Loading...
MGP Stormwater Report.pdfSTOR'MWATER REPORT cffycoi New Shops Building RESUB, 21900 & 21904 Hwy 99 UOTOINOI Prepared By. �41 10 135 5E Sunnyside Road, Suite 200 Clackamas, OR 97015 April 2015 Revised: July 23, 2015 Updated November 12, 2015 Bryan Dickerson, P.E. NEW 'I (;J ?015 CITY f F,' IMYVATE Section Page Section A - Project Overview..... ..... ............ ............... ........... ................ .... Introduction......................................... ............. ____ ........ ,....................... ........... .......... 3 ExistingConditions.......................................................................... . .... .......................3 RedevelopedConditions ............................. ,............. ...,.,....................... ..... ..,,..................... 4 Section B -Minimum Requirements ......................................... ...... ......................,.......,..4 Minimum Requirement # 1: Preparation of Stormwater Site Plans........................................5 Minimum Requirement #2: Construction Stormwater Pollution Prevention Plan (SWPPP) .....5 Minimum Requirement #3: Source Control of Pollution ....... .............. ......... ...................... ..5 Minimum Requirement #4: Preservation of Natural Drainage Systems & Outfalls.................6 Minimum Requirement #5: On-site Stormwater Management.........................................„...6 Minimum Requirement #6: Runoff Treatment.........................................:...........„„,....,„...,..6 Minimum Requirement #7: Flow Control ........................................................................„,.6 Minimum Requirement #8: Wetlands Protection .................................................. ........ ..,...T Minimum Requirement #9: Operation and Maintenance.................................................7 Minimum Requirement #10: Offsite Analysis and Mitigation...............................................7 Minimum Requirement #11: Financial Liability.................................................................7 Section C - Final Soils Evaluation .......................................................................................8 SectionD - Source Control.................................................................................................8 Section E - On-site Stormwater Management BMPs...............................................................8 Section F - Runoff Treatment Analysis and Design ....................................... 8 Section G - Flow Control Analysis and Design.....................................................................9 Section H -Wetlands Protection ........................ ___ .............................. ...,....... .,,,... ,...,..,.9 Section I - Other Permits .............................................. 9 Section L - Maintenance and Operations Manual ..... ....... ..................... ,........ ,....... .,,,......,,,..9 Appendix..............................................................................,.,........,.,.,,..,,,...............,....„...10 Hwy 99 New Shops Building Page 2 Edmonds, WA Section A - Project Overview Introduction This stormwater report is prepared to discuss the proposed stormwater management system and to provide the documentation and the analysis showing that the proposed system is feasible and designed to address the jurisdictional requirements. All components of the stormwater management system were designed to meet the stormwater requirements of The City of Edmonds Chapter 18.30 Edmonds Community Development Code and Exhibit "A" Stormwater Code Supplement dated April 2010. The project site is located in the Top Food & Drug parking lot on 220th St. SW & Hwy 99 in Edmonds, Washington. The parcel lies on the southern edge of the existing parking lot, along the north side of 220th St. SW. The improvements also include the addition of six (6) parking stalls near the east driveway. A vicinity map is included in the appendix for reference (See Appendix A). According to the FEMA Flood Insurance Rate Map Number 53061 C1315E, dated November 9, 1999, the site is located within Zone X, described as areas determined to be outside the 0.2% annual chance floodplain. Existing Conditions The site is approximately 0.83 acres and is currently developed with an existing asphalt parking lot and limited vegetation. The site is west of the existing Starbucks on the corner of 220'h St. SW & Hwy 99. According to the Natural Resources Conservation Services (NCRS), the native soil underlying the site consists of Alderwood-Urban Land Complex (2-8% slopes). The Geotechnical Engineering Investigation report by GeoTest, dated 12/4/2014, found that soils within the site are glacial till. Stormwater runoff on the site and surrounding streets are