final site stabilization. Final
stabilization means the completion of all soil disturbing activities at the site and the
establishment of a permanent vegetative cover, or equivalent permanent stabilization measures
(such as pavement, riprap, gabions or geotextiles) which will prevent erosion.
Seed may be installed by hand or by hydroseeding. Hand seeding may be used for establishing
temporary vegetation or for establishing permanent vegetation in areas less than one acre.
Apply mulch to all seeded areas, either on top of the seed or simultaneously by hydroseeding.
See BMP C121: Mulching for specifications.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 37
Seeding vegetated channels
Channels that are intended to be vegetated shall be installed before other grading on the project.
Hydroseed these channels with a Bonded Fiber Matrix. For vegetated channels that receive have
flows capable of eroding the channel, install erosion control blankets over hydroseed. Before
allowing water to flow in vegetated channels, establish 75 percent vegetation cover, or install sod
in the channel bottom over hydromulch and erosion control blankets.
On slopes greater than 33% use Bonded Fiber Matrix (BFM) or Mechanically Bonded Fiber
Matrix (MBFM) products in accordance with the specifications set forth later in this section.
Seed mixes
The seed mixes listed in the tables below include recommended mixes for both temporary and
permanent seeding. Snohomish County may approve other seed mixes.
Select a seed mix appropriate for the location, exposure, soil type, site hydrology, need for
irrigation, slope, and expected foot traffic. Alternative seed mixes approved by the local
authority may be used.
With the exception of the wetland mix, apply seed at a rate of 120 pounds per acre.
Table 4.2 presents a seed mix appropriate for temporary vegetative cover.
Table 4.2
Temporary Erosion Control Seed Mix
% Weight %
Purity
% Germination
Chewings red fescue
or annual blue grass
Festuca rubra var. commutata or Poa anna
40 98 90
Perennial rye -
Lolium perenne
50 98 90
Redtop or colonial bentgrass
Agrostis alba or Agrostis tenuis
5 92 85
White dutch clover
Trifolium repens
5 98 90
Table 4.3 presents a seed mix appropriate for landscaped areas.
Table 4.3
Landscaping Seed Mix
% Weight
%
Purity % Germination
Perennial rye blend
Lolium perenne
70 98 90
Chewings red fescue and red fescue blend
Festuca rubra var. commutata
or Festuca rubra
30 98 90
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 38
Table 4.4 presents a seed mix appropriate for dry situations where little water is required. This
mix requires very little maintenance.
Table 4.4
Low-Growing Turf Seed Mix
% Weight %
Purity
% Germination
Dwarf tall fescue (several varieties)
Festuca arundinacea var.
45 98 90
Dwarf perennial rye (Barclay)
Lolium perenne var. barclay
30 98 90
Red fescue
Festuca rubra
20 98 90
Colonial bentgrass
Agrostis tenuis
5 98 90
Table 4.5 presents a mix recommended for bioswales and other intermittently wet areas.
Table 4.5
Bioswale Seed Mix
% Weight %
Purity
% Germination
Tall or meadow fescue
Festuca arundinacea or Festuca elatior
75-80 98 90
Seaside/Creeping bentgrass
Agrostis palustris
10-15 92 85
Redtop bentgrass
Agrostis alba or Agrostis gigantea
5-10 90 80
Table 4.6 presents a low-growing, relatively non-invasive seed mix appropriate for very wet
areas that are not regulated wetlands. Apply this mixture at a rate of 60 pounds per acre.
Consult Hydraulic Permit Authority (HPA) for seed mixes if applicable.
Table 4.6
Wet Area Seed Mix*
% Weight %
Purity
% Germination
Tall or meadow fescue
Festuca arundinacea or
Festuca elatior
60-70 98 90
Seaside/Creeping bentgrass
Agrostis palustris
10-15 98 85
Meadow foxtail
Alepocurus pratensis
10-15 90 80
Alsike clover
Trifolium hybridum
1-6 98 90
Redtop bentgrass
Agrostis alba
1-6 92 85
* Modified Briargreen, Inc. Hydroseeding Guide Wetlands Seed Mix
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 39
Table 4.7 lists a meadow seed mix appropriate for infrequently maintained areas or non-
maintained areas where colonization by native plants is desirable. Seeding should take place in
September or very early October in order to obtain adequate establishment prior to the winter
months.
Table 4.7
Meadow Seed Mix
% Weight %
Purity
% Germination
Redtop or Oregon bentgrass
Agrostis alba or Agrostis oregonensis
20 92 85
Red fescue
Festuca rubra
70 98 90
White dutch clover
Trifolium repens
10 98 90
Roughening and Rototilling:
The seedbed should be firm and rough. Roughen all soil no matter what the slope. Track walk
slopes before seeding if engineering purposes require compaction. Backblading or smoothing of
slopes greater than 4H:1V is not allowed if they are to be seeded.
Restoration-based landscape practices require deeper incorporation than that provided by a
simple single-pass rototilling treatment. Wherever practical, initially rip the subgrade to improve
long-term permeability, infiltration, and water inflow qualities. At a minimum, permanent areas
shall use soil amendments to achieve organic matter and permeability performance defined in
engineered soil/landscape systems. For systems that are deeper than 8 inches complete the
rototilling process in multiple lifts, or prepare the engineered soil system per specifications and
place to achieve the specified depth.
Fertilizer
Use slow-release 10-4-6 N-P-K (nitrogen-phosphorus-potassium) fertilizer at a rate of 90 pounds
per acre. Do not add fertilizer to the hydromulch machine, or agitate fertilizer, more than 20
minutes before use, to prevent destruction of the slow-release coating.
Bonded Fiber Matrix (BFM) and Mechanically Bonded Fiber Matrix (MBFM)
Apply BFM/MBFM products at a minimum rate of 3,000 pounds per acre of product with
approximately 10 percent tackifier. Achieve a minimum of 95 percent soil coverage during
application. Install products per manufacturer’s instructions. Most products require 24-36 hours
to cure before rainfall and cannot be installed on wet or saturated soils.
Maintenance Standards
Reseed any seeded areas that fail to establish at least 80 percent cover (100 percent cover for
areas that receive sheet or concentrated flows). If reseeding is ineffective, use an alternate
method such as sodding, mulching, or nets/blankets. If winter weather prevents adequate grass
growth, this time limit may be relaxed at the discretion of the local authority when sensitive
areas would otherwise be protected.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 40
Approved equivalents
The Washington State Department of Ecology has approved products as able to meet the
requirements of this BMP. Snohomish County may approve these products if they are used in
accordance with all requirements of this BMP and all instructions and specifications provided by
the manufacturer, plus additional requirements that may be established by the County.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 41
BMP C121: Mulching
Purpose
The purpose of mulching soils is to provide immediate temporary protection from erosion, and to
enhance plant establishment by conserving moisture; holding fertilizer, seed, and topsoil in
place; and moderating soil temperatures.
Conditions of Use
As a temporary cover measure, mulch shall be used:
For less than 30 days on disturbed areas that require cover.
At all times for seeded areas, especially during the wet season and during the hot summer
months.
During the wet season on slopes steeper than 3H:1V with more than 10 feet of vertical relief.
Design and Installation Specifications
Mulch materials and application rates shall conform to WSDOT Standard Specification 9-14.4
and subsections of that section pertaining to mulch materials and application, and to WSDOT
Highway Runoff Manual BMO 6A-2.2 - Mulching.
Where the option of “Compost” is selected, it should be a coarse compost that meets the
following size gradations when tested in accordance with the U.S. Composting Council “Test
Methods for the Examination of Compost and Composting” (TMECC) Test Method 02.02-B.
Minimum 100% passing 3” sieve openings
Minimum 90% passing 1” sieve openings
Minimum 70% passing ¾” sieve openings
Minimum 40% passing ¼” sieve openings
For seeded areas mulch may be made up of cottonseed meal; fibers made of wood, recycled
cellulose, hemp, kenaf; compost; or blends of these.
Tackifier, if used, shall conform to WSDOT Standard Specifications 9-14.4(7), 9-14.4(7)A, and
9-14.4(7)B.
Add seed and fertilizer at time of application.
Apply mulch to a minimum thickness of two inches, and increase thickness as needed until
ground is not visible under mulch.
Mulch used within the ordinary high-water mark of surface waters should be selected to
minimize potential flotation of organic matter. Composted organic materials have higher
specific gravities (densities) than straw, wood, or chipped material.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 42
Maintenance Standards
The design thickness of the mulch cover must be maintained.
Any areas that experience erosion shall be remulched and/or protected with a net or blanket. If
the erosion problem is drainage related, then the problem shall be fixed and the eroded area
remulched.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 43
BMP C122: Blankets
NOTE: Small projects permitted in accordance with SCC 30.63A.810 shall
only use this BMP in a manner that does not require the involvement of a
licensed engineer.
Purpose
Erosion control nets and blankets are intended to prevent erosion and hold seed and mulch in
place on steep slopes and in channels so that vegetation can become well established. In
addition, some nets and blankets can be used to permanently reinforce turf to protect drainage
ways during high flows. Nets (commonly called matting) are strands of material woven into an
open, but high-tensile strength net (for example, coconut fiber matting). Blankets are strands of
material that are not tightly woven, but instead form a layer of interlocking fibers, typically held
together by a biodegradable or photodegradable netting (for example, excelsior or straw
blankets). They generally have lower tensile strength than nets, but cover the ground more
completely. Coir (coconut fiber) fabric comes as both nets and blankets.
Conditions of Use
Erosion control blankets shall be used in accordance with the requirements of WSDOT Highway
Runoff Manual BMP 6A-2.3 – Blankets.
Design and Installation Specifications
Unless specifically stated below, selection, materials, and installation of erosion control blankets
shall meet the requirements of:
WSDOT Standard Specification 8-01.3(3) – Placing Erosion Control Blanket
WSDOT Standard Specification 9-14.5(2) – Erosion Control Blanket
WSDOT Standard Plan I-60.10-00 – Erosion Control Blanket Placement on Slope
WSDOT Standard Plan I-60.20-00 – Erosion Control Blanket Placement in Channel
Blankets on slopes shall be installed according to manufacturer's instructions provided the
instructions do not contradict the information set forth in the WSDOT documents listed above.
Jute matting must be used in conjunction with mulch (BMP C121). Excelsior, woven straw
blankets and coir (coconut fiber) blankets may be installed without mulch.
If synthetic blankets are used, the soil shall be hydromulched first.
Maintenance Standards
Good contact with the ground must be maintained, and erosion must not occur beneath the net or
blanket.
Any areas of the net or blanket that are damaged or not in close contact with the ground shall be
repaired and stapled.
If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded
area protected.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 44
Figure 4.2 –Installation of Erosion Control Blanket in Channel
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 45
Min. 2“Overlap
Slope surface shall be smooth beforeplacement for proper soil contact.
Stapling pattern as permanufacturer’s recommendations.
Do not stretch blankets/mattings tight -allow the rolls to mold to any irregularities.
For slopes less than 3H:1V, rollsmay be placed in horizontal strips.
If there is a berm at thetop of slope, anchorupslope of the berm.
Anchor in 6"x6" min. Trenchand staple at 12" intervals.
Min. 6" overlap.
Staple overlapsmax. 5" spacing.
Bring material down to a level area, turnthe end under 4" and staple at 12" intervals.
Lime, fertilize, and seed before installation.Planting of shrubs, trees, etc. Should occurafter installation.
Figure 4.3 –Installation of Erosion Control Blanket on Slope
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 46
BMP C123: Plastic Covering
NOTE: Small projects permitted in accordance with SCC 30.63A.810 shall
only use this BMP in a manner that does not require the involvement of a
licensed engineer.
Purpose
Plastic covering provides immediate, short-term erosion protection to slopes and disturbed areas.
Conditions of Use
Plastic covering may be used on disturbed areas that require cover measures for less than 30
days, except as stated below:
Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: The
relatively rapid breakdown of most polyethylene sheeting makes it unsuitable for long-term
(greater than six months) applications.
Clear plastic sheeting can be used over newly-seeded areas to create a greenhouse effect and
encourage grass growth if the hydroseed was installed too late in the season to establish 75
percent grass cover, or if the wet season started earlier than normal. Clear plastic should not
be used for this purpose during the summer months because the resulting high temperatures
can kill the grass.
Due to rapid runoff caused by plastic sheeting, sheeting shall not be used upslope of areas
that might be adversely impacted by concentrated runoff. Such areas include steep and/or
unstable slopes.
Plastic sheeting may result in increased runoff volumes and velocities, requiring additional
on-site measures to counteract the increases. Creating a trough with wattles (see BMP C235)
or other material can convey clean water away from these areas.
To prevent undercutting, trench and backfill rolled plastic covering products.
Whenever plastic is used to protect slopes, water collection measures must be installed at the
base of the slope. These measures include plastic-covered berms, channels, and pipes used to
covey clean rainwater away from bare soil and disturbed areas. Do not mix clean runoff
from a plastic covered slope with dirty runoff.
Plastic covering may also be used for:
Temporary ditch liner;
Pond liner in temporary sediment pond;
Liner for bermed temporary fuel storage area if plastic is not reactive to the type of fuel being
stored;
Emergency slope protection during heavy rains; and,
Temporary drainpipe (“elephant trunk”) used to direct water.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 47
Design and Installation Specifications
Plastic sheeting shall be selected and installed in conformance with the requirements in the
following:
WSDOT Highway Runoff Manual BMP 6A-2.4 – Plastic Covering
WSDOT Standard Specification 8-01.3(5) – Placing Plastic Covering
Plastic sheeting (clear and non-clear) shall conform to the requirements set forth in WSDOT
Standard Specification 9-14.5(3) – Clear Plastic Covering.
Clear plastic covering shall be used to promote growth of vegetation. Black plastic covering
shall be used for stockpiles or other areas where vegetative growth is unwanted.
Plastic slope cover must be installed as follows:
Run plastic up and down slope, not across slope;
Plastic may be installed perpendicular to a slope if the slope length is less than 10 feet;
On long or wide slopes, or slopes subject to wind, all seams should be taped;
Place plastic into a small (12-inch wide by 6-inch deep) slot trench at the top of the slope and
backfill with soil to keep water from flowing underneath;
Place sand filled burlap or geotextile bags every 3 to 6 feet along seams and pound a wooden
stake through each to hold them in place;
Inspect plastic for rips, tears, and open seams regularly and repair immediately. This
prevents high velocity runoff from contacting bare soil which causes extreme erosion;
Sandbags may be lowered into place tied to ropes. However, all sandbags must be staked in
place.
If erosion at the toe of a slope is likely, a gravel berm, riprap, or other suitable protection
shall be installed at the toe of the slope in order to reduce the velocity of runoff
Maintenance Standards
Torn sheets must be replaced and open seams repaired.
If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely removed
and replaced.
When the plastic is no longer needed, it shall be completely removed.
Approved equivalents
The Washington State Department of Ecology has approved products as able to meet the
requirements of this BMP. Snohomish County may approve these products if they are used in
accordance with all requirements of this BMP and all instructions and specifications provided by
the manufacturer, plus additional requirements that may be established by the County.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 60
BMP C140: Dust Control
Purpose
Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways,
drainage ways, and surface waters.
Conditions of Use
In areas (including roadways) subject to surface and air movement of dust where on-site and off-
site impacts to roadways, drainage ways, or surface waters are likely.
Design and Installation Specifications
Vegetate or mulch areas that will not receive vehicle traffic. In areas where planting, mulching,
or paving is impractical, apply gravel or landscaping rock.
Limit dust generation by clearing only those areas where immediate activity will take place,
leaving the remaining area(s) in the original condition, if stable. Maintain the original ground
cover as long as practical.
Construct natural or artificial windbreaks or windscreens. These may be designed as enclosures
for small dust sources.
Sprinkle the site with water until surface is wet. Repeat as needed. To prevent carryout of mud
onto street, refer to Stabilized Construction Entrance (BMP C105).
Irrigation water can be used for dust control. Irrigation systems should be installed as a first step
on sites where dust control is a concern.
Spray exposed soil areas with a dust palliative, following the manufacturer’s instructions and
cautions regarding handling and application. Used oil is prohibited from use as a dust
suppressant. Water containing polyacrylamide (PAM) may be used in accordance with the
requirements of BMP C126.
Techniques that can be used for unpaved roads and lots include:
Lower speed limits. High vehicle speed increases the amount of dust stirred up from
unpaved roads and lots.
Upgrade the road surface strength by improving particle size, shape, and mineral types that
make up the surface and base materials.
Add surface gravel to reduce the source of dust emission. Limit the amount of fine particles
(those smaller than .075 mm) to 10 to 20 percent.
Use geotextile fabrics to increase the strength of new roads or roads undergoing
reconstruction.
Encourage the use of alternate, paved routes, if available.
Restrict use by tracked vehicles and heavy trucks to prevent damage to road surface and base.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 61
Apply chemical dust suppressants using the admix method, blending the product with the top
few inches of surface material. Suppressants may also be applied as surface treatments.
Pave unpaved permanent roads and other trafficked areas.
Use vacuum street sweepers.
Remove mud and other dirt promptly so it does not dry and then turn into dust.
Limit dust-causing work on windy days.
Maintenance Standards
Respray area as necessary to keep dust to a minimum.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 62
BMP C150: Materials On Hand
Purpose
Quantities of erosion prevention and sediment control materials shall be kept on the project site
at all times to be used for emergency situations such as unexpected heavy summer rains. Having
these materials on-site reduces the time needed to implement BMPs when inspections indicate
that existing BMPs are not meeting the SWPPP requirements.
Conditions of Use
Construction projects of any size or type can benefit from having materials on hand. A small
commercial development project could have a roll of plastic and some gravel available for
immediate protection of bare soil and temporary berm construction. A large earthwork project,
such as highway construction, might have several tons of straw, several rolls of plastic, flexible
pipe, sandbags, geotextile fabric and steel “T” posts.
Materials are stockpiled and readily available before any site clearing, grubbing, or earthwork
begins. A large contractor or developer could keep a stockpile of materials that are available to
be used on several projects.
If storage space at the project site is at a premium, the contractor may maintain the materials at
their office or yard, provided that the office or yard is less than an hour from the project site.
Design and Installation Specifications
Depending on project type, size, complexity, and length, materials and quantities will vary. A
good minimum that will cover numerous situations includes:
Material
Clear Plastic, 6 mil
Drainpipe, 6 or 8 inch diameter
Sandbags, filled
Straw Bales for mulching,
Quarry Spalls
Washed Gravel
Geotextile Fabric
Catch Basin Inserts
Steel “T” Posts
Maintenance Standards
All materials with the exception of the quarry spalls, steel “T” posts, and gravel should be kept
covered and out of both sun and rain.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 63
BMP C151: Concrete Handling
NOTE: Small projects permitted in accordance with SCC 30.63A.810 shall
only use this BMP in a manner that does not require the involvement of a
licensed engineer.
