Loading...
MECH REVISION COVER LETTER.pdfC � REVISION March 25, 2019 City of Edmonds Development Services Project: 10032 Edmonds Way — Permit #BLD2018-0892 Subject: MECH Permit Revision - Narrative MAN :! 5 2019 BUILDING DEPARTMENT CITY OF EDMONDS Westgate Village Overview: Provide and install one (1) 1.5-ton split system heat pump (HP/CU-3) and one (1) energy recovery unit (ERV-1) with associated duct work and fire & control dampers per plans. Eliminate one exhaust fan. Description: The above equipment has been added to the mechanical (HVAC) scope of this project due to a change in occupancy type of one of the Level 1 spaces —'Bikes Dog Wash & Kayaks L436' is now `Fitness L436'. Changes to the plans are clouded with revisions delta 12 & 14. Fresh air for the fitness room will be drawn in on Level 1 through a new louver (L-5). Stale air will be exhausted to the open garage adjacent to the fitness room. The space will be heated/cooled using the added split system heat pump. Note: HP/CU-4,5&6 (and associated equipment/duct work clouded with revision delta 13) should not be considered a revision to this permit at this time (see general note #1 on sheet MI. 1). Please call if you have any questions or comments. Sincerely, GB SYSTEMS, INC. Spencer Davidson HEATING AIR CONOITIONWM AIR S WATER BALANCING CONTROLS SERVICE