managed through a system of catch basins and pipes. Within the subject site, runoff from the existing parking lot flows to catch basins throughout the proposed site. The stormwater drains to an existing underground stormwater vault where the flows are controlled and water is detained. The existing underground detention vault located north of.the project site, was constructed with the original Top Foods development. The underground vault provides stormwater detention for the runoff from the Top Foods building and the associated asphalt parking lot surrounding the building. The inside dimensions of the existing vault are 44 feet wide and 200 feet long. The internal height is 5.75 feet. The existing detention facility discharges runoff into a biofiltration swale west of Hwy 99. Stormwater that flows through the swale is collected by an 18 -inch pipe which also collects overflow from the detention vault, and connects to the existing public storm drainage system located within Hwy 99. Hwy 99 New Shops Building Page 3 Edmonds, WA Redeveloped Conditions The project proposes to develop an approximate 6,162 square foot retail pad building, with associated parking, landscaping, lighting, stormwater and utility improvements. The project will also include the addition of 6 parking stalls in the Top Foods parking lot, adjacent to the east driveway. The project will consist of approximately 0.83 acres of total land disturbance. An existing biofiltration swale is proposed to continue to manage runoff quality prior to discharge into the public storm system. Stormwater runoff from the developed site will be conveyed to the underground detention vault via curb and gutter and surface flow. To account for the 0.15 acres of new impervious area, an underground detention facility will be constructed in the area east of the building below the parking area. The rest of the site drains to the existing catchbasins located at the northeast limits of the project. Two catchbasins will be replaced with FloGard Perk Filter catchbasins to provide Phosphorus Treatment for the 17,758 SF of new/replaced asphalt within the project area as described below. After the stormwater is released it flows through a water quality Swale located northeast of the site along the Hwy 99 right of way. The stormwater system for this project has been designed in accordance with regulatory criteria described above and is consistent with sound engineering practice. This system's design has incorporated stormwater treatment BMP's for the mitigation of stormwater runoff quality impacts. Section B - Minimum Requirements The proposed site improvements will increase the amount of impervious surface in the project area by approximately 6,592 sf. The existing project area consists of approximately 23,284 SF of impervious area, with 12,842 SF of pervious area. All existing site improvements will be demolished as needed to accommodate the proposed development. The redeveloped project area will consist of approximately 29,876 SF of new/replaced impervious area and 6,250 SF of landscape area. Table 1 below summarizes each land disturbing activity for the proposed development and provides a Total Effective Impervious Surface for the Threshold Drainage Area (TDA). Table 1. Land -Disturbing Activity Existing Conditions (0.83 acres±) Existing Impervious Surface Area (SF) 23,284 Existing Landscaped Area 12,842 Proposed Conditions (0.83 acres±) Site Impervious Area Area (SF) 29,876* Site Pervious Area Total Land Disturbing Activity 6,250 36,126 Total Effective Impervious Surface 17,758** *Note the replacers rntpenrrnus area rncruaes i z, i i o sr or new ouilaing, plaza arru siueavdlK. **Effective Impervious Surface is new/replaced asphalt only. Hwy 99 New Shops Building Page Edmonds, WA The Minimum Requirements applicable for the site are determined by Section 2 of the 2010 Edmonds Stormwater Code Supplement (ESCS). Based on the flowchart, Minimum Requirements #1 through #10 apply to the Effective Impervious Surface. Based on coordination with City Engineering, the replaced impervious surface that meets the Top Foods flow control standard can continue to be routed to the existing detention vault. The new impervious area (6,592 SF) is detained and treated in the proposed underground detention and stormwater treatment catchbasins. The Western Washington Hydrologic Model (WWHM2012) was used to determine treatment flows proposed for the mitigated developed conditions. The required treatment flow for the Effective Impervious Area is 0.0544 CFS or 24.4 GPM. This treatment rate is achieved with the addition of 2 FloGard Perk Filter catchbasins. For these systems, WSDOE has approved treatment rates of 6.8 GPM/cartridge for the 12 -inch cartridges. Four (4) 12 -inch cartridges are required for treatment. Results