Purpose
Proper collection, handling and disposal of process water and slurry generated during concrete
work, and of excess concrete, prevents these materials from contaminating waters of the state.
Conditions of Use
Any time concrete is used, these management practices shall be utilized. Concrete construction
projects include, but are not limited to, the following:
Curbs
Sidewalks
Roads
Bridges
Foundations
Floors
Runways
Design and Installation Specifications
Wash out concrete truck chutes, pumps, and internal components at an off-site location in
accordance with applicable County, state, and federal regulations, or in designated concrete
washout areas (see BMP C154). Do not wash out concrete trucks onto the ground, or into storm
drains, open ditches, streets, or streams.
Return unused concrete remaining in the truck and pump to the originating batch plant for
recycling. Do not dump excess concrete on site, except in designated concrete washout areas.
Wash off hand tools including, but not limited to, screeds, shovels, rakes, floats, and trowels into
formed areas only.
Wash equipment difficult to move, such as concrete pavers in areas that do not directly drain to
natural or constructed stormwater conveyances.
Do not allow washdown from areas, such as concrete aggregate driveways, to drain directly to
natural or constructed stormwater conveyances.
Contain washwater and leftover product in a lined container when no formed areas are available.
Dispose of wash water and contained concrete in a manner that does not violate ground water or
surface water quality standards.
Always use forms or solid barriers for concrete pours, such as pilings, within 15 feet of surface
waters.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 64
Refer to BMPs C252 and C253 for pH adjustment to stormwater that has come into contact with
fresh concrete. NOTE: These BMPs are for treatment of stormwater only. Process wastewater
such as concrete wash water must be disposed of as a wastewater.
Maintenance Standards
Containers shall be checked for holes in the liner daily during concrete pours and repaired the
same day.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 65
BMP C152: Sawcutting and Surfacing Pollution Prevention
Purpose
Proper collection, handling and disposal of process water and slurry generated during concrete
sawcutting and surfacing work, and of excess concrete, prevents these materials from
contaminating waters of the state.
Conditions of Use
Anytime sawcutting or surfacing operations take place, these management practices shall be
utilized. Sawcutting and surfacing operations include, but are not limited to, the following:
Sawing
Coring
Grinding
Roughening
Hydro-demolition
Bridge and road surfacing
Design and Installation Specifications
Slurry and cuttings shall be vacuumed during cutting and surfacing operations.
Slurry and cuttings shall not remain on permanent concrete or asphalt pavement overnight.
Slurry and cuttings shall not drain to any natural or constructed drainage conveyance.
Collected slurry and cuttings shall be disposed of in a manner that does not violate groundwater
or surface water quality standards.
Process water that is generated during hydro-demolition, surface roughening or similar
operations shall not drain to any natural or constructed drainage conveyance and shall be
disposed of in a manner that does not violate groundwater or surface water quality standards.
Cleaning waste material and demolition debris shall be handled and disposed of in a manner that
does not cause contamination of water. If the area is swept with a pick-up sweeper, the material
must be hauled out of the area to an appropriate disposal site.
Maintenance Standards
Continually monitor operations to determine whether slurry, cuttings, or process water could
enter waters of the state. If inspections show that a violation of water quality standards could
occur, stop operations and immediately implement preventive measures such as berms, barriers,
secondary containment, and vacuum trucks.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 72
BMP C160: Certified Erosion and Sediment Control Lead
Purpose
The project proponent designates at least one person as the responsible representative in charge
of erosion and sediment control (ESC), and water quality protection. The designated person shall
be the Certified Erosion and Sediment Control Lead (CESCL) who is responsible for ensuring
compliance with all local, state, and federal erosion and sediment control and water quality
requirements.
Conditions of Use
A CESCL shall be made available on projects one acre or larger that discharge stormwater to
surface waters of the state.
The CESCL shall:
Have a current certificate proving attendance in an erosion and sediment control training course
that meets the minimum ESC training and certification requirements established by Ecology
(Ecology will maintain a list of ESC training and certification providers at:
http://www.ecy.wa.gov/programs/wq/stormwater/cescl.html).
OR
Be a Certified Professional in Erosion and Sediment Control (CPESC); for additional
information go to: www.cpesc.net
Specification
The CESCL shall have authority to act on behalf of the contractor or developer and shall be
available, or on-call, 24 hours per day throughout the period of construction.
A CESCL may provide inspection and compliance services for multiple construction projects in
the same geographic region.
Duties and responsibilities of the CESCL shall include, but are not limited to the following:
Maintaining permit file on site at all times which includes the Construction SWPPP and any
associated permits and plans.
Directing BMP installation, inspection, maintenance, modification, and removal.
Updating all project drawings and the Construction SWPPP with changes made.
Completing any sampling requirements including reporting results using WebDMR.
Keeping daily logs, and inspection reports. Inspection reports should include:
Inspection date/time.
Weather information; general conditions during inspection and approximate amount of
precipitation since the last inspection.
A summary or list of all BMPs implemented, including observations of all erosion/sediment
control structures or practices. The following shall be noted:
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 73
o Locations of BMPs inspected.
o Locations of BMPs that need maintenance.
o Locations of BMPs that failed to operate as designed or intended.
o Locations of where additional or different BMPs are required.
Visual monitoring results, including a description of discharged stormwater. The presence of
suspended sediment, turbid water, discoloration, and oil sheen shall be noted, as applicable.
Any water quality monitoring performed during inspection.
General comments and notes, including a brief description of any BMP repairs, maintenance
or installations made as a result of the inspection.
Facilitate, participate in, and take corrective actions resulting from inspections performed by
outside agencies or the owner.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 74
BMP C162: Scheduling
Purpose
Sequencing a construction project reduces the amount and duration of soil exposed to erosion by
wind, rain, runoff, and vehicle tracking.
Conditions of Use
The construction sequence schedule is an orderly listing of all major land-disturbing activities
together with the necessary erosion and sedimentation control measures planned for the project.
This type of schedule guides the contractor on work to be done before other work is started so
that serious erosion and sedimentation problems can be avoided.
Following a specified work schedule that coordinates the timing of land-disturbing activities and
the installation of control measures is perhaps the most cost-effective way of controlling erosion
during construction. The removal of surface ground cover leaves a site vulnerable to accelerated
erosion. Construction procedures that limit land clearing provide timely installation of erosion
and sedimentation controls, and restore protective cover quickly can significantly reduce the
erosion potential of a site.
Design Considerations
Minimize construction during rainy periods.
Schedule projects to disturb only small portions of the site at any one time. Complete grading as soon
as possible. Immediately stabilize the disturbed portion before grading the next portion. Practice
staged seeding in order to revegetate cut and fill slopes as the work progresses.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 104
BMP C220: Storm Drain Inlet Protection
Purpose
Storm drain inlet protection BMPs prevent coarse sediment from entering drainage systems prior
to permanent stabilization of a disturbed area.
Conditions of Use
Use storm drain inlet protection where storm drain inlets are to be made operational before
permanent stabilization of the disturbed drainage area. Provide protection for all storm drain
inlets downslope and within 500 feet of a disturbed or construction area, unless the runoff that
enters the catch basin will be conveyed to a sediment pond or trap.
Table 4.10 lists several options for inlet protection. All of the methods for storm drain inlet
protection are prone to plugging and require a high frequency of maintenance. The maximum
drainage area to a single protection BMP shall be 1 acre. Emergency overflows may be required
where stormwater ponding would cause a hazard. If an emergency overflow is provided,
additional end-of-pipe treatment may be required.
Table 4.10
Storm Drain Inlet Protection
Type of Inlet Protection
Emergency
Overflow
Applicable for
Paved/ Earthen
Surfaces Conditions of Use
Drop Inlet Protection
Excavated drop inlet
protection
Yes, temporary
flooding will
occur
Earthen Applicable for heavy flows. Easy to
maintain. Large area Requirement: 30’
X 30’/acre
Block and gravel drop inlet
protection
Yes Paved or Earthen Applicable for heavy concentrated
flows. Will not pond.
Gravel and wire drop inlet
protection
No Applicable for heavy concentrated
flows. Will pond. Can withstand
traffic.
Catch basin filters Yes Paved or Earthen Frequent maintenance required.
Curb Inlet Protection
Curb inlet protection with a
wooden weir
Small capacity
overflow
Paved Used for sturdy, more compact
installation.
Block and gravel curb inlet
protection
Yes Paved Sturdy, but limited filtration.
Culvert Inlet Protection
Culvert inlet sediment trap 18 month expected life.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 105
Design and Installation Specifications
Excavated Drop Inlet Protection
Excavated drop inlet protection is an excavated impoundment around the storm drain.
Sediment settles out of the stormwater prior to entering the storm drain.
Depth 1-2 ft as measured from the crest of the inlet structure.
Side Slopes of excavation no steeper than 2:1.
Minimum volume of excavation 35 cubic yards.
Shape basin to fit site with longest dimension oriented toward the longest inflow area.
Install provisions for draining to prevent standing water problems.
Clear the area of all debris.
Grade the approach to the inlet uniformly.
Drill weep holes into the side of the inlet.
Protect weep holes with screen wire and washed aggregate.
Seal weep holes when removing structure and stabilizing area.
Build a temporary dike downslope of the structure if necessary prevent bypass flow.
Block and Gravel Filter
Block and gravel filter is a barrier formed around the storm drain inlet with standard concrete
blocks and gravel. See Figure 4.16.
Height 1 to 2 feet above inlet.
Recess the first row 2 inches into the ground for stability.
Support subsequent courses by placing a 2x4 through the block opening.
Do not use mortar.
Lay some blocks in the bottom row on their side for dewatering the pool.
Place hardware cloth or comparable wire mesh with ½-inch openings over all block
openings.
Place gravel just below the top of blocks on slopes of 2:1 or flatter.
An alternative design is a gravel donut.
Inlet slope of 3H:1V.
Outlet slope of 2H:1V.
Provide a 1-foot wide level stone area between the structure and the inlet.
Use inlet slope stones 3 inches in diameter or larger.
Use gravel ½- to ¾-inch at a minimum thickness of 1 foot for the outlet slope.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 106
Gravel and Wire Mesh Filter
A gravel and wire mesh filter is a gravel barrier placed over the top of the inlet. This
structure does not provide an overflow.
Use hardware cloth or comparable wire mesh with ½-inch openings.
Use coarse aggregate.
Provide a height of 1 foot or more, 18 inches wider than inlet on all sides.
Place wire mesh over the drop inlet so that the wire extends a minimum of 1-foot beyond
each side of the inlet structure.
If more than one strip of mesh is necessary, overlap the strips.
Place coarse aggregate over the wire mesh.
The depth of the gravel shall be at least 12 inches over the entire inlet opening and extend at
least 18 inches on all sides.
Catchbasin filters
Catchbasin filters should be designed by the manufacturer for use at construction sites. The
limited sediment storage capacity increases the amount of inspection and maintenance
required, which may be daily for heavy sediment loads. The maintenance requirements can
be reduced by combining a catchbasin filter with another type of inlet protection. This type
of inlet protection provides flow bypass without overflow and therefore may be a better
method for inlets located along active rights-of-way.
A BMP for dewatering must be provided at the site.
The catch basin filter must have a high-flow bypass feature that will not clog under normal
use at a construction site.
Install the catchbasin filter according to the manufacturer’s instructions.
Curb Inlet Protection with Wooden Weir
Curb inlet protection with wooden weir is a barrier formed around a curb inlet with a wooden
frame and gravel
Use wire mesh with ½-inch openings.
Use extra strength filter cloth.
Construct a frame
Attach the wire and filter fabric to the frame.
Pile coarse washed aggregate against wire/fabric.
Place weight on frame anchors.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 107
Block and Gravel Curb Inlet Protection
The block and gravel curb inlet protection is a barrier formed around an inlet with concrete
blocks and gravel. See Figure 4.17.
Use wire mesh with ½-inch openings.
Place two concrete blocks on their sides abutting the curb at either side of the inlet opening.
These are spacer blocks.
Place a 2x4 stud through the outer holes of each spacer block to align the front blocks.
Place blocks on their sides across the front of the inlet and abutting the spacer blocks.
Place wire mesh over the outside vertical face.
Pile coarse aggregate against the wire to the top of the barrier
Curb and gutter sediment barrier
The curb and gutter sediment barrier is a sandbag or rock berm (riprap and aggregate) 3 feet
high and 3 feet wide in a horseshoe shape. See Figure 4.18.
Construct a horseshoe shaped berm, faced with coarse aggregate if using riprap, 3 feet high
and 3 feet wide, at least 2 feet from the inlet.
Construct a horseshoe shaped sedimentation trap on the outside of the berm sized to sediment
trap standards for protecting a culvert inlet.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 108
Figure 4.16 – Block and Gravel Filter
Ponding Height
Notes:
1. Drop inlet sediment barriers are to be used for small, nearly level drainage areas. (less than 5%)
2. Excavate a basin of sufficient size adjacent to the drop inlet.
3. The top of the structure (ponding height) must be well below the ground elevation downslope to prevent
runoff from bypassing the inlet. A temporary dike may be necessary on the downslope side of the structure.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 109
Figure 4.17 – Block and Gravel Curb Inlet Protection
A
Plan View
Wire Screen or
Filter Fabric Catch Basin
Curb Inlet
Concrete Block
Ponding Height
Overflow
2x4 Wood Stud(100x50 Timber Stud)
Concrete Block
Wire Screen orFilter Fabric
Curb Inlet
¾" Drain Gravel(20mm)
¾" Drain Gravel(20mm)Section A - A
Back of Curb Concrete Block
2x4 Wood Stud
Catch BasinBack of Sidewalk
NOTES:
1. Use block and gravel type sediment barrier when curb inlet is located in gently sloping street segment, where water can pond and allow sediment to separate from runoff.
2. Barrier shall allow for overflow from severe storm event.3. Inspect barriers and remove sediment after each storm event. Sediment and gravel must be removed
from the traveled way immediately.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 110
Figure 4.18 – Curb and Gutter Barrier
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 111
Maintenance Standards
Catch basin filters must be inspected frequently, especially after storm events. If the insert
becomes clogged, it should be cleaned or replaced.
Stone filters: If the stone filter becomes clogged with sediment, the stones must be pulled away
from the inlet and cleaned or replaced.
Do not wash sediment into storm drains while cleaning. Spread all excavated material evenly
over the surrounding land area or stockpile and stabilize as appropriate.
Approved equivalents
The Washington State Department of Ecology has approved products as able to meet the
requirements of this BMP. Snohomish County may approve these products if they are used in
accordance with all requirements of this BMP and all instructions and specifications provided by
the manufacturer, plus additional requirements that may be established by the County.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 115
BMP C233: Silt Fence
Purpose
A silt fence reduces the transport of coarse sediment from a construction site by providing a
temporary physical barrier to sediment and reducing the runoff velocities of overland flow. See
Figure 4.21 for details on silt fence construction.
Conditions of Use
Silt fence may be used downslope of all disturbed areas.
Silt fence is not intended to treat concentrated flows, nor is it intended to treat substantial
amounts of overland flow. Any concentrated flows must be conveyed through the drainage
system to a sediment pond. The only circumstance in which overland flow can be treated solely
by a silt fence, rather than by a sediment pond, is when the area draining to the fence is one acre
or less and flow rates are less than 0.5 cfs.
Silt fences should not be constructed in streams or used in V-shaped ditches. They are not an
adequate method of silt control for anything deeper than sheet or overland flow.
Design and Installation Specifications
Use in combination with a sediment basin or other BMP.
The maximum slope steepness perpendicular to the fence line) shall be 1H:1V.
The maximum sheet or overland flow path length to the fence shall be 100 feet.
The maximum flow the silt fence shall be 0.5 cfs.
The geotextile used shall meet the standards set forth in 2008 WSDOT Standard Specifications,
Section 9-33.1 Geosynthetic Material Requirements, Table 6.
Standard strength fabrics shall be supported with wire mesh, chicken wire, 2-inch x 2-inch wire,
safety fence, or jute mesh to increase the strength of the fabric. Silt fence materials are available
that have synthetic mesh backing attached.
Filter fabric material shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum
of six months of expected usable construction life at a temperature range of 0°F. to 120°F.
100 percent biodegradable silt fence may be left in place after the project is completed.
Refer to Figure 4.21 for standard silt fence details.
The following Standard Notes shall be included in the construction documents.
The contractor shall install and maintain temporary silt fences at the locations shown in the
Plans.
The silt fences shall be constructed in the areas of clearing, grading, or drainage prior to
starting those activities.
The minimum height of the top of silt fence shall be 2 feet and the maximum height shall be
2½ feet above the original ground surface.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 116
The filter fabric shall be sewn together at the point of manufacture, or at an approved
location as determined by the Engineer, to form geotextile lengths as required. All sewn
seams shall be located at a support post. Alternatively, two sections of silt fence can be
overlapped, provided the contractor demonstrates to the satisfaction of the Engineer that the
overlap is long enough and that the adjacent fence sections are close enough together to
prevent silt laden water from escaping through the fence at the overlap.
The filter fabric shall be attached on the up-slope side of the posts and support system with
staples, wire, or in accordance with the manufacturer's recommendations. The filter fabric
shall be attached to the posts in a manner that reduces the potential for tearing at the staples,
wire, or other connection device.
Support the filter fabric with wire or plastic mesh, dependent on the properties of the filter
fabric selected for use. If wire or plastic mesh is used, the mesh shall be fastened securely to
the up-slope of the posts with the filter fabric upslope of the mesh.
Mesh support, if used, shall consist of steel wire with a maximum mesh spacing of 2 inches,
or a prefabricated polymeric mesh. The grab tensile strength of the mesh shall be at least 180
lbs. Polymeric mesh must have equivalent resistance to ultraviolet radiation as the filter
fabric used.
The filter fabric at the bottom of the fence shall be buried in a trench to a minimum depth of
4 inches below the ground surface. The trench shall be backfilled and the soil tamped in
place over the buried portion of the geotextile, such that no flow can pass beneath the fence
and scouring cannot occur. If wire or polymeric back-up support mesh is used, the wire or
polymeric mesh shall extend into the trench a minimum of 3 inches.