of the continuous runoff simulation are provided as part of the WWHM2012 Project Report in the appendix (See Appendix Q. The project has been classified per Section 2 of Exhibit "A" Stormwater Code Supplement 2010 as a Category 2 Small Site Project. The Small Site Minimum Requirements that apply to the proposed development are as follows: Minimum Requirement #1: Preparation of Stormwater Site Plans The Stormwater Site Plan has been prepared in accordance with Section 5.1 — Preparation of Stormwater Site Plan in the Edmonds Stormwater Code Supplement. This Stormwater Site Plan summarizes the methods and analysis for design of the stormwater system for during and after construction. Minimum Requirement #2: Construction Stormwater Pollution Prevention Plan (SWPPP) An Erosion Control Plan is included with the application. The Construction Stormwater Pollution Prevention Plan (SWPPP) is a combination of the Temporary Erosion and Sediment Control (TESC) Plan and a Stormwater Spill Prevention Plan (SSPP). Per Section 5.2 of the ESCS, since the project is classified as a small site, only a TESC Plan is required. Minimum Requirement #3: Source Control of Pollution Available and reasonable source control BMPs have been selected, designed, and maintained in accordance with the 2010 Edmonds Stormwater Code Supplement (ESCS). All potential pollutant sources within the building will be routed to the sanitary sewer system. The Garbage dumpster area is enclosed and isolated from stormwater intrusion. The dumpster area has also been isolated such that any leakage from the dumpsters will be routed to a drain connected to the sanitary sewer system. Hwy 99 New Shops Building Page 5 Edmonds, WA Minimum Requirement #4: Preservation of Natural Drainage Systems & Outfalls The site is located within the Halls Creek Watershed according to Figure B-1 of Appendix B in the Edmonds Stormwater Code Supplement. All stormwater runoff from new/replaced impervious areas will receive phosphorus stormwater treatment prior to discharge downstream. The new impervious area's impact is mitigated with the addition of an underground detention facility that will control the release of stormwater. The areas of replaced impervious pavement will continue to drain to the existing underground detention vault and have zero impact to the downstream system. Minimum Requirement #5: On-site Stormwater Management The proposed project will employ on-site stormwater management BMPs to treat stormwater runoff in accordance with the requirements of 2010 Edmonds Stormwater Code Supplement (ESCS) without causing flooding and erosion. The proposed project increases the impervious area by 6,592 SF and is mitigated by the use of an underground detention facility that is sized using WWHM 2012 and does not negatively affect the watershed basin. Minimum Requirement #6: Runoff Treatment The project proposes approximately 14,315 SF of replaced pollutant generating impervious surfaces (PCIS) and 3,443 SF of new PGIS. The project proposes approximately 6,592 SF of total new impervious area (both PGIA and Non-PGIS). Through coordination with the City Engineer, phosphorus treatment will be required for the new and replaced PGIS. Under this storm, report, stormwater runoff from an equivalent area to that of the replaced paved areas will drain to Kristar FloGard Perk Filters (using ZPC Filter Media for Enhanced Treatment) catch basins for phosphorus treatment. Two FloGard Perk Filter catchbasins will be used to meet and exceed the required treatment areas. Catchbasin #1 will treat 10,318 SF and Catchbasin #2 will treat 10,690 SF of runoff area. See Basin Map Exhibit B-4 in Appendix B. The total treated area is 21,008 SF, which exceeds the required 17,758 SF of PGIS (see Appendix C for Water Quality Modeling). The proposed project exceeds the water quality requirements. Minimum Requirement #7: Flow Control Per Figure B-1 from the 2010 ESCS, the project is located in the Halls Creek drainage basin, which is tributary to Lake Ballinger. The total new and replaced impervious surface area associated with the project is 29,876 square feet. The underground detention facility will provide mitigation of storm water runoff from the roof of the building and surrounding area. Runoff from the remaining replaced impervious surface will continue to be mitigated by the existing detention vault. Based upon the construction drawings of the detention vault, the City determined that the vault can be used for Minimum Requirement #7 Flow Control for the replaced impervious associated with the project. Hwy 99 New Shops Building Page 6 Edmonds, WA Minimum Requirement #8: Wetlands Protection This requirement does not apply since the proposed project will not discharge to any known wetlands directly or indirectly through a