Fence posts shall be placed or driven a minimum of 18 inches, provided that a minimum
depth of 12 inches is allowed if topsoil or other soft subgrade soil is not present and a
minimum depth of 18 inches cannot be reached. Fence post depths shall be increased by 6
inches if the fence is located on slopes of 3H:1V or steeper and the slope is perpendicular to
the fence. If required post depths cannot be obtained, the posts shall be adequately secured
by bracing or guying to prevent overturning of the fence due to sediment loading.
Silt fences shall be located on contour as much as possible, except at the ends of the fence,
where the fence shall be turned uphill such that the silt fence captures the runoff water and
prevents water from flowing around the end of the fence.
If the fence must cross contours, with the exception of the ends of the fence, a gravel check
dam placed perpendicular to the back of the fence shall be used to minimize concentrated
flow and erosion along the back of the fence. The gravel check dam shall be approximately
1-foot deep at the back of the fence. The dam shall be continued perpendicular to the fence
at the same elevation until the top of the dam intercepts the ground surface behind the fence.
Gravel check dams shall consist of crushed surfacing base course, gravel backfill for walls,
or shoulder ballast. Gravel check dams shall be located every 10 feet along the fence where
the fence must cross contours. The slope of the fence line where contours must be crossed
shall not be steeper than 3H:1V.
Wood, steel or equivalent posts shall be used. Wood posts shall have minimum dimensions
of 2 inches by 2 inches by 3 feet minimum length, and shall be free of defects such as knots,
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 117
splits, or gouges. Steel posts shall consist of either size No. 6 rebar or larger, ASTM A 120
steel pipe with a minimum diameter of 1-inch, U, T, L, or C shape steel posts with a
minimum weight of 1.35 lbs./ft. or other steel posts having equivalent strength and bending
resistance to the post sizes listed. The spacing of the support posts shall be a maximum of 6
feet.
Fence back-up support, if used, shall consist of steel wire with a maximum mesh spacing of 2
inches, or a prefabricated polymeric mesh. The strength of the wire or polymeric mesh shall
be equivalent to or greater than 180 lbs. grab tensile strength. The polymeric mesh must be
as resistant to ultraviolet radiation as the geotextile it supports.
Refer to Figure 4.22 for slicing method details. Install silt fence using the slicing method
specification details follow.
The base of both end posts must be at least 2 to 4 inches above the top of the silt fence fabric
on the middle posts for ditch checks to drain properly. Use a hand level or string level, if
necessary, to mark base points before installation.
Install posts 3 to 4 feet apart in critical retention areas and 6 to 7 feet apart in standard
applications.
Install posts 24 inches deep on the downstream side of the silt fence, and as close as possible
to the fabric, enabling posts to support the fabric from upstream water pressure.
Install posts with the nipples facing away from the silt fence fabric.
Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric.
Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch
vertically apart. In addition, each tie should be positioned to hang on a post nipple when
tightening to prevent sagging.
Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties.
No more than 24 inches of a 36-inch fabric is allowed above ground level.
The installation should be checked and corrected for any deviation before compaction. Use a
flat-bladed shovel to tuck fabric deeper into the ground if necessary.
Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor,
skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side
first and then each side twice for a total of four trips.
Maintenance Standards
Repair damaged or deteriorated silt fence immediately
If concentrated flows are evident uphill of the fence, they must be intercepted and conveyed to a
sediment pond.
Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to flow
and causing channelization of flows parallel to the fence. If this occurs, replace the fence or
remove the trapped sediment.
January 2016 Snohomish County Drainage Manual Volume II - Construction Stormwater Pollution Prevention 118
Sediment deposits shall either be removed when the deposit reaches approximately one-third the
height of the silt fence, or a second silt fence shall be installed.
Figure 4.21 – Silt Fence
DRAFT
Page | 35
Appendix C – Correspondence
(Placeholder)
DRAFT
Page | 36
Appendix D – Site Inspection Form
Construction Stormwater Site Inspection Form
Page 1
Project
Name
Meadowdale Beach Park Recreation and Habitat Restoration Improvements Project
Permit #
Inspection
Date
Time
Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre
Print Name:
Approximate rainfall amount since the last inspection (in inches):
Approximate rainfall amount in the last 24 hours (in inches):
Current Weather Clear Cloudy Mist Rain Wind Fog
A. Type of inspection: Weekly Post Storm Event Other
B. Phase of Active Construction (check all that apply):
Pre Construction/installation of erosion/sediment
controls
Clearing/Demo/Grading Infrastructure/storm/roads
Concrete pours Vertical
Construction/buildings
Utilities
Offsite improvements Site temporary stabilized Final stabilization
C. Questions:
1. Were all areas of construction and discharge points inspected? Yes No
2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen Yes No
3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5) Yes No
4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?* Yes No
5. If yes to #4 was it reported to Ecology? Yes No
6. Is pH sampling required? pH range required is 6.5 to 8.5. Yes No
If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken,
and when.
*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33
cm or greater.
Sampling Results: Date:
Parameter Method (circle one) Result Other/Note
NTU cm pH
Turbidity tube, meter, laboratory
pH Paper, kit, meter
Construction Stormwater Site Inspection Form
Page 2
D. Check the observed status of all items. Provide “Action Required “details and dates.
Element # Inspection BMPs
Inspected
BMP needs
maintenance
BMP
failed
Action
required
(describe in
section F)
yes no n/a
1
Clearing
Limits
Before beginning land disturbing
activities are all clearing limits,
natural resource areas (streams,
wetlands, buffers, trees) protected
with barriers or similar BMPs? (high
visibility recommended)
2
Construction
Access
Construction access is stabilized
with quarry spalls or equivalent
BMP to prevent sediment from
being tracked onto roads?
Sediment tracked onto the road
way was cleaned thoroughly at the
end of the day or more frequent as
necessary.
3
Control Flow
Rates
Are flow control measures installed
to control stormwater volumes and
velocity during construction and do
they protect downstream
properties and waterways from
erosion?
If permanent infiltration ponds are
used for flow control during
construction, are they protected
from siltation?
4
Sediment
Controls
All perimeter sediment controls
(e.g. silt fence, wattles, compost
socks, berms, etc.) installed, and
maintained in accordance with the
Stormwater Pollution Prevention
Plan (SWPPP).
Sediment control BMPs (sediment
ponds, traps, filters etc.) have been
constructed and functional as the
first step of grading.
Stormwater runoff from disturbed
areas is directed to sediment
removal BMP.
5
Stabilize
Soils
Have exposed un-worked soils
been stabilized with effective BMP
to prevent erosion and sediment
deposition?
Construction Stormwater Site Inspection Form
Page 3
Element # Inspection BMPs
Inspected
BMP needs
maintenance
BMP
failed
Action
required
(describe in
section F)
yes no n/a
5
Stabilize Soils
Cont.
Are stockpiles stabilized from erosion,
protected with sediment trapping
measures and located away from drain
inlet, waterways, and drainage
channels?
Have soils been stabilized at the end of
the shift, before a holiday or weekend
if needed based on the weather
forecast?
6
Protect
Slopes
Has stormwater and ground water
been diverted away from slopes and
disturbed areas with interceptor dikes,
pipes and or swales?
Is off-site storm water managed separately from stormwater generated
on the site?
Is excavated material placed on uphill
side of trenches consistent with safety
and space considerations?
Have check dams been placed at
regular intervals within constructed
channels that are cut down a slope?
7
Drain Inlets
Storm drain inlets made operable
during construction are protected.
Are existing storm drains within the
influence of the project protected?
8
Stabilize
Channel and
Outlets
Have all on-site conveyance channels
been designed, constructed and
stabilized to prevent erosion from
expected peak flows?
Is stabilization, including armoring
material, adequate to prevent erosion
of outlets, adjacent stream banks,
slopes and downstream conveyance
systems?
9
Control
Pollutants
Are waste materials and demolition
debris handled and disposed of to
prevent contamination of stormwater?
Has cover been provided for all
chemicals, liquid products, petroleum
products, and other material?
Has secondary containment been
provided capable of containing 110%
of the volume?
Were contaminated surfaces cleaned
immediately after a spill incident?
Were BMPs used to prevent
contamination of stormwater by a pH
modifying sources?
Construction Stormwater Site Inspection Form
Page 4
Element # Inspection BMPs
Inspected
BMP needs
maintenance
BMP
failed
Action
required
(describe in
section F)
yes no n/a
9
Cont.
Wheel wash wastewater is handled
and disposed of properly.
10 Control
Dewatering
Concrete washout in designated areas. No washout or excess concrete on the
ground.
Dewatering has been done to an
approved source and in compliance
with the SWPPP.
Were there any clean non turbid
dewatering discharges?
11
Maintain
BMP
Are all temporary and permanent
erosion and sediment control BMPs
maintained to perform as intended?
12
Manage the
Project
Has the project been phased to the
maximum degree practicable?
Has regular inspection, monitoring and
maintenance been performed as
required by the permit?
Has the SWPPP been updated,
implemented and records maintained?
13
Protect LID
Is all Bioretention and Rain Garden
Facilities protected from
sedimentation with appropriate BMPs?
Is the Bioretention and Rain Garden
protected against over compaction of
construction equipment and foot
traffic to retain its infiltration
capabilities?
Permeable pavements are clean and
free of sediment and sediment laden-
water runoff. Muddy construction
equipment has not been on the base
material or pavement.
Have soiled permeable pavements
been cleaned of sediments and pass
infiltration test as required by stormwater manual methodology?
Heavy equipment has been kept off
existing soils under LID facilities to
retain infiltration rate.
E. Check all areas that have been inspected.
All in place BMPs All disturbed soils All concrete wash out area All material storage areas
All discharge locations All equipment storage areas All construction entrances/exits
Construction Stormwater Site Inspection Form
Page 5
F. Elements checked “Action Required” (section D) describe corrective action to be taken. List the element number;
be specific on location and work needed. Document, initial, and date when the corrective action has been completed
and inspected.
Element
#
Description and Location Action Required Completion
Date
Initials
Attach additional page if needed
Sign the following certification:
“I certify that this report is true, accurate, and complete, to the best of my knowledge and belief”
Inspected by: (print) (Signature) Date:
Title/Qualification of Inspector:
DRAFT
Page | 37
Appendix E – Construction Stormwater General Permit
(Placeholder)
DRAFT
Page | 38
Appendix F – 303(d) List Waterbodies / TMDL Waterbodies Information
(Placeholder)
DRAFT
Page | 39
Appendix G – Contaminated Site Information
(No Contamination Known at Site)
DRAFT
Page | 40
Appendix H – Engineering Calculations
(Placeholder)
Appendix E
Hydrologic Model Input and Results
————————————————————————————————— MGS FLOOD PROJECT REPORT
Program Version: MGSFlood 4.46 Program License Number: 200510001 Project Simulation Performed on: 02/02/2018 9:26 AM Report Generation Date: 02/02/2018 9:59 AM
—————————————————————————————————
Input File Name: Meadowdale.fld
Project Name: Meadowdale Analysis Title: Stormwater Drainage Basins Comments: ———————————————— PRECIPITATION INPUT ————————————————
Computational Time Step (Minutes): 15
Extended Precipitation Time Series Selected Climatic Region Number: 2 Full Period of Record Available used for Routing Precipitation Station : 95003605 Puget West 36 in_5min 10/01/1939-10/01/2097
Evaporation Station : 951036 Puget West 36 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 27.792 27.780 Area of Links that Include Precip/Evap (acres) 0.000 0.012 Total (acres) 27.792 27.792 ----------------------SCENARIO: EXISTING Number of Subbasins: 6 ---------- Subbasin : Area 1 - Road ---------- -------Area (Acres) -------- Till Forest 5.038 Till Grass 0.020 ROADS/FLAT 0.659 ----------------------------------------------
Subbasin Total 5.717 ---------- Subbasin : Area 2 - Ranger Residence ---------- -------Area (Acres) -------- Till Forest 0.746
Till Grass 0.125 ROADS/FLAT 0.137
---------------------------------------------- Subbasin Total 1.008 ---------- Subbasin : Area 3 - West of Ranger Residence ---------- -------Area (Acres) --------
Till Forest 2.781 Till Grass 1.342
ROADS/FLAT 0.326 ---------------------------------------------- Subbasin Total 4.449
---------- Subbasin : Area 4 - North of Creek ----------
-------Area (Acres) -------- Till Forest 11.518
ROADS/FLAT 0.279 ----------------------------------------------
Subbasin Total 11.797
---------- Subbasin : Area 5 - Railroad Berm and Beach ----------
-------Area (Acres) -------- Outwash Pasture 1.005
ROADS/FLAT 0.574 ----------------------------------------------
Subbasin Total 1.579
---------- Subbasin : Area 6 - Off-site Area ----------
-------Area (Acres) -------- Till Forest 3.111
ROADS/FLAT 0.131 ----------------------------------------------
Subbasin Total 3.242 ----------------------SCENARIO: PROPOSED Number of Subbasins: 7
---------- Subbasin : Area 1 - Road ---------- -------Area (Acres) -------- Till Forest 5.029 Till Grass 0.011 ROADS/FLAT 0.677 ----------------------------------------------
Subbasin Total 5.717
---------- Subbasin : Area 2 - Ranger Residence ---------- -------Area (Acres) -------- Till Forest 0.980 Till Grass 0.300 ROADS/FLAT 0.219
---------------------------------------------- Subbasin Total 1.499
---------- Subbasin : Area 3B - West of Ranger Not Draining to Rock Swale ---------- -------Area (Acres) -------- Till Forest 1.115 Till Grass 0.505
ROADS/FLAT 0.063 ----------------------------------------------
Subbasin Total 1.683 ---------- Subbasin : Area 4 - North of Creek ----------
-------Area (Acres) -------- Till Forest 11.563
ROADS/FLAT 0.234 ----------------------------------------------
Subbasin Total 11.797
---------- Subbasin : Area 5 - Railroad Berm and Beach ----------
-------Area (Acres) -------- Outwash Pasture 1.005
ROADS/FLAT 0.574 ----------------------------------------------
Subbasin Total 1.579
---------- Subbasin : Area 6 - Off-site Area ----------
-------Area (Acres) -------- Till Forest 3.111
ROADS/FLAT 0.131 ----------------------------------------------
Subbasin Total 3.242
---------- Subbasin : Area 3A - West of Ranger Draining to Rock Swale ---------- -------Area (Acres) -------- Till Forest 1.271
Till Grass 0.826 ROADS/FLAT 0.166
---------------------------------------------- Subbasin Total 2.263 ************************* LINK DATA *******************************
----------------------SCENARIO: EXISTING
Number of Links: 8 ------------------------------------------ Link Name: Area 1 Link Link Type: Copy
Downstream Link Name: Creek DS of Area 2
------------------------------------------ Link Name: Area 2 Link Link Type: Copy Downstream Link Name: Creek DS of Area 2
------------------------------------------ Link Name: Area 3 Link Link Type: Copy Downstream Link Name: Creek US of Berm
------------------------------------------ Link Name: Area 4 Link Link Type: Copy
Downstream Link Name: Creek US of Berm
------------------------------------------ Link Name: Area 5 Outfall Link Type: Copy
Downstream Link: None
------------------------------------------ Link Name: Area 6 Outfall Link Type: Copy
Downstream Link: None
------------------------------------------ Link Name: Creek DS of Area 2 Link Type: Copy
Downstream Link Name: Creek US of Berm ------------------------------------------ Link Name: Creek US of Berm Link Type: Copy
Downstream Link: None ************************* LINK DATA ******************************* ----------------------SCENARIO: PROPOSED
Number of Links: 11
------------------------------------------ Link Name: Area 1 Link Link Type: Copy Downstream Link Name: Swale
------------------------------------------ Link Name: Area 2 Link Link Type: Copy Downstream Link Name: Swale ------------------------------------------ Link Name: Area 3B Link Link Type: Copy
Downstream Link Name: Creek US of Berm ------------------------------------------ Link Name: Area 4 Link Link Type: Copy
Downstream Link Name: Creek US of Berm
------------------------------------------ Link Name: Area 5 Outfall Link Type: Copy
Downstream Link: None
------------------------------------------ Link Name: Area 6 Outfall Link Type: Copy
Downstream Link: None
------------------------------------------ Link Name: Creek DS of Area 2 Link Type: Copy
Downstream Link Name: Rock Swale
------------------------------------------ Link Name: Creek US of Berm Link Type: Copy
Downstream Link: None
------------------------------------------ Link Name: Swale Link Type: Bioretention Facility Downstream Link Name: Creek DS of Area 2
Base Elevation (ft) : 21.60 Riser Crest Elevation (ft) : 21.77
Storage Depth (ft) : 0.17 Bottom Length (ft) : 180.0 Bottom Width (ft) : 3.0 Side Slopes (ft/ft) : L1= 2.00 L2= 2.00 W1= 2.00 W2= 2.00 Bottom Area (sq-ft) : 540. Area at Riser Crest El (sq-ft) : 665.
(acres) : 0.015 Volume at Riser Crest (cu-ft) : 175.
(ac-ft) : 0.004 Infiltration on Bottom only Selected Soil Properties Biosoil Thickness (ft) : 0.67
Biosoil Saturated Hydraulic Conductivity (in/hr) : 2.00 Biosoil Porosity (Percent) : 20.00
Maximum Elevation of Bioretention Soil : 22.60 Native Soil Hydraulic Conductivity (in/hr) : 0.25
Riser Geometry Riser Structure Type : Rectangular
Riser Length (ft) : 2.00 Riser Width (ft) : 1.67
Common Length (ft) : 2.000 Riser Crest Elevation : 21.77 ft
Hydraulic Structure Geometry
Number of Devices: 0
------------------------------------------ Link Name: Area 3A Link
Link Type: Copy Downstream Link Name: Rock Swale
------------------------------------------ Link Name: Rock Swale
Link Type: Copy Downstream Link Name: Creek US of Berm
**********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: EXISTING Number of Subbasins: 6
Number of Links: 8 ********** Subbasin: Area 1 - Road ********** Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs) ======================================
2-Year 0.300 5-Year 0.408 10-Year 0.500 25-Year 0.613 50-Year 0.714 100-Year 0.739
200-Year 0.752
********** Subbasin: Area 2 - Ranger Residence ********** Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 6.578E-02
5-Year 9.474E-02 10-Year 0.115 25-Year 0.163 50-Year 0.166
100-Year 0.176 200-Year 0.180
********** Subbasin: Area 3 - West of Ranger Residence **********
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs) ======================================
2-Year 0.241 5-Year 0.408
10-Year 0.520 25-Year 0.669
50-Year 0.806 100-Year 0.870
200-Year 0.887
********** Subbasin: Area 4 - North of Creek **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.312
5-Year 0.487 10-Year 0.641
25-Year 0.791 50-Year 0.946 100-Year 0.968 200-Year 1.036 ********** Subbasin: Area 5 - Railroad Berm and Beach **********
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.207 5-Year 0.274
10-Year 0.300 25-Year 0.351
50-Year 0.449 100-Year 0.518 200-Year 0.542 ********** Subbasin: Area 6 - Off-site Area **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 9.563E-02
5-Year 0.149 10-Year 0.191
25-Year 0.230 50-Year 0.286
100-Year 0.293 200-Year 0.309
********** Link: Area 1 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.300
5-Year 0.408 10-Year 0.500
25-Year 0.613 50-Year 0.714
100-Year 0.739 200-Year 0.752
********** Link: Area 1 Link ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.300 5-Year 0.408 10-Year 0.500
25-Year 0.613 50-Year 0.714
100-Year 0.739 200-Year 0.752 ********** Link: Area 2 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 6.578E-02 5-Year 9.474E-02 10-Year 0.115
25-Year 0.163 50-Year 0.166
100-Year 0.176 200-Year 0.180
********** Link: Area 2 Link ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 6.578E-02
5-Year 9.474E-02 10-Year 0.115
25-Year 0.163 50-Year 0.166
100-Year 0.176 200-Year 0.180
********** Link: Area 3 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.241 5-Year 0.408 10-Year 0.520
25-Year 0.669 50-Year 0.806
100-Year 0.870 200-Year 0.887 ********** Link: Area 3 Link ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.241 5-Year 0.408 10-Year 0.520
25-Year 0.669 50-Year 0.806
100-Year 0.870 200-Year 0.887 ********** Link: Area 4 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.312
5-Year 0.487 10-Year 0.641
25-Year 0.791 50-Year 0.946
100-Year 0.968 200-Year 1.036
********** Link: Area 4 Link ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.312
5-Year 0.487 10-Year 0.641
25-Year 0.791 50-Year 0.946
100-Year 0.968 200-Year 1.036
********** Link: Area 5 Outfall ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.207 5-Year 0.274 10-Year 0.300
25-Year 0.351 50-Year 0.449
100-Year 0.518 200-Year 0.542 ********** Link: Area 5 Outfall ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.207 5-Year 0.274 10-Year 0.300
25-Year 0.351 50-Year 0.449
100-Year 0.518 200-Year 0.542
********** Link: Area 6 Outfall ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 9.563E-02
5-Year 0.149 10-Year 0.191
25-Year 0.230 50-Year 0.286
100-Year 0.293 200-Year 0.309
********** Link: Area 6 Outfall ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 9.563E-02 5-Year 0.149 10-Year 0.191
25-Year 0.230 50-Year 0.286
100-Year 0.293 200-Year 0.309 ********** Link: Creek DS of Area 2 ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.368 5-Year 0.502 10-Year 0.611
25-Year 0.777 50-Year 0.879
100-Year 0.915 200-Year 0.929 ********** Link: Creek US of Berm ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.866
5-Year 1.368 10-Year 1.693
25-Year 1.982 50-Year 2.630
100-Year 2.730 200-Year 2.746
********** Link: Creek US of Berm ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.866
5-Year 1.368 10-Year 1.693
25-Year 1.982 50-Year 2.630
100-Year 2.730 200-Year 2.746
----------------------SCENARIO: PROPOSED
Number of Subbasins: 7 Number of Links: 11
********** Subbasin: Area 1 - Road ********** Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.305
5-Year 0.413 10-Year 0.507 25-Year 0.627 50-Year 0.720 100-Year 0.745 200-Year 0.759
********** Subbasin: Area 2 - Ranger Residence ********** Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ======================================
2-Year 0.110 5-Year 0.163
10-Year 0.197 25-Year 0.273 50-Year 0.290 100-Year 0.303
200-Year 0.311
********** Subbasin: Area 3B - West of Ranger Not Draining to Rock Swale **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 7.199E-02
5-Year 0.132 10-Year 0.174
25-Year 0.206 50-Year 0.274
100-Year 0.298 200-Year 0.302
********** Subbasin: Area 4 - North of Creek **********
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.303 5-Year 0.474
10-Year 0.627 25-Year 0.782
50-Year 0.923 100-Year 0.945 200-Year 1.016 ********** Subbasin: Area 5 - Railroad Berm and Beach **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.207 5-Year 0.274 10-Year 0.300
25-Year 0.351 50-Year 0.449
100-Year 0.518 200-Year 0.542 ********** Subbasin: Area 6 - Off-site Area **********
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 9.563E-02 5-Year 0.149
10-Year 0.191 25-Year 0.230
50-Year 0.286 100-Year 0.293
200-Year 0.309
********** Subbasin: Area 3A - West of Ranger Draining to Rock Swale **********
Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.132
5-Year 0.227 10-Year 0.287
25-Year 0.379 50-Year 0.449
100-Year 0.485 200-Year 0.496
********** Link: Area 1 Link ********** Link Inflow Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.305 5-Year 0.413 10-Year 0.507 25-Year 0.627 50-Year 0.720
100-Year 0.745 200-Year 0.759
********** Link: Area 1 Link ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.305 5-Year 0.413 10-Year 0.507 25-Year 0.627 50-Year 0.720
100-Year 0.745 200-Year 0.759
********** Link: Area 2 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.110
5-Year 0.163 10-Year 0.197
25-Year 0.273 50-Year 0.290
100-Year 0.303 200-Year 0.311
********** Link: Area 2 Link ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.110
5-Year 0.163 10-Year 0.197 25-Year 0.273 50-Year 0.290
100-Year 0.303 200-Year 0.311
********** Link: Area 3B Link ********** Link Inflow Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 7.199E-02 5-Year 0.132 10-Year 0.174 25-Year 0.206 50-Year 0.274
100-Year 0.298 200-Year 0.302
********** Link: Area 3B Link ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 7.199E-02 5-Year 0.132 10-Year 0.174
25-Year 0.206 50-Year 0.274
100-Year 0.298 200-Year 0.302
********** Link: Area 4 Link ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.303
5-Year 0.474 10-Year 0.627
25-Year 0.782 50-Year 0.923
100-Year 0.945 200-Year 1.016
********** Link: Area 4 Link ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.303 5-Year 0.474 10-Year 0.627 25-Year 0.782 50-Year 0.923
100-Year 0.945 200-Year 1.016
********** Link: Area 5 Outfall ********** Link Inflow Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.207 5-Year 0.274 10-Year 0.300 25-Year 0.351 50-Year 0.449
100-Year 0.518 200-Year 0.542
********** Link: Area 5 Outfall ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.207
5-Year 0.274 10-Year 0.300
25-Year 0.351 50-Year 0.449
100-Year 0.518 200-Year 0.542
********** Link: Area 6 Outfall ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 9.563E-02
5-Year 0.149 10-Year 0.191 25-Year 0.230 50-Year 0.286
100-Year 0.293 200-Year 0.309
********** Link: Area 6 Outfall ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 9.563E-02 5-Year 0.149 10-Year 0.191 25-Year 0.230 50-Year 0.286
100-Year 0.293 200-Year 0.309
********** Link: Creek DS of Area 2 ********** Link Inflow Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.411 5-Year 0.565 10-Year 0.679
25-Year 0.896 50-Year 0.993
100-Year 0.998 200-Year 1.039
********** Link: Creek US of Berm ********** Link Inflow
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.860
5-Year 1.358 10-Year 1.689
25-Year 1.984 50-Year 2.637
100-Year 2.727 200-Year 2.737
********** Link: Creek US of Berm ********** Link Outflow 1 Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.860 5-Year 1.358 10-Year 1.689 25-Year 1.984 50-Year 2.637
100-Year 2.727 200-Year 2.737
********** Link: Swale ********** Link Inflow Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.420 5-Year 0.573 10-Year 0.693 25-Year 0.919 50-Year 1.002
100-Year 1.048 200-Year 1.063
********** Link: Swale ********** Link Outflow 1
Frequency Stats Flood Frequency Data(cfs)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs)
====================================== 2-Year 0.411
5-Year 0.565 10-Year 0.679
25-Year 0.896 50-Year 0.993
100-Year 0.998 200-Year 1.039
********** Link: Swale ********** Link WSEL
Stats WSEL Frequency Data(ft)
(Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) WSEL Peak (ft)
====================================== 1.05-Year 21.816
1.11-Year 21.821 1.25-Year 21.827 2.00-Year 21.840 3.33-Year 21.851
5-Year 21.856 10-Year 21.868
25-Year 21.886 50-Year 21.895 100-Year 21.895
********** Link: Area 3A Link ********** Link Inflow Frequency Stats
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.132 5-Year 0.227
10-Year 0.287 25-Year 0.379
50-Year 0.449 100-Year 0.485 200-Year 0.496
********** Link: Area 3A Link ********** Link Outflow 1 Frequency Stats
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ======================================
2-Year 0.132 5-Year 0.227
10-Year 0.287 25-Year 0.379
50-Year 0.449 100-Year 0.485
200-Year 0.496
********** Link: Rock Swale ********** Link Inflow Frequency Stats
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position)
Tr (yrs) Flood Peak (cfs) ======================================
2-Year 0.523 5-Year 0.782
10-Year 0.977 25-Year 1.298
50-Year 1.438 100-Year 1.482
200-Year 1.532
********** Link: Rock Swale ********** Link Outflow 1 Frequency Stats
Flood Frequency Data(cfs) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) Flood Peak (cfs) ====================================== 2-Year 0.523 5-Year 0.782
10-Year 0.977 25-Year 1.298
50-Year 1.438 100-Year 1.482 200-Year 1.532 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures
Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Area 1 - Road 773.329 Subbasin: Area 2 - Ranger Resi 128.014
Subbasin: Area 3 - West of Ran 574.152 Subbasin: Area 4 - North of Cr 1762.945
Subbasin: Area 5 - Railroad Be 293.814 Subbasin: Area 6 - Off-site Ar 476.170 Link: Area 1 Link 0.000 Link: Area 2 Link 0.000
Link: Area 3 Link 0.000 Link: Area 4 Link 0.000
Link: Area 5 Outfall 0.000 Link: Area 6 Outfall 0.000
Link: Creek DS of Area 2 0.000 Link: Creek US of Berm 0.000
_____________________________________ Total: 4008.424
Total Post Developed Recharge During Simulation
Model Element Recharge Amount (ac-ft) -----------------------------------------------------------------------------------------------
Subbasin: Area 1 - Road 770.956 Subbasin: Area 2 - Ranger Resi 183.194
Subbasin: Area 3B - West of Ra 226.540 Subbasin: Area 4 - North of Cr 1769.833
Subbasin: Area 5 - Railroad Be 293.814 Subbasin: Area 6 - Off-site Ar 476.170
Subbasin: Area 3A - West of Ra 285.936 Link: Area 1 Link 0.000
Link: Area 2 Link 0.000 Link: Area 3B Link 0.000
Link: Area 4 Link 0.000 Link: Area 5 Outfall 0.000 Link: Area 6 Outfall 0.000 Link: Creek DS of Area 2 0.000
Link: Creek US of Berm 0.000 Link: Swale 157.121
Link: Area 3A Link 0.000 Link: Rock Swale 0.000 _____________________________________ Total: 4163.563 Total Predevelopment Recharge is Less than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 25.370 ac-ft/year, Post Developed: 26.352 ac-ft/year
***********Water Quality Facility Data ************* ----------------------SCENARIO: EXISTING Number of Links: 8
********** Link: Area 1 Link ********** Basic Wet Pond Volume (91% Exceedance): 10147. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 15221. cu-ft 2-Year Discharge Rate : 0.300 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.15 cfs Off-line Design Discharge Rate (91% Exceedance): 0.08 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 650.79
Inflow Volume Including PPT-Evap (ac-ft): 650.79 Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 650.79
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 2 Link **********
Basic Wet Pond Volume (91% Exceedance): 1845. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 2767. cu-ft
2-Year Discharge Rate : 0.066 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 133.17 Inflow Volume Including PPT-Evap (ac-ft): 133.17 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 133.17 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ********** Link: Area 3 Link ********** Basic Wet Pond Volume (91% Exceedance): 8159. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 12238. cu-ft
2-Year Discharge Rate : 0.241 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.11 cfs Off-line Design Discharge Rate (91% Exceedance): 0.06 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 573.73
Inflow Volume Including PPT-Evap (ac-ft): 573.73 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 573.73 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 4 Link **********
Basic Wet Pond Volume (91% Exceedance): 20244. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 30367. cu-ft
2-Year Discharge Rate : 0.312 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.26 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.14 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 989.37 Inflow Volume Including PPT-Evap (ac-ft): 989.37
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 989.37 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 5 Outfall **********
Basic Wet Pond Volume (91% Exceedance): 2924. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 4386. cu-ft
2-Year Discharge Rate : 0.207 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.09 cfs Off-line Design Discharge Rate (91% Exceedance): 0.05 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 229.71 Inflow Volume Including PPT-Evap (ac-ft): 229.71 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 229.71
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 6 Outfall ********** Basic Wet Pond Volume (91% Exceedance): 5540. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 8310. cu-ft
2-Year Discharge Rate : 0.096 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.07 cfs Off-line Design Discharge Rate (91% Exceedance): 0.04 cfs Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 289.46 Inflow Volume Including PPT-Evap (ac-ft): 289.46
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 289.46 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Creek DS of Area 2 **********
Basic Wet Pond Volume (91% Exceedance): 12022. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 18033. cu-ft
2-Year Discharge Rate : 0.368 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.18 cfs Off-line Design Discharge Rate (91% Exceedance): 0.10 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 783.96
Inflow Volume Including PPT-Evap (ac-ft): 783.96 Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 783.96
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Creek US of Berm ********** Basic Wet Pond Volume (91% Exceedance): 39964. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 59946. cu-ft
2-Year Discharge Rate : 0.866 cfs 15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.53 cfs Off-line Design Discharge Rate (91% Exceedance): 0.29 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 2347.06 Inflow Volume Including PPT-Evap (ac-ft): 2347.06 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2347.06 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ----------------------SCENARIO: PROPOSED Number of Links: 11 ********** Link: Area 1 Link **********
Basic Wet Pond Volume (91% Exceedance): 10191. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 15286. cu-ft 2-Year Discharge Rate : 0.305 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.15 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.08 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 655.74 Inflow Volume Including PPT-Evap (ac-ft): 655.74
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 655.74 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 2 Link **********
Basic Wet Pond Volume (91% Exceedance): 2839. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 4258. cu-ft
2-Year Discharge Rate : 0.110 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.04 cfs Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 213.96
Inflow Volume Including PPT-Evap (ac-ft): 213.96 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 213.96 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 3B Link **********
Basic Wet Pond Volume (91% Exceedance): 3054. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 4581. cu-ft 2-Year Discharge Rate : 0.072 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.04 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.02 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 197.27 Inflow Volume Including PPT-Evap (ac-ft): 197.27
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 197.27 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 4 Link **********
Basic Wet Pond Volume (91% Exceedance): 20159. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 30238. cu-ft
2-Year Discharge Rate : 0.303 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.26 cfs Off-line Design Discharge Rate (91% Exceedance): 0.14 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 974.81
Inflow Volume Including PPT-Evap (ac-ft): 974.81 Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 974.81
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 5 Outfall **********
Basic Wet Pond Volume (91% Exceedance): 2924. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 4386. cu-ft
2-Year Discharge Rate : 0.207 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.09 cfs Off-line Design Discharge Rate (91% Exceedance): 0.05 cfs Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 229.71 Inflow Volume Including PPT-Evap (ac-ft): 229.71
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 229.71 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Area 6 Outfall **********
Basic Wet Pond Volume (91% Exceedance): 5540. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 8310. cu-ft 2-Year Discharge Rate : 0.096 cfs 15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.07 cfs Off-line Design Discharge Rate (91% Exceedance): 0.04 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 289.46
Inflow Volume Including PPT-Evap (ac-ft): 289.46 Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 289.46
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Creek DS of Area 2 **********
Basic Wet Pond Volume (91% Exceedance): 13788. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 20681. cu-ft