conveyance system. Minimum Requirement #9: Operation and Maintenance An operation and maintenance manual (O&M Manual) is included per provisions outlined in Volume V of the DOE Stormwater Manual, for all proposed stormwater facilities and BMPs (See Appendix D) necessary for the project. The property owner will be responsible for the cost of installation, as well as operation and maintenance of the proposed onsite stormwater facilities. See the appendix for the O&M manual. Minimum Requirement #10: Offsite Analysis and Mitigation Based on previous reports prepared for redevelopment within the Top Foods property, the following downstream drainage course was outlined: The outlet from the flow control structure located within the existing detention vault discharges to the east via an 18 -inch CMP pipe. The pipe daylights into the biofiltration swale along the east side of the project site. During the time of the investigation, there was a visible flow of stormwater discharge through the swale. The swale flows north and is collected by an 18 -inch concrete pipe that continues north into a catch basin located at north end of the swale. The catch basin combines flows from the swale, the overflow from the detention vault, and the flow collected by two catch basins in the north entry drive. The combined flow from the catch basin connects with the existing drainage system located in the west side of Highway 99. The flow continues east to a catch basin located within the gutter flow line along the east side of Highway 99. The drainage system along the east side of Highway 99, continues north through a series of catch basins and pipes. The drainage system continues east along the south side of 216th Street SW for approximately 500 feet. The drainage system continues south and discharges into Halls Creek. There was no observed flooding or erosion within the approximate area of the outfall. The outfall into Halls Creek is located approximately 1,550 feet downstream from the project site. Halls Creek continues south within a vegetated channel and through various culvert crossings underneath roadways. Halls Creek eventually discharges to Lake Ballinger, located approximately 7,700 feet (1.5 miles) downstream from the project site. It does not appear that the proposed development will negatively impact the downstream drainage course. The new impervious area drains to the underground detention facility to mitigate flows prior to discharging to the downstream basin. Minimum Requirement #11: Financial Liability The project is a commercial project, which would normally require that a performance bond be posted as a financial guarantee for the required stormwater systems and BMPs related to the Construction Stormwater Pollution Prevention Plan. However, there are no public stormwater improvements onsite or in the public right of way. Therefore, no performance bond should be required. Hwy 99 New Shops Building Page 7 Edmonds, WA Section C —Soils Evaluation According to the Natural Resources Conservation Services (NCRS), the native soil underlying the site consists of Alderwood-Urban Land Complex (2-8% slopes), a Hydrologic Soil Group (HSG) B designation. A Web Soil Survey for the site is provided in the appendix (See Appendix A-2). The site is currently developed with asphalt parking covering over 90% of the area. Only a small landscape area currently exists within the limits of disturbance. Section D — Source Control Dust control and appropriate soil erosion control the construction phase of the proposed project. be handling hazardous material. measures shall be implemented as needed during The proposed commercial development will not Section E — On-site Stormwater Management BMPs Selection and design criteria for the on-site stormwater management BMPs are found in Volume III, Chapter 3 and Volume V, Chapter 5 of the DOE Stormwater Manual. The stormwater management BMP locations are shown on the Grading and Drainage Plan, Sheet C-2.0 (See Appendix B-2). Section F — Runoff Treatment Analysis and Design The pollution generating surfaces for the proposed project are summarized in Table 2, Table 2. Pollution Generating Surfaces Pollution Generating Surfaces Treatment Method Condition Area (SF) Existing - Pollution Generating Impervious Asphalt 23,284 Surfaces (PGIS) Pavement 13.6 Proposed - Pollution Generating Impervious Asphalt 17,758 Surfaces (PGIS) Pavement 13.6 Total Net PGIS Reduction Asphalt -5,526 Pavement Through coordination with the City Engineer, phosphorus treatment will be required for the new and replaced PGIS. Stormwater runoff from an equivalent area to that of the replaced paved areas will drain to FloGard Perk Filter catch basins for treatment. See Table 3b for Perk Filter sizing requirements. Table 3b. Equivalent Replaced PGIS Treatment Area