2-Year Discharge Rate : 0.411 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.21 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.11 cfs
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 718.48 Inflow Volume Including PPT-Evap (ac-ft): 718.48
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 718.48 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Creek US of Berm ********** Basic Wet Pond Volume (91% Exceedance): 41280. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 61920. cu-ft 2-Year Discharge Rate : 0.860 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge
On-line Design Discharge Rate (91% Exceedance): 0.54 cfs Off-line Design Discharge Rate (91% Exceedance): 0.30 cfs Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 2196.25
Inflow Volume Including PPT-Evap (ac-ft): 2196.25 Total Runoff Infiltrated (ac-ft): 0.00, 0.00%
Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 2196.25 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ********** Link: Swale **********
Basic Wet Pond Volume (91% Exceedance): 13033. cu-ft
Computed Large Wet Pond Volume, 1.5*Basic Volume: 19549. cu-ft 2-Year Discharge Rate : 0.411 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.19 cfs
Off-line Design Discharge Rate (91% Exceedance): 0.11 cfs
Time to Infiltrate 91% Treatment Volume, (Hours): 1046.14
Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 869.71 Inflow Volume Including PPT-Evap (ac-ft): 874.90
Total Runoff Infiltrated (ac-ft): 157.12, 17.96% Total Runoff Filtered (ac-ft): 0.00, 0.00%
Primary Outflow To Downstream System (ac-ft): 718.48 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 17.96%
********** Link: Area 3A Link **********
Basic Wet Pond Volume (91% Exceedance): 4223. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 6335. cu-ft
2-Year Discharge Rate : 0.132 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.06 cfs Off-line Design Discharge Rate (91% Exceedance): 0.03 cfs
Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 305.70 Inflow Volume Including PPT-Evap (ac-ft): 305.70 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 305.70
Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
********** Link: Rock Swale ********** Basic Wet Pond Volume (91% Exceedance): 18020. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 27029. cu-ft
2-Year Discharge Rate : 0.523 cfs
15-Minute Timestep, Water Quality Treatment Design Discharge On-line Design Discharge Rate (91% Exceedance): 0.26 cfs Off-line Design Discharge Rate (91% Exceedance): 0.14 cfs Infiltration/Filtration Statistics--------------------
Inflow Volume (ac-ft): 1024.17 Inflow Volume Including PPT-Evap (ac-ft): 1024.17
Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1024.17 Secondary Outflow To Downstream System (ac-ft): 0.00
Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00%
***********Compliance Point Results *************
Scenario Existing Compliance Link: Creek DS of Area 2
Scenario Proposed Compliance Link: Creek DS of Area 2 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position
Predevelopment Runoff Postdevelopment Runoff
Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ----------------------------------------------------------------------------------------------------------------------
2-Year 0.368 2-Year 0.411 5-Year 0.502 5-Year 0.565
10-Year 0.611 10-Year 0.679 25-Year 0.777 25-Year 0.896
50-Year 0.879 50-Year 0.993 100-Year 0.915 100-Year 0.998
200-Year 0.929 200-Year 1.039 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals
**** Flow Duration Performance **** Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): 24.3% FAIL
Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): 53.7% FAIL Maximum Excursion from Q2 to Q50 (Must be less than 10%): 99999.0% FAIL
Percent Excursion from Q2 to Q50 (Must be less than 50%): 100.0% FAIL ------------------------------------------------------------------------------------------------- FLOW DURATION DESIGN CRITERIA: FAIL -------------------------------------------------------------------------------------------------
**** LID Duration Performance ****
Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): -3.0% PASS Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 24.3% FAIL ------------------------------------------------------------------------------------------------- LID DURATION DESIGN CRITERIA: FAIL -------------------------------------------------------------------------------------------------
Appendix F
Hydraulic Analysis and Facility Sizing
Calculations
Wet Biofiltration Swale Sizing
(Per Dept of Ecology Stormwater Management Manual for Western Washington (SMMWW), Volume 5, Chapter 9)
Project: Meadowdale Beach Park Recreation and Habitat Improvement Project
Engineer: David Rice
PRELIMINARY STEPS blue-user input
red-calculated value
P-1:Q2-YR=0.411 CFS (From Model)
Q WQ =Q 2-YR X Ratio (Based on Effective Impervious Area (EIA)
EIA= 15%
Ratio= 0.33 (15 Min Data, Table 4.1)
QWQ=0.136 CFS (15 Min Data, Using Factor From Table 4.1)
QWQ=0.190 CFS (From Model with WWHM)
QWQ=0.190 CFS - USE THIS VALUE
P-2:Slope (s)=0.020 ( 0.02 max for wet bioswale)
P-3:Cover:Grass Mixture, Infrequently Mowed
DESIGN STEPS
D-1:Depth (y)=4.0 IN (4" Max for wet bioswale)
D-2:n =0.30 (per Table V-9.4.1)
D-3:Shape:Trapezoidal
D-4:Bottom Width (b) (From Manning's Equation)
Q=1.49(A)(R)2/3(S)0.5/n
Where:
y=4.0 IN
b=3.0 FT
Sideslope (Z)=2.5 FT/FT
D-5:Area (A)=1.278 FT2
Hyd. Rad. (R)=0.266 FT
Q>or=QWQ=0.371 CFS (Make equal to or greater than QWQ by adjusting y, b, s, or Z)
D-6:Velocity (V)=0.29 FT/S (V=Q/A, 1 FPS max per Table 9.1, if more increase b or y)
D-7:Length (L)=157.0 FT (L=V x t, t=9 min. Adjust y, b, s or Z to optimize L)
CHECK FOR CHANNEL STABILITY (FOR FLOWS GREATER THAN Q WQ )
SC-1:Q100-YR=0.998 CFS (From WWHM)
QSC=1.597 CFS (Q100-YR x 1.6)
SC-2:Vegetation:8-inch mowed height, fair coverage
SC-3:Retardance:C (per Table V-9.4.2)
SC-4:Trial "n":0.055 (per Table V-9.4.1 for mowed infrequently)
SC-5:VRapprox=2 FT2/S (per Figure V-9.4.7)
SC-6:Vmax=3 FT/S (per Table V-9.4.2)
R=0.667 R=VRapprox/Vmax
SC-7:VRactual=1.9 FT2/S (per manning's formula using R from above)
SC-8:Difference=3%(Adjust n and VRapprox until VRactual is within 5% of Vrapprox, 0.033 min)
SC-9:Vactual=2.92 FT/S
SC-10:ASC=0.55 FT2
SC-11:ASC<ACAP?TRUE (ASC should be less than ACAP=area calc'd for D-5)
SC-12:ySC=1.95 IN
ASC=0.55 (Adjust ysc until this equals the area calc'd in SC-10)
SC-13:Freeboard=2.30 FEET
yTOTAL=31.60 IN
SC-14:RTOTAL=1.47 FT
ATOTAL=25.24 FT2
SC-15:QTOTAL=22.93 CFS (Should be greater thank QSC)
Biofiltration Swale Sizing(Per DOE Stormwater Management Manual for Western Washington (SMMWW), Volume 5, Chapter 9)Project: Meadowdale Beach Park Recreation and Habitat Improvement ProjectEngineer: David RiceBed Width:3.0ftSlope:0.02ftSide Slopes:2.5ft/ftTable Calculates Overall Swale Width Based on User Input Top of Slope Elevations:Distance - Ctr to Top of Slope Top of Slope Elev.StationBed Elev.(ft)Left(ft)Right(ft)Left(ft)Right(ft)X Section Area (ft^2)Inc. Volume (ft^3)0276.50 6.5029.00 29.00 16.001026.80 5.75 5.7528.50 28.50 12.33 141.632026.60 5.00 5.0028.00 28.00 9.10 107.133026.40 4.25 4.2527.50 27.50 6.32 77.124026.20 4.12 4.1227.25 27.25 5.91 61.165026.00 4.00 4.0027.00 27.00 5.50 57.036025.80 3.25 3.2526.50 26.50 3.32 44.127025.60 3.12 3.1226.25 26.25 3.01 31.668024.40 5.50 5.5026.00 26.00 11.20 71.039024.20 4.75 4.7525.50 25.50 8.13 96.6310024.00 4.63 4.6325.25 25.25 7.66 78.9111023.80 4.50 4.5025.00 25.00 7.20 74.2812023.60 3.75 3.7524.50 24.50 4.72 59.6213023.40 3.62 3.6224.25 24.25 4.36 45.4114023.20 5.37 5.3724.75 24.75 10.66 75.0615022.00 5.25 5.2523.50 23.50 10.13 103.9116021.80 5.13 5.1323.25 23.25 9.61 98.6617021.60 4.38 4.3822.75 22.75 6.76 81.8118021.55 3.88 3.8822.50 22.50 5.11 59.3118521.50 3.38 3.3822.25 22.25 3.66 21.911,386 10,371 gallons0.03acre-ft51.35 cu-yd
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification
Rock
Swale A1 Normal Depth (ft) 0.55
Rim/Overflow Elev. (ft) 12.00 21.10 Critical Depth (ft) 0.64
Invert Elevation (ft)11.00 11.88 Froude No. 1.36
Water Surf. Elev. (ft)12.00 12.94 Avg. Velocity (fps) 4.26
Min. Velocity (fps) 2.86
Discharge (cfs) 2.25 Max. Velocity (fps) 5.11
Diameter (inches) 12 Normal Velocity (fps) 5.11
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.23
Length (feet) 88
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.01
10.5
11.0
11.5
12.0
12.5
13.0
13.5
-20 0 20 40 60 80 100 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification A2 A1 Normal Depth (ft) 0.20
Rim/Overflow Elev. (ft) 21.10 19.75 Critical Depth (ft) 0.23
Invert Elevation (ft)16.18 16.75 Froude No. 1.35
Water Surf. Elev. (ft)16.51 17.11 Avg. Velocity (fps) 2.71
Min. Velocity (fps) 1.43
Discharge (cfs) 0.25 Max. Velocity (fps) 2.89
Diameter (inches) 8 Normal Velocity (fps) 2.89
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 2.33
Length (feet) 57
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.01
16.0
16.2
16.4
16.6
16.8
17.0
17.2
17.4
17.6
-10 0 10 20 30 40 50 60 70 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification A1 A3 Normal Depth (ft) 0.42
Rim/Overflow Elev. (ft) 21.10 23.57 Critical Depth (ft) 0.60
Invert Elevation (ft)16.96 18.80 Froude No. 2.02
Water Surf. Elev. (ft)17.46 19.78 Avg. Velocity (fps) 6.42
Min. Velocity (fps) 6.42
Discharge (cfs) 2.00 Max. Velocity (fps) 6.42
Diameter (inches) 12 Normal Velocity (fps) 6.42
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.04
Length (feet) 92
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.02
16.5
17.0
17.5
18.0
18.5
19.0
19.5
20.0
-20 0 20 40 60 80 100 120 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification A3
Bioswale
Outlet Normal Depth (ft) 0.51
Rim/Overflow Elev. (ft) 23.57 22.21 Critical Depth (ft) 0.60
Invert Elevation (ft)18.82 18.88 Froude No. 1.38
Water Surf. Elev. (ft)19.78 19.86 Avg. Velocity (fps) 2.61
Min. Velocity (fps) 2.58
Discharge (cfs) 2.00 Max. Velocity (fps) 2.65
Diameter (inches) 12 Normal Velocity (fps) 4.97
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.04
Length (feet) 6
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.01
18.6
18.8
19.0
19.2
19.4
19.6
19.8
20.0
-101234567Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification
Bioswale
Inlet B1 Normal Depth (ft) 0.51
Rim/Overflow Elev. (ft) 29.00 30.50 Critical Depth (ft) 0.60
Invert Elevation (ft)27.70 27.94 Froude No. 1.38
Water Surf. Elev. (ft)28.70 28.92 Avg. Velocity (fps) 2.69
Min. Velocity (fps) 2.55
Discharge (cfs) 2.00 Max. Velocity (fps) 2.91
Diameter (inches) 12 Normal Velocity (fps) 4.97
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.04
Length (feet) 24
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.010
27.6
27.8
28.0
28.2
28.4
28.6
28.8
29.0
29.2
-5 0 5 10 15 20 25 30 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B1 B2 Normal Depth (ft) 0.39
Rim/Overflow Elev. (ft) 30.50 35.22 Critical Depth (ft) 0.60
Invert Elevation (ft)27.97 30.57 Froude No. 2.27
Water Surf. Elev. (ft)28.92 31.55 Avg. Velocity (fps) 6.80
Min. Velocity (fps) 2.59
Discharge (cfs) 2.00 Max. Velocity (fps) 6.97
Diameter (inches) 12 Normal Velocity (fps) 6.97
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.04
Length (feet) 104
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.025
27.5
28.0
28.5
29.0
29.5
30.0
30.5
31.0
31.5
32.0
-20 0 20 40 60 80 100 120 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B2 B3 Normal Depth (ft) 0.45
Rim/Overflow Elev. (ft) 35.22 36.21 Critical Depth (ft) 0.60
Invert Elevation (ft)30.60 32.31 Froude No. 1.73
Water Surf. Elev. (ft)31.55 33.29 Avg. Velocity (fps) 5.41
Min. Velocity (fps) 2.59
Discharge (cfs) 2.00 Max. Velocity (fps) 5.78
Diameter (inches) 12 Normal Velocity (fps) 5.78
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 4.04
Length (feet) 114
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.015
30.0
30.5
31.0
31.5
32.0
32.5
33.0
33.5
-20 0 20 40 60 80 100 120 140 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B3 B4 Normal Depth (ft) 0.18
Rim/Overflow Elev. (ft) 36.21 36.60 Critical Depth (ft) 0.23
Invert Elevation (ft)32.33 32.81 Froude No. 1.66
Water Surf. Elev. (ft)33.29 33.17 Avg. Velocity (fps) 0.74
Min. Velocity (fps) 0.72
Discharge (cfs) 0.25 Max. Velocity (fps) 0.90
Diameter (inches) 8 Normal Velocity (fps) 3.35
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 2.33
Length (feet) 32
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.0150
32.2
32.4
32.6
32.8
33.0
33.2
33.4
33.6
-5 0 5 10 15 20 25 30 35 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B3 B5 Normal Depth (ft) 0.42
Rim/Overflow Elev. (ft) 36.21 37.28 Critical Depth (ft) 0.56
Invert Elevation (ft)32.33 33.25 Froude No. 1.75
Water Surf. Elev. (ft)33.29 34.16 Avg. Velocity (fps) 4.70
Min. Velocity (fps) 2.25
Discharge (cfs) 1.75 Max. Velocity (fps) 5.59
Diameter (inches) 12 Normal Velocity (fps) 5.59
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 3.84
Length (feet) 61
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.0151
32.0
32.5
33.0
33.5
34.0
34.5
-10 0 10 20 30 40 50 60 70 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B5 B6 Normal Depth (ft) 0.18
Rim/Overflow Elev. (ft) 37.28 38.10 Critical Depth (ft) 0.23
Invert Elevation (ft)33.28 33.73 Froude No. 1.66
Water Surf. Elev. (ft)34.16 34.09 Avg. Velocity (fps) 0.78
Min. Velocity (fps) 0.72
Discharge (cfs) 0.25 Max. Velocity (fps) 1.03
Diameter (inches) 8 Normal Velocity (fps) 3.35
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 2.33
Length (feet) 30
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.0150
33.2
33.4
33.6
33.8
34.0
34.2
34.4
34.6
-5 0 5 10 15 20 25 30 35 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B5 B7 Normal Depth (ft) 0.26
Rim/Overflow Elev. (ft) 37.28 41.00 Critical Depth (ft) 0.52
Invert Elevation (ft)33.28 36.95 Froude No. 3.84
Water Surf. Elev. (ft)34.16 37.78 Avg. Velocity (fps) 9.34
Min. Velocity (fps) 9.34
Discharge (cfs) 1.50 Max. Velocity (fps) 9.34
Diameter (inches) 12 Normal Velocity (fps) 9.34
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 3.64
Length (feet) 52
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.0706
33.0
34.0
35.0
36.0
37.0
38.0
39.0
-10 0 10 20 30 40 50 60 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B7 B8 Normal Depth (ft) 0.25
Rim/Overflow Elev. (ft) 41.00 44.26 Critical Depth (ft) 0.52
Invert Elevation (ft)36.98 40.34 Froude No. 4.09
Water Surf. Elev. (ft)37.78 41.17 Avg. Velocity (fps) 9.77
Min. Velocity (fps) 9.77
Discharge (cfs) 1.50 Max. Velocity (fps) 9.77
Diameter (inches) 12 Normal Velocity (fps) 9.77
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 3.64
Length (feet) 42
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.0800
37.0
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
42.0
-5 0 5 10 15 20 25 30 35 40 45 50 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Standard Step Backwater Analysis
System: Meadowdale Beach Park
Design Event: High Flow (100-year event)
Outlet Inlet
Identification B8 B9 Normal Depth (ft) 0.23
Rim/Overflow Elev. (ft) 44.60 51.00 Critical Depth (ft) 0.52
Invert Elevation (ft)40.37 46.12 Froude No. 4.88
Water Surf. Elev. (ft)41.17 46.95 Avg. Velocity (fps) 11.11
Min. Velocity (fps) 11.11
Discharge (cfs) 1.50 Max. Velocity (fps) 11.11
Diameter (inches) 12 Normal Velocity (fps) 11.11
Ineffective Depth( ft) 0.00 Crit. Velocity (fps) 3.64
Length (feet) 50
Manning n 0.012
Entrance Vel. (fps) 0.00
Entrance Loss (Ke) 0.50
Slope 0.1150
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
-10 0 10 20 30 40 50 60 Elevation (feet)Horizontal Distance (feet)HGL
Normal Depth
Critical Depth
Pipe
Outlet Inlet
Appendix G
BMP Selection and Treatment Menus
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 18
List #2: On-site Stormwater Management BMPs for Projects Triggering Minimum
Requirements 1 through 9
For each surface, consider the BMPs in the order listed for that type of surface. Use the first
BMP that is considered feasible. Feasibility shall be determined according to specific criteria set
forth for each BMP as described in Volumes III and V of this manual, and based in part on the
information in the Soils Report prepared as part of the required Stormwater Site Plan described
Chapter 3 of this volume. If a BMP is determined to be feasible for a surface, no other on-site
stormwater management BMP is necessary for that surface. An on-site stormwater management
BMP shall not be required for a surface if it is determined that no BMP is feasible for that
surface. In addition, Snohomish County may remove or reduce the requirement for a BMP if its
implementation will conflict with any of the following:
Historic Preservation Laws and Archaeology Laws as listed at
http://www.dahp.wa.gov/learn-and-research/preservation-laws;
Federal Superfund or Washington State Model Toxics Control Act;
Federal Aviation Administration requirements for airports;
Americans with Disabilities Act;
special zoning district design criteria adopted and being implemented pursuant to a
community planning process;
Public health and safety standards;
Transportation regulations to maintain the option for future expansion or multi-modal use of
public rights-of-way; or
Tree species protection standards in Chapter 30.62A SCC.
Lawn and landscaped areas:
1. Post-Construction Soil Quality and Depth in accordance with BMP T5.13 in Volume V,
Chapter 5 of this manual
Roofs:
1. Full Dispersion in accordance with BMP T5.30 in Volume V, Chapter 5 of this manual,
or, for single-family residential roofs and commercial roofs determined by Snohomish
County to have similar runoff pollution characteristics to single-family residential roofs,
Downspout Full Infiltration Systems in accordance with BMP T5.10A in Volume III,
Chapter 3 of this manual
2. Bioretention in accordance with Volume V, Chapter 7 of this manual.
3. For single-family residential roofs and commercial roofs determined by Snohomish
County to have similar runoff pollution characteristics to single-family residential roofs,
Downspout Dispersion Systems in accordance with BMP T5.10B in Volume III, Chapter
3 of this manual
4. For single-family residential roofs and commercial roofs determined by Snohomish
County to have similar runoff pollution characteristics to single-family residential roofs,
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 19
Perforated Stub-out Connections in accordance with BMP T5.10C in Volume III, Chapter
3 of this manual.
Other Hard Surfaces:
1. Full Dispersion in accordance with BMP T5.30 in Volume V, Chapter 5 of this manual.
2. Permeable pavement in accordance with BMP T5.15 in Volume V, Chapter 5 of this
manual. NOTE: This is not a requirement to pave these surfaces. Where pavement is
proposed, it must be permeable to the extent feasible unless full dispersion is employed.
3. Bioretention in accordance with Volume V, Chapter 7 of this manual.
4. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion
in accordance with BMP T5.11 in Volume V, Chapter 5 of this manual.
2.5.6 Minimum Requirement 6: Runoff Treatment
Stormwater treatment facilities shall be provided for each threshold discharge area in which the
hard and pervious surfaces subject to this minimum requirement (see SCC 30.63A.300 through
30.63A.310) meet the following criteria:
the total of pollution-generating hard surface (PGHS) in the threshold discharge area is 5,000
square feet or more; or
the total of pollution-generating pervious surfaces (PGPS) in the threshold discharge area,
excluding permeable pavement, and from which stormwater will be discharged in a natural or
man-made conveyance system from the site, is three-quarters (3/4) of an acre or more.
Stormwater from multiple threshold discharge areas can be treated in a single stormwater facility
designed on the basis of the combined flows.
If stormwater treatment is required, use the procedures set forth in Volume I, Chapter 4, Section
4.2, Step 5 of this manual to determine the specific type of stormwater treatment facility required
for the project. Design requirements for specific stormwater treatment facilities are set forth in
Volume V of this manual. Volume V, Chapter 4, Section 4.1 provides requirements for design
storm volumes and flow rates.
2.5.7 Minimum Requirement 7: Flow Control
Flow control is required as set forth below. If the discharge is to a stream that leads to a wetland,
or to a wetland that has an outflow to a stream, both Minimum Requirement #7 and Minimum
Requirement #8 apply.
Thresholds for requiring flow control
The requirements of this section apply to projects that discharge stormwater directly or indirectly
through a conveyance system into a fresh water system.
Unless excepted in this section, flow control shall be provided for applicable threshold discharge
areas of projects as determined by the requirements of Chapter 2 of this volume.
Flow control shall be provided for projects that meet any of the following thresholds:
Edmonds Chapter 18.30 STORM WATER MANAGEMENT Page 16/23
FINAL Version: August 23, 2016
For projects that elect to use List No. 2 to comply with ECDC 18.30.060.D.b (iii), for each surface,
consider the BMPs in the order listed for that type of surface. Use the first BMP that is considered
feasible. No other On-site Stormwater Management BMP is necessary for that surface. Feasibility shall be determined by evaluation against design criteria, limitations, and infeasibility criteria identified for each BMP in the SWMMWW; and Competing Needs Criteria listed in Chapter 5 of Volume V of the
SWMMWW.
Lawn and landscaped areas:
i. Post-Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter 5 of
Volume V of the SWMMWW.
Roofs:
i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP T5.10A in Section 3.1.1 of
Volume III of the SWMMWW.
ii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total surface area draining to it.
iii. Downspout Dispersion Systems in accordance with BMP T5.10B in Section 3.1.2 of Volume III of the SWMMWW.
iv. Perforated Stub-out Connections in accordance with BMP T5.10C in Section 3.1.3 of Volume III of the SWMMWW.
v. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if the project is required to construct a flow control facility to comply with Minimum
Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available City data, indicate that peak flow control is not beneficial.
Other Hard Surfaces:
i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the SWMMWW.
ii. Permeable pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the SWMMWW.
iii. Bioretention (See Chapter 7 of Volume V of the SWMMWW) facilities that have a minimum horizontally projected surface area below the overflow which is at least 5 percent of the total
surface area draining to it.
iv. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow Dispersion in
accordance with BMP T5.11 in Chapter 5 of Volume V of the SWMMWW.
v. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum. Note that if
the project is required to construct a flow control facility to comply with Minimum Requirement No. 7 (per ECDC 18.30.060.D.7), a detention vault is not required to be installed
to meet Minimum Requirement No. 5. In addition, the City may waive the requirement to install a detention vault if the downstream analysis in Minimum Requirement #4, or available
City data, indicate that peak flow control is not beneficial.
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 36
The first option is to infiltrate through rapidly draining soils that meet the site characterization
and Site Suitability Criteria set forth in Volume III, Chapter 3 of this manual for providing flow
control, but do not meet Site Suitability Criterion (SSC) 6 – Soil Physical and Chemical
Suitability for treatment. If the site is suitable for flow control using infiltration but SSC 6 is not
met, flow control can be accomplished using infiltration provided the requirements for treatment
set forth in Step 5 below are met. The infiltration facility must provide adequate volume such
that the flow duration standard of Minimum Requirement 7 will be achieved.
The second option is to infiltrate through soils that meet the site characterization and site
suitability criteria in Volume III, Chapter 3. The facility would be designed to meet the
requirements for treatment and flow control.
If infiltration facilities for flow control are planned, the flow control requirement has been met;
proceed to Step 5. If infiltration facilities are not planned, proceed to Step 4b.
Step 4b: Use the Western Washington Hydrology Model to size a detention facility.
Refer to Volume III, Chapter 2, for an explanation of the use of the Western Washington
Hydrology Model. Note that reducing the level of site disturbance reduces the size of the
required flow control facility.
Step 5: Select Stormwater Treatment Facilities
For each threshold discharge area in which stormwater treatment is required per Step 3 above,
select an appropriate treatment system using the following procedure. The requirements set forth
in Volume III, Chapter 3 and Volume V shall be used to size and design the selected facilities.
Volume V, Chapter 12 of this manual includes information about stormwater treatment BMPs to
which the Washington State Department of Ecology has given a use-level designation for
pretreatment, oil, phosphorous, enhanced, or basic treatment. Snohomish County will approve the
use of the subset of those BMPs to which Ecology has given a General Use-Level Designation
(GULD).
NOTE: Only basic treatment is required for landscaped areas of industrial, commercial, and
multi-family project sites, and parking lots of industrial and commercial project sites, dedicated
solely to parking of employees’ private vehicles, which do not involve any other pollution-
generating sources (e.g., industrial activities, customer parking, storage of erodible or leachable
material, wastes or chemicals).
Step 5a: Determine the receiving waters and pollutants of concern based on offsite analysis.
Determine the natural receiving waters (e.g., ground water, wetland, lake, stream, salt water) for
the stormwater drainage from the project site. If the discharge is to the Snohomish County storm
drainage system, the receiving waters for the drainage system must be determined.
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 37
Step 5b: Determine if an oil control facility is required
Oil control facilities are required for projects that have “high-use sites.” High-use sites are those
that typically generate high concentrations of oil due to high traffic turnover or the frequent
transfer of oil. High-use sites include:
An area of a commercial or industrial site subject to an expected average daily traffic (ADT)
count equal to or greater than 100 vehicles per 1,000 square feet of gross building area.
Note: Snohomish County will consider fueling stations, with or without small convenience
stores, to be a high-use site unless the applicant demonstrates, to the County’s satisfaction
and through the stormwater site planning process, that the ADT threshold will not be met.
An area of a commercial or industrial site subject to petroleum storage and transfer in excess
of 1,500 gallons per year, not including routinely delivered heating oil.
An area of a commercial or industrial site subject to parking, storage or maintenance of 25 or
more vehicles that are over 10 tons gross weight (trucks, buses, trains, heavy equipment,
etc.).
A road intersection with a measured ADT count of 25,000 vehicles or more on the main
roadway and 15,000 vehicles or more on any intersecting roadway, excluding projects
proposing primarily pedestrian or bicycle use improvements.
The traffic count can be estimated using information from “Trip Generation,” published by the
Institute of Transportation Engineers, or from a traffic study prepared by a professional engineer
or transportation specialist with experience in traffic estimation.
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 38
Figure 1.4 Treatment Facility Selection Flow Chart
Step 5a: Determine receiving
waters and pollutants of concern
through off-site analysis
Step 5b: Determine if an Oil
Control Facility is required
Select Oil Control
Facility
API Separator
CP Separator
Linear Sand Filter
Step 5c: Determine if
infiltration for pollution is
practicable
Select Pretreatment:
Presettling Basin
Any Basic treatment BMP
AND
Select Infiltration
Infiltration Basin
Infiltration Trench
Bioretention
Step 5d: Determine if
Phosphorus Control is required
Select Phosphorus Control Facility
Large Sand Filter
Large Wetpond
Two Facility Treatment Train Step 5e: Determine if Enhanced
Treatment is required
Select Enhanced Treatment
Facility (see note 1)
Large Sand Filter
Treatment wetland
Compost-Amended Filter Strip
Two facility Treatment Train
Bioretention
WSDOT Media Filter Drain
Step 5f: Select Basic Treatment
Facility
Biofiltration Swale
Infiltration Treatment
Filter Strip
Basic Wetpond
Wet Vault
Treatment Wetlands
Combined Detention Wetpool
Sand Filter
Bioretention
WSDOT Media Filter Drain
Yes
Yes
To step 5b
No
Yes
Yes
To step 5c
No
No
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 39
Some land use types require the use of a spill control (SC-type) oil/water separator. Those
situations are described in Volume IV and are separate from this treatment requirement. While a
number of activities may be required to use spill control (SC-type) separators, only a few will
necessitate American Petroleum Institute (API) or coalescing plate (CP)-type separators for
treatment. The following urban land uses are likely to have areas that fall within the definition of
“high-use sites” or have sufficient quantities of free oil present that can be treated by an API or
CP-type oil/water separator.
Industrial Machinery and Equipment, and Railroad Equipment Maintenance
Log Storage and Sorting Yards
Aircraft Maintenance Areas
Railroad Yards
Fueling Stations
Vehicle Maintenance and Repair
Construction Businesses (paving, heavy equipment storage and maintenance, storage of
petroleum products)
Oil control facilities are to be placed upstream of other stormwater facilities and as close as is
feasible to the oil source. For high-use sites located within a larger commercial center, only the
impervious surface associated with the high-use portion of the site is subject to treatment
requirements. If common parking for multiple businesses is provided, treatment shall be applied
to the number of parking stalls required for the high-use business only. However, if the
treatment collection area also receives runoff from other areas, the treatment facility must be
sized to treat all water passing through it.
High-use roadway intersections shall treat lanes where vehicles accumulate during the signal
cycle, including left and right turn lanes and through lanes, from the beginning of the left turn
pocket. If no left turn pocket exists, the treatable area shall begin at a distance equal to three car
lengths from the stop line. If runoff from the intersection drains to more than two collection
areas that do not combine within the intersection, treatment may be limited to any two of the
collection areas.
If an oil control facility is required, select one of the options below.
API-Type Oil/Water Separator – See Volume V, Chapter 11
Coalescing Plate Oil/Water Separator – See Volume V, Chapter 11
Linear Sand Filter – See Volume V, Chapter 8
Any BMP for which Ecology has issued a General Use Level Designation for oil control
The linear sand filter is used in the basic, enhanced, and phosphorus treatment menus also. If
used to satisfy one of those treatment requirements, the same facility shall not also be used to
satisfy the oil control requirement unless quarterly maintenance is assured.
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 40
Step 5c: Determine whether infiltration for pollutant removal is practicable
If the evaluation in Step 4a determines the site is unsuitable to provide flow control using
infiltration, the site is also unsuitable for stormwater treatment using infiltration. If so, proceed
to Step 5d.
If the site is suitable for flow control using infiltration, determine whether native soils are
suitable for treating stormwater by infiltration in accordance with Site Suitability Criterion SSC-
6 in Volume III, Chapter 3.3.7. Infiltration treatment facilities must be preceded by a
pretreatment facility (see Volume V, Chapter 6), which may be a presettling basin, an oil control
facility, or a basic treatment facility. If an oil/water separator is used for pretreatment, more
frequent facility inspections may be necessary to determine when accumulated solids exceed the
sediment depth at which maintenance is required (See Volume V, Chapter 4).
If infiltration treatment is practicable, select an infiltration facility and an appropriate
pretreatment facility.
If infiltration treatment is not practicable, proceed to Step 5d.
Step 5d: Determine if a phosphorus control facility is required.
Control of phosphorus in new development or redevelopment is required prior to:
surface discharge to waters reported under section 305(b) of the Clean Water Act and
designated as not supporting beneficial uses due to phosphorus;
surface discharge to water bodies those waters listed in Washington State's Nonpoint Source
Assessment required under section 319(a) of the Clean Water Act because of nutrient
concentrations;
surface discharge to wetlands categorized as Category I or Category II by the Washington
State Wetland Rating System of Western Washington; or
stormwater infiltrated within one-quarter mile of a phosphorus-sensitive receiving water or a
tributary to that water in soils that do not meet the soil suitability criteria for infiltration
treatment in Chapter 3 of Volume III.
If phosphorus control is not required, proceed to Step 5e. If phosphorus control is required,
select one of the facilities below.
Large sand filter
Large wetpond
Treatment train for phosphorus removal – see Table 1.2
Any other treatment system for which the Washington State Department of Ecology has
issued a General Use Level Designation for phosphorus treatment.
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 41
Table 1.2 – Treatment Trains for Phosphorus Removal
First Basic Treatment Facility Second Treatment Facility
Biofiltration Swale Basic Sand Filter or Sand Filter
Vault
Filter Strip Linear Sand Filter (no presettling
needed)
Linear Sand Filter Filter Strip
Basic Wetpond Basic Sand Filter or Sand Filter
Vault
Wetvault Basic Sand Filter or Sand Filter
Vault
Stormwater Treatment Wetland Basic Sand Filter or Sand Filter
Vault
Basic Combined Detention and
Wetpool
Basic Sand Filter or Sand Filter
Vault
Proceed to Step 5e to determine whether enhanced treatment is required. Projects for which
phosphorus control is required may be subject to requirements for enhanced treatment as well, in
which case a facility or treatment train must be selected that that satisfies both requirements.
Step 5e: Determine if enhanced treatment is required.
Unless excepted as stated below, enhanced treatment is required for the following project sites or
portions of sites that discharge to fresh waters designated for aquatic life or that have existing
aquatic life use, to conveyance systems tributary to such waters, or to stormwater infiltration
systems that are not designed and constructed to provide treatment in accordance with the
requirements of this manual and that are within ¼ mile of such waters:
Industrial project sites;
Commercial project sites;
Multi-family project sites; and
High ADT roads as follows:
o Within Urban Growth Areas:
- Fully controlled and partially controlled limited access roads with Average Daily
Traffic (ADT) counts of 15,000 or more
- All other roads with an ADT of 7,500 or greater
o Outside of Urban Growth Areas:
- Roads with an ADT of 15,000 or greater unless discharging to a 4th Strahler order
stream or larger;
- Roads with an ADT of 30,000 or greater if discharging to a 4th Strahler order stream
or larger (as determined using 1:24,000 scale maps to delineate stream order).
January 2016 Snohomish County Drainage Manual Volume I - Minimum Technical Requirements 42
Exceptions
For threshold discharge areas with more than one land use or activity, the enhanced treatment
requirement shall apply to a threshold discharge area if 50 percent or more of the total runoff
within that threshold discharge area is subject to the enhanced treatment requirements set forth
above.
Projects or portions of projects meeting the descriptions above do not need enhanced treatment if
the stormwater discharges directly or indirectly through a municipal storm sewer system to a
water body listed in Volume I, Appendix I-C
If enhanced treatment is required, select one of the treatment systems below.
Large sand filter
Stormwater treatment wetland
Compost-amended filter strip
Bioretention
WSDOT media filter drain - see the 2014 Washington State Department of Transportation
Highway Runoff Manual for design and construction requirements.
Treatment train for dissolved metals removal – See Table 1.3
Any other treatment system for which the Washington State Department of Ecology has
issued a General Use Level Designation for enhanced treatment.