New Impervious Area Equivalent Drainage Basins Treatment Method Drainage Treatment Area (SF) Flow (GPM) Catchbasin #1 Basin Perk Filter 12 -in 1 0,31 8 13.6 Double Cartridge Catchbasin #2 Basin Perk Filter 12 -in 10,690 13.6 Double Cartridge Hwy 99 New Shops Building Page 8 Edmonds, WA The required treatment is 24.4 GPM based on the WWHM on-line target treatment flow. The proposed system is approved for a treatment rate of 6.8 GPM/cartridge and will utilize two (2) double cartridge systems for a 27.2 GPM total treatment rate. Section G — Flow Control Analysis and Design Site Suitability for Stormwater Infiltration Based on the native soil classification the soils are classified as Hydrologic Soils Group B, which provides moderate infiltration rates of approximately 0.25 in/hr. However, the project does not propose any infiltration. Flow Control Facilities for the TDA Not Applicable per Section B, minimum requirement #7,. Section H — Wetlands Protection This requirement does not apply since the proposed project will not discharge to any wetlands directly or indirectly through a conveyance system. Section I — Other Permits Based on coordination with Ecology, an NPDES permit will not be required for this project since the project limit of land disturbance is expected to be less than 1 acre. Section L — Maintenance and Operation Manual An operation and maintenance manual (O&M Manual) is included per provisions outlined in Volume V of the DOE Stormwater Manual, for all proposed stormwater facilities and BMPs (See Appendix D). The property owner will be responsible for the cost of installation, as well as operation and maintenance of the proposed onsite stormwater facilities. Hwy 99 New Shops Building Page 9 Edmonds, WA Appendix Appendix A: Maps A-1: Vicinity Map A-2: Web Soil Survey A-3: FEMA Flood Insurance Rate Map Number 53061C1315E Appendix B: Site Plans B-1: Existing Site Topographic Survey B-2: Grading and Drainage Plan B-3: Erosion Control Plan B-4: Basin Map Appendix C: Data Output C-1: WWHM Water Quality Project Output C-2: WWHM Detention Facility Sizing Appendix D: Operation and Maintenance Manual Hwy 99 New Shops Building Page 10 Edmonds, WA APPENDIX AM MAPS A-1: Vicinity Map A-2: Web Soil Survey A-3: FEMA Flood Insurance Rate Map Number 53061C1315E py 1 % Iry /r � 'A ✓ /ray„ r ��r ^ � i >ri�'° �� e �% � nV �a � ' rir �� 9r �� i44 �i� � � y r '�'� �`i ri rIIM rl ; d // ✓/ r7 l '�Wi �j /F, fir r / / /i` ` l i we t !� Z, Hn/v 3" w rr MwWMk J,Wwry , / ilV�ar:�lu, 91 6J� oum �'� r cr 07 e �w1M`IINw'" ;rfvir,jil L! 220t h 'St ftSl AWN A 61, * A, 1 w .i w wr I %off w Jals , ��y w �r / **W n g, a8 �. � r � ,. lot- V.PawC, �rc orp r ' � wawma� �ww�wwr �, m r r0 Cu b t �/ dD�Ji LD1'20i °r If k, d� Ii/ ✓, y�PR ,iKP1N�/r,.� ,k Snohomish County Area, Washington 5—Alderwood-Urban land complex, 2 to 8 percent slopes Map Unit Setting • National map unit symbol: 2hz9 • Elevation: 50 to 800 feet Mean annual precipitation: 25 to 60 inches Mean annual air temperature: 48 to 52 degrees F Frost -free period: 180 to 220 days Farmland classification: Not prime farmland Map (last Composition • Alderwood and similar soils: 60 percent • Urban land: 25 percent • Minor components: 6 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description ofAldeo-wood Setting • Landform: Till plains • Parent material: Basal till Typical profile • H1 - 0 to 7 inches: gravelly ashy sandy loam • H2 - 7 to 35 inches: very gravelly ashy sandy loam • H3 - 35 to 60 inches: gravelly sandy loam Properties and qualities • Slope: 2 to 8 percent • Depth to restrictive feature: 20 to 40 inches to densic material • Natural drainage class: Moderately well drained • Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) • Depth to water table: About 18 to 36 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: Low (about 3.0 inches) Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 4s • Hydrologic Soil Group: B Other vegetative classification: Limited Depth Soils (G002XN302WA) A-2 E m m inN3AV m m AV 6D CO 0 sz3. p 0 0 nj ...... ..... . M7 on . ..... . . . ........................ Z 0) 0 .0 10 u C2 c tri > M!! Z. C) rc � �. 9. � m C) C.5 cm C/) Sk -n] a o' 6 & SL 3 FE > CA r rn 'a Sia, C.3 ac C.2 2 m m ohm n^ oom m m co j ou (D A 3 !2 72ND AVENUE WEST C/ OP 00 z 1, I cl >Z z C) b m 3AV H1.99 tO . . . .. . ......... .... M 3AV 0 m PRJAV H108 0 .1 m rn — —ji�NWV 0cf) H19L 0 C: I 71 T m m U) 0 sz3. p 0 0 nj ...... ..... . M7 on . ..... . . . ........................ Z 0) 0 .0 10 u C2 c tri > M!! Z. C) rc � �. 9. � m C) C.5 cm C/) Sk -n] a o' 6 & SL 3 FE > CA r rn 'a Sia, C.3 ac C.2 2 m m ohm n^ oom m m co j ou (D A 3 72ND AVENUE WEST C/ OP 00 z 1, I cl >Z z C) b m 3AV H1.99 tO C, H M 3AV HIL9 0 .1 m 0 sz3. p 0 0 nj ...... ..... . M7 on . ..... . . . ........................ Z 0) 0 .0 10 u C2 c tri > M!! Z. C) rc � �. 9. � m C) C.5 cm C/) Sk -n] a o' 6 & SL 3 FE > CA r rn 'a Sia, C.3 ac C.2 2 m m ohm n^ oom m m co j ou (D A 3 B-1: Existing Site Topographic Survey B-2: Grading and Drainage Plan B-3: Erosion Control Plan B-4: Basin Map v m y u„ LM Z "N C T 3 f W w., a" ail � 7 v - T _I N JS Lj v v �3 v.: j•.I C� CJ U ��' "� o �7 � y a o f h i c �. ooaoon ;1 - w..c� o « 0 000 a c -a 4. O o G�'� ✓" ° b 0 p gI w �41 1 d a u � a ar < .jW. wd402 — StUZ Zt -N B -P WNq N6YE�s�No�NZ�9�a1!WN 9JW�sRgowp w76�o4Wld� d N m Z Z J g LI ONE z 7 x I ___ \C A✓ J 9 m N z z \ •-,,,,� �... a o -- r� �� � m� ,�" III l pp ^h I t, ,•r"dy o ., '�'� \�;..v,W � `v,� � ��"`� V. �Au �r� f ,ivy g � • d \ v o,- h r r Y w ... � \ k •\.. 1�w—..� -. ��.(„4 � � \ I a �r }] I .W ,� Iff ° � is 141 III kt —_ , ��'�•�' ;��� ,�. � V � 5�I '�g$ a rx. � JI hl J r c c. o c i� ¢ cp c> o ia]a(a w�Z:Z - SIUZ 'Zt a�N 6W 2-A 1181Hk3\c6u!w]QZ\slaal!W1Y syuowpj�ua]6ufysoM\d W 1p 0 LU En ZS z x e a LU z VS2 KIN JW "up! ; 100H o�g R. Nigin, a M91 P all l u co H fill Sit . co . . ....... z1v co lix • 03 It t I JL In P !,,;t IF r4 AEN'IX C: data Out �t C-1: WWHM Water Quality Project Output C-2: WWHM Detention Facility Sizing Mitigated Land Use Basin 1 Bypass: Yes GroundWater: No Pervious Land Use Acres Pervious Total 0 Impervious Land Use Acres PARKING FLAT 0.41 Impervious Total 0.41 Basin Total 0.41 Element Flows To: Surface Interflow Groundwater Trapezoidal Pond 1 .41 acres 2015-11-12 11/12/2015 2:24:59 PM C-1 Water Quality Water Quality BM�P Flow and Volume for • O M r0.0365 acre-feet On-line-0.0544 cfs. Adjusted for 15 min: 0.0544 cfs. •ff-1,ine facility target flow,01.0307 cfs. AdwiUsted' o .41 acres 2015-11-12 11/12/2015 2:26:52 PM Page 18 MCG EDMONDS, WA Flows Summary t Event Pre -developed Post Developed Stage (ft) Outlet Mitigated Allowed (0501) (0701) (CFS) * (CFS) 2 0.0032 0.0451 1.22 0.0074 0.0075 10 0.0065 0.0727 1.79 0.0135 0.015 100 1 0.0111 0.1172 2.53 1 0.0256 0.027 * Allowable discharge - 0.05,0.10 and 0.18 cfs/acre impervious "� 'T'ank 1 Miflqated Facility Name Outlet 1 Downstream Connection Precipitation Appfied to Facility F, Evaporation Applied to Facility Facility Dimensions Facility Bottom Elevation (ft) Tank Type c cular .. Diameter (ft) Length (ft) Infiltration NO Facility Type Outlet 2 Outlet 3 Auto Tank OuickTank Facility Dimension Dia ram Outlet Structure Data I Riser Height (ft) r ---.=I Riser Diameter (in) 12 Riser Type Flat ^� Notch Type Orifice Diameter Height Number (in) (ft) 7 0.5 ^H Fo--- ^� 2 r4 ^6-1 2. Z ^� Tank Volume at Riser Head (ac -ft) .029 Show Tank TableOpen Table Intitial Stacie (ft) r IC -2 W HM2 1.2 PROJECT REPORT General Model Information Project Name: MCG Edmonds Pipes Site Name: MCG Site Address: City: Edmonds Report Date: 12/9/2015 MGS Region: Puget East Data Start: 1901/10/1 Data End: 2058/09/30 Timestep: 15 Minute DOT Data Number02 Version: 2014/01/24 POC Thresholds Low Flow Threshold for POC1 High Flow Threshold for POC1 50 Percent of the 2 Year 50 Year MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 2 Landuse Basin Data Predeveloped Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres C, Pasture, Mod 0.15 Pervious Total 0.15 Impervious Land Use Acres Impervious Total 0 Basin Total 0.15 Element Flows To: Surface Interflow Groundwater MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 3 Mitigated Land Use Basin 1 Bypass: No GroundWater: No Pervious Land Use Acres Pervious Total 0 Impervious Land Use Acres PARKING FLAT 0.15 Impervious Total 0.15 Basin Total 0.15 Element Flows To: Surface Tank 1 Interflow Groundwater MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 4 Routing Elements Predeveloped Routing MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 5 Mitigated Routing Tank 1 Dimensions Depth: Tank Type: Diameter: Length: Discharge Structure Riser Height: Riser Diameter: Orifice 1 Diameter: Orifice 2 Diameter: Element Flows To: Outlet 1 3 ft. Circular 3 ft. 180 ft. 3 ft. 12 in. 0.5 in. Elevation:0 ft. 4 in. Elevation:2.2 ft. Outlet 2 Tank Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs) 0.0000 0.000 0.000 0.000 0.000 0.0333 0.002 0.000 0.001 0.000 0.0667 0.003 0.000 0.001 0.000 0.1000 0.004 0.000 0.002 0.000 0.1333 0.005 0.000 0.002 0.000 0.1667 0.005 0.000 0.002 0.000 0.2000 0.006 0.000 0.002 0.000 0.2333 0.006 0.001 0.003 0.000 0.2667 0.007 0.001 0.003 0.000 0.3000 0.007 0.001 0.003 0.000 0.3333 0.007 0.001 0.003 0.000 0.3667 0.008 0.002 0.004 0.000 0.4000 0.008 0.002 0.004 0.000 0.4333 0.008 0.002 0.004 0.000 0.4667 0.009 0.002 0.004 0.000 0.5000 0.009 0.003 0.004 0.000 0.5333 0.009 0.003 0.004 0.000 0.5667 0.009 0.003 0.004 0.000 0.6000 0.009 0.004 0.005 0.000 0.6333 0.010 0.004 0.005 0.000 0.6667 0.010 0.004 0.005 0.000 0.7000 0.010 0.005 0.005 0.000 0.7333 0.010 