&KDSWHU 9 7UHDWPHQW )DFLOLW\ 0HQXV
7KLV FKDSWHU LGHQWLILHV FKRLFHV WKDW FRPSULVH WKH WUHDWPHQW IDFLOLW\ PHQXV UHIHUUHG WR LQ
&KDSWHU 97UHDWPHQW )DFLOLW\6HOHFWLRQ 3URFHVV S 7KH PHQXV LQ WKLV FKDSWHU
DUH GLVFXVVHG LQ WKH RUGHU RI WKH GHFLVLRQ SURFHVV VKRZQ LQ )LJXUH 97UHDWPHQW
)DFLOLW\6HOHFWLRQ )ORZ &KDUW SDQG DUH DV IROORZV
2LO &RQWURO 0HQX92LO &RQWURO 0HQX S
3KRVSKRUXV 7UHDWPHQW 0HQX93KRVSKRUXV 7UHDWPHQW 0HQX S
(QKDQFHG 7UHDWPHQW 0HQX9(QKDQFHG 7UHDWPHQW 0HQX S
%DVLF 7UHDWPHQW 0HQX9%DVLF 7UHDWPHQW 0HQX S
9(PHUJLQJ 7HFKQRORJLHV IRU 6WRUPZDWHU 7UHDWPHQW DQG &RQWURO 2SWLRQV S
LQFOXGHV OLQNV WR PHQXV IRU HPHUJLQJ WHFKQRORJLHV WKDW KDYH D 8VH/HYHO 'HVLJQDWLRQ
IRU SUHWUHDWPHQW RLO SKRVSKRURXV HQKDQFHG RU EDVLF WUHDWPHQW 2QO\ WHFKQRORJLHV ZLWK
D *HQHUDO 8VH/HYHO 'HVLJQDWLRQ *8/' FDQ KDYH DQ XQOLPLWHG QXPEHU RI LQVWDOODWLRQV
9 *XLGH WR $SSO\LQJ 0HQXV
5HDG WKH VWHSE\VWHS VHOHFWLRQ SURFHVV IRU WUHDWPHQW IDFLOLWLHV LQ 9
6WHSE\6WHS 6HOHFWLRQ 3URFHVV IRU 7UHDWPHQW )DFLOLWLHV S
'HWHUPLQH ZKLFK PHQXV DSSO\ WR WKH GLVFKDUJH VLWXDWLRQ 7KLV ZLOO UHTXLUH NQRZOHGJH RI
WKH UHFHLYLQJ ZDWHUV WKDW WKH SURMHFW VLWH XOWLPDWHO\ GLVFKDUJHV WR DQG ZKHWKHU
WKH ORFDO JRYHUQPHQW ZLWK MXULVGLFWLRQ (FRORJ\ RU WKH 86(3$ KDV LGHQWLILHG WKH UHFHLY
LQJ ZDWHU DV VXEMHFW WR SKRVSKRUXV FRQWURO UHTXLUHPHQWV DQG ZKHWKHU WKH VLWH TXDO
LILHV DV VXEMHFW WR RLO FRQWURO
'HWHUPLQH LI \RXU SURMHFW UHTXLUHV RLO FRQWURO
,I WKH SURMHFW UHTXLUHV RLO FRQWURO RU LI \RX HOHFW WR SURYLGH HQKDQFHG RLO SROOXWLRQ FRQWURO
FKRRVH RQH RI WKH RSWLRQV SUHVHQWHG LQ 92LO &RQWURO 0HQX S 'HWDLOHG GHVLJQV
IRU RLO FRQWURO IDFLOLWLHV DUH JLYHQ LQ VXEVHTXHQW FKDSWHUV
1RWH2QH RI WKH RWKHU WKUHH WUHDWPHQW PHQXV ZLOO DOVR QHHG WR EH DSSOLHG DORQJ ZLWK RLO
FRQWURO
)LQG WKH 7UHDWPHQW 0HQX WKDW DSSOLHV WR WKH SURMHFW ± %DVLF (QKDQFHG
RU 3KRVSKRUXV
(DFK PHQX SUHVHQWV WUHDWPHQW RSWLRQV 6HOHFW RQH RSWLRQ 6LQFH DOO RSWLRQV DUH LQWHQGHG
WR SURYLGH HTXLYDOHQW UHPRYDO RI WKH WDUJHW SROOXWDQW WKH FKRLFH ZLOO GHSHQG RQO\ RQ WKH
FRQVWUDLQWV DQG RSSRUWXQLWLHV RI WKH VLWH $ SURMHFW VLWH PD\ EH VXEMHFW WR ERWK WKH
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
(QKDQFHG 7UHDWPHQW UHTXLUHPHQW DQG WKH 3KRVSKRUXV 7UHDWPHQW UHTXLUHPHQW ,Q WKDW
HYHQWVHOHFWD IDFLOLW\ RU D WUHDWPHQWWUDLQ WKDWLV OLVWHG LQ ERWK WUHDWPHQW PHQXV 1RWH ,I
IORZ FRQWURO UHTXLUHPHQWV DSSO\ LW ZLOO XVXDOO\ EH PRUH HFRQRPLFDO WR XVH WKH FRPELQHG
GHWHQWLRQZHWSRRO IDFLOLWLHV'HWDLOHG IDFLOLW\ GHVLJQV IRU DOO WKH SRVVLEOH RSWLRQV DUH JLYHQ
LQ VXEVHTXHQW FKDSWHUV LQ WKLV 9ROXPH
5HDG &KDSWHU FRQFHUQLQJ JHQHUDO IDFLOLW\ UHTXLUHPHQWV
7KH\ DSSO\ WR DOO IDFLOLWLHV DQG PD\ DIIHFWWKH GHVLJQ DQG SODFHPHQWRIIDFLOLWLHV RQ WKH
VLWH
9 2LO &RQWURO 0HQX
1RWH:KHUH WKLV PHQX LV DSSOLFDEOH LW LV LQ DGGLWLRQ WR IDFLOLWLHV UHTXLUHG E\ RQH RIWKH
RWKHU 7UHDWPHQW 0HQXV
$SSOLFDWLRQ RQ WKH 3URMHFW 6LWH2LO FRQWURO IDFLOLWLHV DUH WR EH SODFHG XSVWUHDP RIRWKHU
IDFLOLWLHVDV FORVH WR WKH VRXUFH RIRLO JHQHUDWLRQ DV SUDFWLFDO )RU KLJKXVH VLWHV ORFDWHG
ZLWKLQ D ODUJHU FRPPHUFLDO FHQWHU RQO\ WKH LPSHUYLRXV VXUIDFH DVVRFLDWHG ZLWK WKH KLJK
XVH SRUWLRQ RI WKH VLWH LV VXEMHFW WR WUHDWPHQW UHTXLUHPHQWV ,I FRPPRQ SDUNLQJ IRU PXO
WLSOH EXVLQHVVHV LV SURYLGHG WUHDWPHQW VKDOO EH DSSOLHG WR WKH QXPEHU RI SDUNLQJ VWDOOV
UHTXLUHG IRU WKH KLJKXVH EXVLQHVV RQO\ +RZHYHU LI WKH WUHDWPHQW FROOHFWLRQ DUHD DOVR
UHFHLYHV UXQRIIIURP RWKHU DUHDVWKH WUHDWPHQWIDFLOLW\ PXVWEH VL]HG WR WUHDW DOO ZDWHU
SDVVLQJ WKURXJK LW
+LJKXVH URDGZD\ LQWHUVHFWLRQV VKDOO WUHDW ODQHV ZKHUH YHKLFOHV DFFXPXODWHGXULQJWKH
VLJQDO F\FOH LQFOXGLQJ OHIW DQG ULJKW WXUQ ODQHV DQG WKURXJK ODQHV IURP WKH EHJLQQLQJ RI
WKH OHIW WXUQ SRFNHW ,I QR OHIW WXUQ SRFNHW H[LVWV WKH WUHDWDEOH DUHD VKDOO EHJLQ DWD GLV
WDQFH HTXDO WR WKUHH FDU OHQJWKV IURP WKH VWRS OLQH ,I UXQRII IURP WKH LQWHUVHFWLRQ GUDLQV WR
PRUH WKDQ WZR FROOHFWLRQ DUHDV WKDW GR QRW FRPELQH ZLWKLQ WKH LQWHUVHFWLRQ WUHDWPHQW
PD\ EH OLPLWHG WR DQ\ WZR RIWKH FROOHFWLRQ DUHDV
3HUIRUPDQFH *RDO7KH IDFLOLW\ FKRLFHV LQ WKH 2LO &RQWURO 0HQX DUH LQWHQGHG WR DFKLHYH
WKH JRDOV RI QR RQJRLQJ RU UHFXUULQJ YLVLEOH VKHHQ DQG WR KDYH D KRXU DYHUDJH 7RWDO
3HWUROHXP +\GURFDUERQ 73+ FRQFHQWUDWLRQ QR JUHDWHU WKDQ PJO DQG D PD[LPXP RI
PJO IRU D GLVFUHWH VDPSOH JUDE VDPSOH
1RWH8VH WKH PHWKRG IRU 1:73+'[ LQ (FRORJ\ 3XEOLFDWLRQ 1R (&<$QD
O\WLFDO 0HWKRGV IRU 3HWUROHXP +\GURFDUERQV ,I WKH FRQFHQWUDWLRQ RI JDVROLQH LV RI
LQWHUHVW WKH PHWKRG IRU 1:73+*[ VKRXOG EH XVHG WR DQDO\]H JUDE VDPSOHV
2SWLRQV2LO FRQWURO RSWLRQV LQFOXGH IDFLOLWLHV WKDWDUH VPDOOWUHDWUXQRIIIURP D OLPLWHG
DUHD DQG UHTXLUH IUHTXHQW PDLQWHQDQFH 7KH RSWLRQV DOVR LQFOXGH IDFLOLWLHV WKDWWUHDWUXQ
RII IURP ODUJHU DUHDV DQG JHQHUDOO\ KDYH OHVV IUHTXHQW PDLQWHQDQFH QHHGV
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
$3,7\SH 2LO:DWHU 6HSDUDWRU ±6HH&KDSWHU 92LO DQG :DWHU 6HSDUDWRUV
S
&RDOHVFLQJ 3ODWH 2LO:DWHU 6HSDUDWRU ±6HH&KDSWHU 92LO DQG :DWHU 6HSDU
DWRUV S
(PHUJLQJ 6WRUPZDWHU 7UHDWPHQW 7HFKQRORJLHV ±6HH&KDSWHU 9(PHUJLQJ
7HFKQRORJLHV S
/LQHDU 6DQG )LOWHU ±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV S
1RWH7KH OLQHDU VDQG ILOWHU LV XVHG LQ WKH %DVLF (QKDQFHG DQG 3KRVSKRUXV 7UHDWPHQW
PHQXV DOVR ,I XVHG WR VDWLVI\ RQH RI WKRVH WUHDWPHQW UHTXLUHPHQWV WKH VDPH IDFLOLW\ VKDOO
QRW DOVR EH XVHG WR VDWLVI\ WKH RLO FRQWURO UHTXLUHPHQW XQOHVV LQFUHDVHG PDLQWHQDQFH LV
DVVXUHG 7KLV LQFUHDVH LQ PDLQWHQDQFH LV WR SUHYHQW FORJJLQJ RI WKH ILOWHU E\ RLO VR WKDW LW
ZLOO IXQFWLRQ IRU VXVSHQGHG VROLGV PHWDOV DQG SKRVSKRUXV UHPRYDO DV ZHOO 4XDUWHUO\
FOHDQLQJ LV UHTXLUHG XQOHVV VSHFLILHG RWKHUZLVH E\ WKH GHVLJQHU
9 3KRVSKRUXV 7UHDWPHQW 0HQX
:KHUH $SSOLHG7KH 3KRVSKRUXV 7UHDWPHQW 0HQX DSSOLHV WR SURMHFWV ZLWKLQ ZDWHUVKHGV
WKDW KDYH EHHQ GHWHUPLQHG E\ ORFDO JRYHUQPHQWV (FRORJ\ RU WKH 86(3$ WR EH VHQVLWLYH
WR SKRVSKRUXV DQG WKDW DUH EHLQJ PDQDJHG WR FRQWURO SKRVSKRUXV LQSXWV IURP VWRUP
ZDWHU 7KLV PHQX DSSOLHV WR VWRUPZDWHU FRQYH\HG WR WKH ODNH E\ VXUIDFH IORZ DV ZHOO DV
WR VWRUPZDWHU LQILOWUDWHG ZLWKLQ RQHTXDUWHU PLOH RI WKH ODNH LQ VRLOV WKDW GR QRW PHHW WKH
VRLO VXLWDELOLW\ FULWHULD LQ &KDSWHU ,,,)ORZ &RQWURO 'HVLJQ S
3HUIRUPDQFH *RDO7KH 3KRVSKRUXV 0HQX IDFLOLW\ FKRLFHV DUH LQWHQGHG WR DFKLHYH D
JRDO RI WRWDO SKRVSKRUXV UHPRYDO IRU D UDQJH RI LQIOXHQW FRQFHQWUDWLRQVRI±
PJO WRWDO SKRVSKRUXV ,Q DGGLWLRQ WKH FKRLFHV DUH LQWHQGHG WR DFKLHYH WKH %DVLF 7UHDW
PHQW SHUIRUPDQFH JRDO 7KH SHUIRUPDQFH JRDO DSSOLHV WR WKH ZDWHU TXDOLW\ GHVLJQ VWRUP
YROXPH RU IORZ UDWH ZKLFKHYHU LV DSSOLFDEOH 7KH LQFUHPHQWDO SRUWLRQ RI UXQRII LQ H[FHVV
RI WKH ZDWHU TXDOLW\ GHVLJQ IORZ UDWH RU YROXPH FDQ EH URXWHG DURXQG WKH IDFLOLW\ RIIOLQH
WUHDWPHQWIDFLOLWLHVRU FDQ EH SDVVHG WKURXJK WKH IDFLOLW\ RQOLQH WUHDWPHQWIDFLOLWLHV
SURYLGHG D QHW SROOXWDQW UHGXFWLRQ LV PDLQWDLQHG (FRORJ\ HQFRXUDJHV WKH GHVLJQ DQG
RSHUDWLRQ RI WUHDWPHQW IDFLOLWLHV WKDW HQJDJH D E\SDVV DW IORZ UDWHV KLJKHU WKDQ WKH ZDWHU
TXDOLW\ GHVLJQ IORZ UDWH 7KLV LV DFFHSWDEOH SURYLGHG WKDW WKH RYHUDOO UHGXFWLRQ LQ SKRV
SKRUXV ORDGLQJ WUHDWHG SOXV E\SDVVHG LV DW OHDVW HTXDO WR WKDW DFKLHYHG ZLWK LQLWLDWLQJ
E\SDVV DWWKH ZDWHU TXDOLW\ GHVLJQ IORZ UDWH1RWH WKDWZHWSRRO IDFLOLWLHV DUH DOZD\V
GHVLJQHG WR EH RQOLQH
2SWLRQV$Q\ RQH RI WKH IROORZLQJ RSWLRQV PD\ EH FKRVHQ WR VDWLVI\ WKH SKRVSKRUXV WUHDW
PHQW UHTXLUHPHQW
,QILOWUDWLRQ &KDSWHU ,,,)ORZ &RQWURO 'HVLJQ SZLWK DSSURSULDWH SUH
WUHDWPHQW &KDSWHU 93UHWUHDWPHQW S ±,QILOWUDWLRQ WUHDWPHQW
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
,ILQILOWUDWLRQ LV WKURXJK VRLOV PHHWLQJ WKH PLQLPXP VLWH VXLWDELOLW\ FULWHULD IRU LQILOW
UDWLRQ WUHDWPHQW 6HH ,,,6LWH 6XLWDELOLW\&ULWHULD 66&S D SUHVHWWOLQJ
EDVLQ RU D EDVLF WUHDWPHQWIDFLOLW\ FDQ VHUYH IRU SUHWUHDWPHQW
,QILOWUDWLRQ SUHFHGHG E\ %DVLF 7UHDWPHQW
,ILQILOWUDWLRQ LV WKURXJK VRLOV WKDWGR QRWPHHWWKH VRLO VXLWDELOLW\ FULWHULD IRU LQILOWUDWLRQ
WUHDWPHQWWUHDWPHQWPXVWEH SURYLGHG E\ D EDVLF WUHDWPHQWIDFLOLW\ XQOHVVWKHVRLO
DQG VLWH ILW WKH GHVFULSWLRQ LQ WKH QH[W RSWLRQ EHORZ
,QILOWUDWLRQ SUHFHGHG E\ 3KRVSKRUXV 7UHDWPHQW
,IWKH VRLOV GR QRWPHHWWKH VRLO VXLWDELOLW\ FULWHULD DQG WKH LQILOWUDWLRQ VLWH LV ZLWKLQ ó
PLOH RI D SKRVSKRUXVVHQVLWLYH UHFHLYLQJ ZDWHU RU D WULEXWDU\ WR WKDW ZDWHU WUHDW
PHQWPXVWEH SURYLGHG E\ RQH RIWKH RWKHU WUHDWPHQWIDFLOLW\ RSWLRQV OLVWHG EHORZ
/DUJH 6DQG )LOWHU ±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV S
/DUJH :HWSRQG ±6HH&KDSWHU 9:HWSRRO )DFLOLWLHV S
(PHUJLQJ 6WRUPZDWHU 7UHDWPHQW 7HFKQRORJLHV WDUJHWHG IRU SKRVSKRUXV
UHPRYDO ±6HH&KDSWHU 9(PHUJLQJ 7HFKQRORJLHV S
7ZR)DFLOLW\ 7UHDWPHQW 7UDLQV ±6HH7DEOH 97UHDWPHQW 7UDLQV IRU 3KRV
SKRUXV 5HPRYDO S
)LUVW %DVLF 7UHDWPHQW )DFLOLW\6HFRQG 7UHDWPHQW )DFLOLW\
%LRILOWUDWLRQ 6ZDOH %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
)LOWHU 6WULS /LQHDU 6DQG )LOWHU QR SUHVHWWOLQJ QHHGHG
/LQHDU 6DQG )LOWHU )LOWHU 6WULS
%DVLF :HWSRQG %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
:HWYDXOW %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
6WRUPZDWHU 7UHDWPHQW :HWODQG %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
%DVLF &RPELQHG 'HWHQWLRQ DQG :HWSRRO %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
7DEOH 9 7UHDWPHQW 7UDLQV IRU 3KRVSKRUXV 5HPRYDO
9 (QKDQFHG 7UHDWPHQW 0HQX
:KHUH $SSOLHG([FHSW ZKHUH VSHFLILHG LQ 9%DVLF 7UHDWPHQW 0HQX S
(QKDQFHG WUHDWPHQW LV UHTXLUHG IRU WKH IROORZLQJ SURMHFW VLWHV WKDW
'LVFKDUJH GLUHFWO\ WR IUHVK ZDWHUV RU FRQYH\DQFH V\VWHPV WULEXWDU\ WR IUHVK ZDWHUV
GHVLJQDWHG IRU DTXDWLF OLIH XVH RU WKDW KDYH DQ H[LVWLQJ DTXDWLF OLIH XVH RU
8VH LQILOWUDWLRQ VWULFWO\ IRU IORZ FRQWURO ± QRW WUHDWPHQW ± DQG WKH GLVFKDUJH LV ZLWKLQ
ó PLOH RI D IUHVK ZDWHU GHVLJQDWHG IRU DTXDWLF OLIH XVH RU WKDW KDV DQ H[LVWLQJ
DTXDWLF OLIH XVH
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
,QGXVWULDO SURMHFW VLWHV
&RPPHUFLDO SURMHFW VLWHV
0XOWLIDPLO\ SURMHFW VLWHV DQG
+LJK $$'7 URDGV DV IROORZV
:LWKLQ 8UEDQ *URZWK $UHDV
R )XOO\ FRQWUROOHG DQG SDUWLDOO\ FRQWUROOHG OLPLWHG DFFHVV KLJKZD\V ZLWK $QQXDO
$YHUDJH 'DLO\ 7UDIILF $$'7 FRXQWV RI RU PRUH
R $OO RWKHU URDGV ZLWK DQ $$'7 RI RU JUHDWHU