0.005 0.005 0.000 0.7667 0.010 0.005 0.005 0.000 0.8000 0.011 0.006 0.005 0.000 0.8333 0.011 0.006 0.006 0.000 0.8667 0.011 0.007 0.006 0.000 0.9000 0.011 0.007 0.006 0.000 0.9333 0.011 0.007 0.006 0.000 0.9667 0.011 0.008 0.006 0.000 1.0000 0.011 0.008 0.006 0.000 1.0333 0.011 0.008 0.006 0.000 1.0667 0.011 0.009 0.006 0.000 1.1000 0.011 0.009 0.006 0.000 1.1333 0.012 0.010 0.007 0.000 1.1667 0.012 0.010 0.007 0.000 1.2000 0.012 0.010 0.007 0.000 MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 6 1.2333 0.012 0.011 0.007 0.000 1.2667 0.012 0.011 0.007 0.000 1.3000 0.012 0.012 0.007 0.000 1.3333 0.012 0.012 0.007 0.000 1.3667 0.012 0.013 0.007 0.000 1.4000 0.012 0.013 0.007 0.000 1.4333 0.012 0.013 0.007 0.000 1.4667 0.012 0.014 0.008 0.000 1.5000 0.012 0.014 0.008 0.000 1.5333 0.012 0.015 0.008 0.000 1.5667 0.012 0.015 0.008 0.000 1.6000 0.012 0.015 0.008 0.000 1.6333 0.012 0.016 0.008 0.000 1.6667 0.012 0.016 0.008 0.000 1.7000 0.012 0.017 0.008 0.000 1.7333 0.012 0.017 0.008 0.000 1.7667 0.012 0.017 0.008 0.000 1.8000 0.012 0.018 0.008 0.000 1.8333 0.012 0.018 0.008 0.000 1.8667 0.012 0.019 0.009 0.000 1.9000 0.011 0.019 0.009 0.000 1.9333 0.011 0.019 0.009 0.000 1.9667 0.011 0.020 0.009 0.000 2.0000 0.011 0.020 0.009 0.000 2.0333 0.011 0.021 0.009 0.000 2.0667 0.011 0.021 0.009 0.000 2.1000 0.011 0.021 0.009 0.000 2.1333 0.011 0.022 0.009 0.000 2.1667 0.011 0.022 0.009 0.000 2.2000 0.011 0.023 0.009 0.000 2.2333 0.010 0.023 0.086 0.000 2.2667 0.010 0.023 0.118 0.000 2.3000 0.010 0.024 0.142 0.000 2.3333 0.010 0.024 0.163 0.000 2.3667 0.010 0.024 0.181 0.000 2.4000 0.009 0.025 0.198 0.000 2.4333 0.009 0.025 0.213 0.000 2.4667 0.009 0.025 0.227 0.000 2.5000 0.009 0.026 0.240 0.000 2.5333 0.009 0.026 0.253 0.000 2.5667 0.008 0.026 0.265 0.000 2.6000 0.008 0.026 0.276 0.000 2.6333 0.008 0.027 0.287 0.000 2.6667 0.007 0.027 0.297 0.000 2.7000 0.007 0.027 0.307 0.000 2.7333 0.007 0.027 0.317 0.000 2.7667 0.006 0.028 0.327 0.000 2.8000 0.006 0.028 0336 0.000 2.8333 0.005 0.028 0.345 0.000 2.8667 0.005 0.028 0.354 0.000 2.9000 0.004 0.028 0.362 0.000 2.9333 0.003 0.029 0.371 0.000 2.9667 0.002 0.029 0.379 0.000 3.0000 0.000 0.029 0.387 0.000 3.0333 0.000 0.000 0.454 0.000 MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 7 Analysis Results POC 1 UV MW_ m.._ ----- W.n.._...........I � 9- 05 1 2 „ 10 g; ,� bYrn '4C1 95 98 99 995 tl."� + Predeveloped x Mitigated Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.15 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0 Total Impervious Area: 0.15 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.003173 5 year 0.005111 10 year 0.006488 25 year 0.008299 50 year 0.009688 100 year 0.011103 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.007351 5 year 0.010659 10 year 0.013483 25 year 0.017896 50 year 0.021888 100 year 0.026567 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1902 0.004 0.008 1903 0.002 0.007 1904 0.004 0.007 1905 0.002 0.007 1906 0.001 0.006 1907 0.005 0.009 1908 0.003 0.007 1909 0.003 0.007 1910 0.005 0.008 1911 0.003 0.007 MCG Edmonds Pipes 12/9/2015 8:49:06 AM Page 8 1912 0.015 0.008 1913 0.004 0.007 1914 0.001 0.007 1915 0.002 0.006 1916 0.003 0.007 1917 0.001 0.007 1918 0.003 0.007 1919 0.002 0.006 1920 0.003 0.007 1921 0.003 0.007 1922 0.003 0.008 1923 0.002 0.007 1924 0.002 0.006 1925 0.002 0.006 1926 0.003 0.007 1927 0.003 0.007 1928 0.002 0.007 1929 0.005 0.008 1930 0.003 0.007 1931 0.003 0.007 1932 0.002 0.007 1933 0.003 0.007 1934 0.007 0.009 1935 0.003 0.006 1936 0.004 0.007 1937 0.004 0.008 1938 0.003 0.007 1939 0.001 0.006 1940 0.003 0.008 1941 0.003 0.006 1942 0.004 0.008 1943 0.002 0.007 1944 0.006 0.066 1945 0.003 0.007 1946 0.003 0.006 1947 0.002 0.007 1948 0.006 0.009 1949 0.006 0.018 1950 0.003 0.007 1951 0.003 0.006 1952 0.009 0.029 1953 0.007 0.031 1954 0.003 0.007 1955 0.002 0.006 1956 0.002 0.005 1957 0.004 0.007 1958 0.008 0.011 1959 0.005 0.007 1960 0.002 0.006 1961 0.005 0.009 1962 0.003 0.008 1963 0.002 0.006 1964 0.007 0.007 1965 0.006 0.009 1966 0.001 0.007 1967 0.003 0.006 1968 0.003 0.008 1969 0.003 0.007 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 9 1970 0.004 0.008 1971 0.006 0.009 1972 0.012 0.008 1973 0.005 0.009 1974 0.003 0.008 1975 0.006 0.009 1976 0.003 0.008 1977 0.002 0.006 1978 0.006 0.009 1979 0.002 0.007 1980 0.003 0.006 1981 0.003 0.007 1982 0.002 0.006 1983 0.005 0.008 1984 0.002 0.007 1985 0.003 0.007 1986 0.003 0.007 1987 0.006 0.009 1988 0.003 0.007 1989 0.003 0.007 1990 0.004 0.008 1991 0.003 0.008 1992 0.004 0.008 1993 0.004 0.008 1994 0.006 0.009 1995 0.002 0.006 1996 0.007 0.009 1997 0.003 0.007 1998 0.003 0.008 1999 0.000 0.006 2000 0.002 0.007 2001 0.002 0.006 2002 0.006 0.007 2003 0.004 0.008 2004 0.003 0.007 2005 0.005 0.007 2006 0.002 0.006 2007 0.003 0.008 2008 0.003 0.007 2009 