2XWVLGH RI 8UEDQ *URZWK $UHDV
R 5RDGV ZLWK DQ $$'7 RI RU JUHDWHU XQOHVV GLVFKDUJLQJ WR D WK
6WUDKOHU RUGHU VWUHDP RU ODUJHU
R 5RDGV ZLWK DQ $$'7 RI RU JUHDWHU LI GLVFKDUJLQJ WR D WK 6WUDKOHU
RUGHU VWUHDP RU ODUJHU DV GHWHUPLQHG XVLQJ VFDOH PDSV WR GHOLQHDWH
VWUHDP RUGHU
$Q\ DUHDV RI WKH DERYHOLVWHG SURMHFW VLWHV WKDW DUH LGHQWLILHG DV VXEMHFW WR %DVLF 7UHDW
PHQW UHTXLUHPHQWV VHH 9%DVLF 7UHDWPHQW 0HQX S DUH QRW DOVR VXEMHFW WR
(QKDQFHG 7UHDWPHQW UHTXLUHPHQWV )RU GHYHORSPHQWV ZLWK D PL[ RI ODQG XVH W\SHV WKH
(QKDQFHG 7UHDWPHQW UHTXLUHPHQW VKDOO DSSO\ ZKHQ WKH UXQRII IURP WKH DUHDV VXEMHFW WR
WKH (QKDQFHG 7UHDWPHQW UHTXLUHPHQW FRPSULVHV RU PRUH RI WKH WRWDO UXQRIIZLWKLQ D
WKUHVKROG GLVFKDUJH DUHD
3HUIRUPDQFH *RDO7KH (QKDQFHG 0HQX IDFLOLW\ FKRLFHV DUH LQWHQGHG WR SURYLGH D
KLJKHU UDWH RIUHPRYDO RIGLVVROYHG PHWDOV WKDQ %DVLF 7UHDWPHQWIDFLOLWLHV %DVHG RQ D
UHYLHZ RI GLVVROYHG PHWDOV UHPRYDO RI EDVLF WUHDWPHQW RSWLRQV D ³KLJKHU UDWH RI UHPRYDO´
LV FXUUHQWO\ GHILQHG DV JUHDWHU WKDQ GLVVROYHG FRSSHU UHPRYDO DQG JUHDWHU WKDQ
GLVVROYHG ]LQF UHPRYDO ,Q DGGLWLRQ WKH PHQX FKRLFHV DUH LQWHQGHG WR DFKLHYH WKH
%DVLF 7UHDWPHQW SHUIRUPDQFH JRDO 7KH SHUIRUPDQFH JRDO DVVXPHV WKDW WKH IDFLOLW\ LV
WUHDWLQJ VWRUPZDWHU ZLWK GLVVROYHG &RSSHU W\SLFDOO\ UDQJLQJ IURP WRPJODQG
GLVVROYHG =LQF UDQJLQJ IURP WR PJO
7KH SHUIRUPDQFH JRDO DSSOLHV WR WKH ZDWHU TXDOLW\ GHVLJQ VWRUP YROXPH RU IORZ UDWH
ZKLFKHYHU LV DSSOLFDEOH 7KH LQFUHPHQWDO SRUWLRQ RI UXQRII LQ H[FHVV RI WKH ZDWHU TXDOLW\
GHVLJQ IORZ UDWH RU YROXPH FDQ EH URXWHG DURXQG WKH IDFLOLW\ RIIOLQH WUHDWPHQWIDFLOLWLHV
RU FDQ EH SDVVHG WKURXJK WKH IDFLOLW\ RQOLQH WUHDWPHQWIDFLOLWLHV SURYLGHG D QHW SROOXWDQW
UHGXFWLRQ LV PDLQWDLQHG (FRORJ\ HQFRXUDJHV WKH GHVLJQ DQG RSHUDWLRQ RI WUHDWPHQW IDFLO
LWLHV WKDW HQJDJH D E\SDVV DW IORZ UDWHV KLJKHU WKDQ WKH ZDWHU TXDOLW\ GHVLJQIORZUDWHDV
ORQJ DV WKH UHGXFWLRQ LQ GLVVROYHG PHWDOV ORDGLQJ H[FHHGV WKDW DFKLHYHG ZLWK LQLWLDWLQJ
E\SDVV DWWKH ZDWHU TXDOLW\ GHVLJQ IORZ UDWH1RWH WKDWZHWSRRO IDFLOLWLHV DUH DOZD\V
GHVLJQHG WR EH RQOLQH
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
2SWLRQV$Q\ RQH RI WKH IROORZLQJ RSWLRQV PD\ EH FKRVHQ WR VDWLVI\ WKH HQKDQFHG WUHDW
PHQW UHTXLUHPHQW
,QILOWUDWLRQ &KDSWHU ,,,)ORZ &RQWURO 'HVLJQ SZLWK DSSURSULDWH SUH
WUHDWPHQW &KDSWHU 93UHWUHDWPHQW S
R ,QILOWUDWLRQ WUHDWPHQW
,I LQILOWUDWLRQ LV WKURXJK VRLOV PHHWLQJ WKH PLQLPXP VLWH VXLWDELOLW\ FULWHULD IRU
LQILOWUDWLRQ WUHDWPHQW 6HH ,,,6LWH 6XLWDELOLW\&ULWHULD 66&S D
SUHVHWWOLQJ EDVLQ RU D EDVLF WUHDWPHQWIDFLOLW\ FDQ VHUYH IRU SUHWUHDWPHQW
R ,QILOWUDWLRQ SUHFHGHG E\ %DVLF 7UHDWPHQW
,I LQILOWUDWLRQ LV WKURXJK VRLOV WKDW GR QRW PHHW WKH VRLO VXLWDELOLW\ FULWHULD IRU LQILOW
UDWLRQ WUHDWPHQWWUHDWPHQWPXVWEH SURYLGHG E\ D EDVLF WUHDWPHQWIDFLOLW\
XQOHVV WKH VRLO DQG VLWH ILW WKH GHVFULSWLRQ LQ WKH QH[W RSWLRQ EHORZ
R ,QILOWUDWLRQ SUHFHGHG E\ (QKDQFHG 7UHDWPHQW
,IWKH VRLOV GR QRWPHHWWKH VRLO VXLWDELOLW\ FULWHULD DQG WKH LQILOWUDWLRQ VLWH LV
ZLWKLQ ó PLOH RI D IUHVK ZDWHU GHVLJQDWHG IRU DTXDWLF OLIH XVH RU WKDW KDV DQ
H[LVWLQJ DTXDWLF OLIH XVH WUHDWPHQW PXVW EH SURYLGHG E\ RQH RI WKH RWKHU WUHDW
PHQWIDFLOLW\ RSWLRQV OLVWHG EHORZ
/DUJH 6DQG )LOWHU ±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV S
6WRUPZDWHU 7UHDWPHQW :HWODQG ±6HH&KDSWHU 9:HWSRRO )DFLOLWLHV S
&RPSRVWDPHQGHG 9HJHWDWHG )LOWHU 6WULS &$9)6±6HH&KDSWHU 9,QILOWUD
WLRQ DQG %LRUHWHQWLRQ 7UHDWPHQW )DFLOLWLHV S
7ZR )DFLOLW\ 7UHDWPHQW 7UDLQV ±6HH7DEOH 97UHDWPHQW 7UDLQV IRU 'LV
VROYHG 0HWDOV 5HPRYDO S
)LUVW %DVLF 7UHDWPHQW )DFLOLW\6HFRQG 7UHDWPHQW )DFLOLW\
%LRILOWUDWLRQ 6ZDOH
%DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
RU 0HGLD )LOWHU
)LOWHU 6WULS
/LQHDU 6DQG )LOWHU ZLWK QR SUHVHWWOLQJ
FHOO QHHGHG
/LQHDU 6DQG )LOWHU )LOWHU 6WULS
%DVLF :HWSRQG
%DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
RU 0HGLD )LOWHU
:HWYDXOW %DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
RU 0HGLD )LOWHU
%DVLF &RPELQHG 'HWHQWLRQ:HWSRRO
%DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW
RU 0HGLD )LOWHU
7DEOH 9 7UHDWPHQW 7UDLQV IRU 'LVVROYHG 0HWDOV 5HPRYDO
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
)LUVW %DVLF 7UHDWPHQW )DFLOLW\6HFRQG 7UHDWPHQW )DFLOLW\
%DVLF 6DQG )LOWHU RU 6DQG )LOWHU 9DXOW ZLWK D SUH
VHWWOLQJ FHOO LI WKH ILOWHU LVQ
W SUHFHGHG E\ D GHWHQ
WLRQ IDFLOLW\
0HGLD )LOWHU
)RRWQRWH
7KH PHGLD PXVW EH D W\SH DSSURYHG IRU EDVLF RU HQKDQFHG WUHDWPHQW XVH E\ (FR
ORJ\ 6HH &KDSWHU 9(PHUJLQJ 7HFKQRORJLHV SIRU DSSURYHG PHGLD ILOWHUV
7DEOH 9 7UHDWPHQW 7UDLQV IRU 'LVVROYHG 0HWDOV 5HPRYDO
FRQWLQXHG
%LRUHWHQWLRQ ±6HH&KDSWHU 9,QILOWUDWLRQ DQG %LRUHWHQWLRQ 7UHDWPHQW )DFLOLWLHV
S
1RWH6WRUPZDWHU UXQRII WKDW LQILOWUDWHV WKURXJK WKH LPSRUWHG VRLO PL[ZLOO KDYH
UHFHLYHG (QKDQFHG 7UHDWPHQW :KHUH ELRUHWHQWLRQ LV LQWHQGHG WR IXOO\ PHHW WUHDW
PHQW UHTXLUHPHQWV IRU LWV GUDLQDJH DUHD LW PXVW EH GHVLJQHG XVLQJ DQ DSSURYHG
FRQWLQXRXV UXQRII PRGHO WR SDVV DW OHDVW RI WKH LQIOXHQW UXQRII ILOH WKURXJK WKH
LPSRUWHG VRLO PL[
0HGLD )LOWHU 'UDLQ 0)'±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV
S
(PHUJLQJ 6WRUPZDWHU 7UHDWPHQW 7HFKQRORJLHV ±6HH&KDSWHU 9(PHUJLQJ
7HFKQRORJLHV S
9 %DVLF 7UHDWPHQW 0HQX
:KHUH $SSOLHG7KH %DVLF 7UHDWPHQW0HQX LV UHTXLUHG LQ WKH IROORZLQJ FLUFXPVWDQFHV
3URMHFW VLWHV WKDW GLVFKDUJH WR WKH JURXQG VHH 6WHS LQ &KDSWHU 97UHDWPHQW
)DFLOLW\6HOHFWLRQ 3URFHVV S 81/(66
R 7KH VRLO VXLWDELOLW\ FULWHULD IRU LQILOWUDWLRQ WUHDWPHQWDUH PHWVHH &KDSWHU ,,,
)ORZ &RQWURO 'HVLJQ S DQG SUHWUHDWPHQW LV SURYLGHG 25
R 7KH SURMHFW XVHV LQILOWUDWLRQ VWULFWO\ IRU IORZ FRQWURO ± QRW WUHDWPHQW DQG WKH
GLVFKDUJH LV ZLWKLQ óPLOH RI D SKRVSKRUXV VHQVLWLYH ODNH XVH WKH 3KRV
SKRUXV 7UHDWPHQW 0HQX RU ZLWKLQ ó PLOH RI D IUHVK ZDWHU GHVLJQDWHG IRU
DTXDWLF OLIH XVH RU WKDW KDV DQ H[LVWLQJ DTXDWLF OLIH XVH XVH WKH (QKDQFHG
7UHDWPHQW 0HQX
5HVLGHQWLDO SURMHFWV QRW RWKHUZLVH QHHGLQJ SKRVSKRUXV FRQWURO LQ 6WHS 6HH
&KDSWHU 97UHDWPHQW )DFLOLW\6HOHFWLRQ 3URFHVV S DV GHVLJQDWHG E\
86(3$ (FRORJ\ RU D ORFDO JRYHUQPHQW
3URMHFW VLWHV GLVFKDUJLQJ GLUHFWO\ RU LQGLUHFWO\ WKURXJK D PXQLFLSDO VHSDUDWH VWRUP
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
VHZHU V\VWHP WR %DVLF 7UHDWPHQW 5HFHLYLQJ :DWHUV OLVWHG LQ $SSHQGL[,&%DVLF
7UHDWPHQW 5HFHLYLQJ :DWHUV S
3URMHFW VLWHV WKDW GUDLQ WR IUHVK ZDWHUV RU WR ZDWHUV WULEXWDU\ WR IUHVK ZDWHUVWKDWDUH
QRW GHVLJQDWHG IRU DTXDWLF OLIH XVH RU WKDW GR QRW KDYH DQ H[LVWLQJ DTXDWLF OLIH XVH
/DQGVFDSHG DUHDV RI LQGXVWULDO FRPPHUFLDO DQG PXOWLIDPLO\ SURMHFW VLWHV DQG SDUNLQJ
ORWV RI LQGXVWULDO DQG FRPPHUFLDO SURMHFW VLWHV GHGLFDWHG VROHO\ WR SDUNLQJ RIHPSOR\HHV¶
SULYDWH YHKLFOHV ZKLFK GR QRW LQYROYH DQ\ RWKHU SROOXWLRQJHQHUDWLQJ VRXUFHV HJ LQGXV
WULDO DFWLYLWLHV FXVWRPHU SDUNLQJ VWRUDJH RI HURGLEOH RU OHDFKDEOH PDWHULDOZDVWHV RU
FKHPLFDOV
)RU GHYHORSPHQWV ZLWK D PL[ RI ODQG XVH W\SHV WKH %DVLF 7UHDWPHQW UHTXLUHPHQW VKDOO
DSSO\ ZKHQ WKH UXQRII IURP WKH DUHDV VXEMHFW WR WKH %DVLF 7UHDWPHQW UHTXLUHPHQW FRP
SULVHV RU PRUH RI WKH WRWDO UXQRII ZLWKLQ D WKUHVKROG GLVFKDUJH DUHD
3HUIRUPDQFH *RDO7KH %DVLF 7UHDWPHQW0HQX IDFLOLW\ FKRLFHV DUH LQWHQGHG WR DFKLHYH
UHPRYDO RI WRWDO VXVSHQGHG VROLGV IRU LQIOXHQW FRQFHQWUDWLRQV WKDW DUH JUHDWHU WKDQ
PJO EXW OHVV WKDQ PJO )RU LQIOXHQW FRQFHQWUDWLRQV JUHDWHU WKDQ PJO D
KLJKHU WUHDWPHQW JRDO PD\ EH DSSURSULDWH )RU LQIOXHQW FRQFHQWUDWLRQV OHVV WKDQ PJO
WKH IDFLOLWLHV DUH LQWHQGHG WR DFKLHYH DQ HIIOXHQW JRDO RI PJO WRWDO VXVSHQGHG VROLGV
7KH SHUIRUPDQFH JRDO DSSOLHV WR WKH ZDWHU TXDOLW\ GHVLJQ VWRUP YROXPH RU IORZ UDWH
ZKLFKHYHU LV DSSOLFDEOH 7KH LQFUHPHQWDO SRUWLRQ RI UXQRII LQ H[FHVV RI WKH ZDWHU TXDOLW\
GHVLJQ IORZ UDWH RU YROXPH FDQ EH URXWHG DURXQG WKH IDFLOLW\ RIIOLQH WUHDWPHQWIDFLOLWLHV
RU FDQ EH SDVVHG WKURXJK WKH IDFLOLW\ RQOLQH WUHDWPHQWIDFLOLWLHV SURYLGHGDQHW766
UHGXFWLRQ LV PDLQWDLQHG (FRORJ\ HQFRXUDJHV WKH GHVLJQ DQG RSHUDWLRQ RI WUHDWPHQW IDFLO
LWLHV WKDW HQJDJH D E\SDVV DW IORZ UDWHV KLJKHU WKDQ WKH ZDWHU TXDOLW\ GHVLJQIORZUDWHDV
ORQJ DV WKH UHGXFWLRQ LQ 766 ORDGLQJ H[FHHGV WKDW DFKLHYHG ZLWK LQLWLDWLQJ E\SDVV DW WKH
ZDWHU TXDOLW\ GHVLJQ IORZ UDWH 1RWH WKDW ZHWSRRO IDFLOLWLHV DUH DOZD\V GHVLJQHG WR EH RQ
OLQH7KH SHUIRUPDQFH JRDO DVVXPHV WKDWWKH IDFLOLW\ LV WUHDWLQJ VWRUPZDWHU ZLWK D W\SLFDO
SDUWLFOH VL]H GLVWULEXWLRQ )RU D GHVFULSWLRQ RI D W\SLFDO SDUWLFOH VL]H GLVWULEXWLRQ SOHDVH
UHIHU WR WKH VWRUPZDWHU PRQLWRULQJ SURWRFRO RQ (FRORJ\ ZHEVLWH
2SWLRQV$Q\ RQH RI WKH IROORZLQJ RSWLRQV PD\ EH FKRVHQ WR VDWLVI\ WKH EDVLF WUHDWPHQW
UHTXLUHPHQW
,QILOWUDWLRQ ±6HH&KDSWHU 9,QILOWUDWLRQ DQG %LRUHWHQWLRQ 7UHDWPHQW )DFLOLWLHV
S DQG &KDSWHU ,,,)ORZ &RQWURO 'HVLJQ S
6DQG )LOWHUV ±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV S
%LRILOWUDWLRQ 6ZDOHV ±6HH&KDSWHU 9%LRILOWUDWLRQ 7UHDWPHQW )DFLOLWLHV S
9HJHWDWHG )LOWHU 6WULS ±6HH&KDSWHU 9%LRILOWUDWLRQ 7UHDWPHQW )DFLOLWLHV
S
&RPSRVWDPHQGHG 9HJHWDWHG )LOWHU 6WULS &$9)6±6HH&KDSWHU 9
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH
,QILOWUDWLRQ DQG %LRUHWHQWLRQ 7UHDWPHQW )DFLOLWLHV S
%DVLF :HWSRQG ±6HH&KDSWHU 9:HWSRRO )DFLOLWLHV S
:HWYDXOW ±6HH&KDSWHU 9:HWSRRO )DFLOLWLHV SVHH QRWH
6WRUPZDWHU 7UHDWPHQW :HWODQG ±6HH&KDSWHU 9:HWSRRO )DFLOLWLHV S
&RPELQHG 'HWHQWLRQ DQG :HWSRRO )DFLOLWLHV ±6HH&KDSWHU 9:HWSRRO )DFLO
LWLHV S
%LRUHWHQWLRQ ±6HH&KDSWHU 9,QILOWUDWLRQ DQG %LRUHWHQWLRQ 7UHDWPHQW )DFLOLWLHV
S
1RWH:KHUH ELRUHWHQWLRQ LV LQWHQGHG WR IXOO\ PHHW WUHDWPHQW UHTXLUHPHQWV IRU LWV
GUDLQDJH DUHD LW PXVW EH GHVLJQHG XVLQJ DQ DSSURYHG FRQWLQXRXV UXQRII PRGHO WR
SDVV DW OHDVW RI WKH LQIOXHQW UXQRII ILOH WKURXJK WKH LPSRUWHG VRLO PL[
0HGLD ILOWHU 'UDLQ 0)'±6HH&KDSWHU 9)LOWUDWLRQ 7UHDWPHQW )DFLOLWLHV
S
(PHUJLQJ 6WRUPZDWHU 7UHDWPHQW 7HFKQRORJLHV ±6HH&KDSWHU 9(PHUJLQJ
7HFKQRORJLHV S
1RWH$ ZHWYDXOW PD\ EH XVHG IRU FRPPHUFLDO LQGXVWULDO RU URDG SURMHFWV LI WKHUHDUH
VSDFH OLPLWDWLRQV (FRORJ\ GLVFRXUDJHV WKH XVH RI ZHWYDXOWV IRU UHVLGHQWLDO SURMHFWV&RP
ELQHG GHWHQWLRQZHWYDXOWV DUH DOORZHG VHH 9%HVW 0DQDJHPHQW 3UDFWLFHV %03V
IRU :HWSRRO )DFLOLWLHV S
6WRUPZDWHU 0DQDJHPHQW 0DQXDO IRU :HVWHUQ :DVKLQJWRQ
9ROXPH 9 &KDSWHU 3DJH