0.002 0.007 2010 0.002 0.009 2011 0.002 0.006 2012 0.004 0.009 2013 0.002 0.007 2014 0.002 0.006 2015 0.014 0.007 2016 0.001 0.006 2017 0.005 0.028 2018 0.008 0.037 2019 0.011 0.063 2020 0.003 0.007 2021 0.004 0.008 2022 0.002 0.006 2023 0.003 0.007 2024 0.014 0.008 2025 0.003 0.007 2026 0.005 0.008 2027 0.003 0.007 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 10 2028 0.001 0.006 2029 0.003 0.007 2030 0.006 0.009 2031 0.002 0.006 2032 0.002 0.005 2033 0.002 0.006 2034 0.002 0.007 2035 0.007 0.026 2036 0.004 0.008 2037 0.001 0.007 2038 0.004 0.009 2039 0.001 0.006 2040 0.002 0.007 2041 0.002 0.007 2042 0.008 0.046 2043 0.004 0.008 2044 0.004 0.008 2045 0.003 0.007 2046 0.003 0.007 2047 0.002 0.006 2048 0.003 0.008 2049 0.003 0.008 2050 0.002 0.007 2051 0.004 0.009 2052 0.002 0.008 2053 0.003 0.007 2054 0.008 0.008 2055 0.002 0.006 2056 0.001 0.007 2057 0.002 0.007 2058 0.003 0.006 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0149 0.0665 2 0.0141 0.0628 3 0.0140 0.0455 4 0.0124 0.0372 5 0.0108 0.0307 6 0.0091 0.0292 7 0.0083 0.0280 8 0.0083 0.0257 9 0.0078 0.0184 10 0.0076 0.0113 11 0.0075 0.0094 12 0.0074 0.0092 13 0.0074 0.0090 14 0.0069 0.0090 15 0.0066 0.0089 16 0.0064 0.0089 17 0.0063 0.0089 18 0.0061 0.0088 19 0.0061 0.0087 20 0.0061 0.0087 21 0.0060 0.0086 22 0.0058 0.0086 23 0.0058 0.0086 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 11 24 0.0058 0.0086 25 0.0057 0.0086 26 0.0055 0.0086 27 0.0053 0.0085 28 0.0051 0.0085 29 0.0051 0.0084 30 0.0049 0.0083 31 0.0048 0.0083 32 0.0048 0.0083 33 0.0048 0.0081 34 0.0047 0.0081 35 0.0047 0.0081 36 0.0045 0.0081 37 0.0045 0.0081 38 0.0044 0.0080 39 0.0044 0.0080 40 0.0043 0.0080 41 0.0043 0.0079 42 0.0042 0.0079 43 0.0042 0.0079 44 0.0041 0.0078 45 0.0040 0.0078 46 0.0039 0.0078 47 0.0039 0.0078 48 0.0038 0.0078 49 0.0038 0.0078 50 0.0038 0.0077 51 0.0038 0.0077 52 0.0037 0.0077 53 0.0037 0.0076 54 0.0037 0.0076 55 0.0035 0.0075 56 0.0035 0.0075 57 0.0035 0.0075 58 0.0035 0.0075 59 0.0034 0.0075 60 0.0034 0.0075 61 0.0034 0.0075 62 0.0034 0.0075 63 0.0033 0.0075 64 0.0033 0.0074 65 0.0033 0.0074 66 0.0032 0.0074 67 0.0032 0.0074 68 0.0032 0.0074 69 0.0032 0.0074 70 0.0032 0.0074 71 0.0032 0.0074 72 0.0032 0.0074 73 0.0032 0.0073 74 0.0031 0.0073 75 0.0031 0.0073 76 0.0031 0.0073 77 0.0031 0.0072 78 0.0031 0.0072 79 0.0031 0.0072 80 0.0030 0.0072 81 0.0030 0.0071 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 12 82 0.0030 0.0071 83 0.0030 0.0071 84 0.0030 0.0071 85 0.0030 0.0071 86 0.0029 0.0071 87 0.0029 0.0070 88 0.0029 0.0070 89 0.0029 0.0070 90 0.0029 0.0070 91 0.0028 0.0070 92 0.0028 0.0070 93 0.0028 0.0069 94 0.0028 0.0069 95 0.0028 0.0069 96 0.0027 0.0069 97 0.0027 0.0069 98 0.0027 0.0069 99 0.0027 0.0069 100 0.0027 0.0069 101 0.0026 0.0069 102 0.0026 0.0069 103 0.0026 0.0069 104 0.0025 0.0068 105 0.0025 0.0068 106 0.0025 0.0068 107 0.0025 0.0068 108 0.0025 0.0068 109 0.0024 0.0068 110 0.0024 0.0068 111 0.0023 0.0068 112 0.0023 0.0068 113 0.0023 0.0067 114 0.0023 0.0067 115 0.0022 0.0067 116 0.0022 0.0067 117 0.0022 0.0067 118 0.0022 0.0067 119 0.0022 0.0066 120 0.0022 0.0066 121 0.0022 0.0066 122 0.0022 0.0066 123 0.0021 0.0065 124 0.0020 0.0065 125 0.0020 0.0064 126 0.0020 0.0064 127 0.0020 0.0064 128 0.0019 0.0064 129 0.0019 0.0064 130 0.0019 0.0063 131 0.0019 0.0063 132 0.0018 0.0063 133 0.0018 0.0063 134 0.0018 0.0062 135 0.0018 0.0062 136 0.0017 0.0062 137 0.0017 0.0062 138 0.0017 0.0062 139 0.0017 0.0062 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 13 140 0.0017 0.0061 141 0.0017 0.0061 142 0.0016 0.0061 143 0.0016 0.0061 144 0.0016 0.0061 145 0.0016 0.0061 146 0.0016 0.0060 147 0.0015 0.0060 148 0.0015 0.0060 149 0.0015 0.0060 150 0.0014 0.0059 151 0.0013 0.0057 152 0.0012 0.0057 153 0.0011 0.0057 154 0.0009 0.0056 155 0.0009 0.0056 156 0.0006 0.0055 157 0.0002 0.0054 MCG Edmonds Pipes 12/9/2015 8:56:58 AM Page 14 Analysis Results POC 1 001 001 0 L 000 0' 11,5 10E-4 10E-3 10E-2 10E-1 ,1 .,. 1'0 -_. 1M P�ro�r�t Time FEE o— + Predeveloped Predeveloped Landuse Totals for POC #1 ��.�.m.m............. Ar+hry 'K k A6.iwe'" 4 e Cb P 2 19 „„ „4 a, 90 95 96 99 99.5 1 $ IINA i to Total Pervious Area: 0.15 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0 Total Impervious Area: 0.15 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.003173 5 year 0.005111 10 year 0.006488 25 year 0.008299 50 year 0.009688 100 year 0.011103 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.007333 5 year 0.010473 10 year 0.013121 25 year 0.017216 50 year 0.020884 100 year 0.02515 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1902 0.004 0.008 1903 0.002 0.007 1904 0.004 0.007 1.905 0.002 0.007 1906 0.001 0.006 1907 0.005 0»009 1908 0.003 0.007 1909 0.003 0.007 1910 0.005 0.008 1911 0.003 0.007 MCG Edmonds Pipes 11/12/2015 2:32:06 PM Page 8