Loading...
Michel 2006-0794 to 801 Pls Respond 9-7-06.pdfCITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering September 7th, 2006 Michel Construction Dwight McGrew 7907 212th St SW #102 Edmonds, WA 98026 RE: Plan Check 2006-0971 thru 2006-0801 / 8 Condo Units Dear Dwight McGrew: GARY HAAKENSON MAYOR Please respond to the enclosed comments from Jenny Readwin, Steve Bullock, and Lyle Chrisman dated 8/2/06, 8/3/06, and 8/1/06 regarding your building application. When we receive the requested information the reviewers will be able to continue with the plan review. If you have any questions please don't hesitate to contact us. Sincerely; G Permit Coordinato Encl.: Plan review corrections L1Temp1DST'slMaster Letters\Pls Respond ' Incorporated August 11, 1890 ' Sister City - Hekinan, Japan O� E� City- of Edmonds y ::;..:. 0 PLAN REVIEW COMMENTS BUILDING- DIVISION (425) 771.0220 DATE: August 2, 2006 TO: Michel Construction Inc. michelbz@nwlink.com FROM: Jenny Readwin, Plans Exam' e RE: Plan Cheek # 2006-0794 through 2006-0801 Project: 8 SFR Development Project Address: 82 d and 212th During review of the above noted application, it was found that the following information, corrections, or'clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator.. 1) Soils report from Dennis M. Bruce, PE dated June 21, 2006 specifies that 4 test pits were dug. Provide site plan from Dennis M. Bruce, PE showing test pit locations as well as soil logs for each test pit as required by IRC chapter 4. 2) Specify if S' concrete retaining wall shown on the site plan along 212th is existing or proposed. If proposed provide top and bottom wall elevations as well as construction details. 3) Remove all arbor details on sheet 9 from the plains if they do not apply. I did not see any . proposed arbors on the site plan or elevation views. 4) Show all eaves on the site plan along the driveway entrance. 5) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 96359 boyt}eter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh City of Edmonds Edmonds, WA 98020 Re: Michel SFR 82nd Pl. W. @ 212th St. S.W. Edmonds, WA 98020 Plan Review # 2006-794 & 06-795 EECE # EDM 06-37 Structure Stated Area S.F. First floor 679 Second floor 995 Total 1674 Garage 454 Grand total 2128 Date: July 21, 2006 Note Two plans are identical for 794 and 795: This letter applies to both structures. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmentalrequirements, conditions and concerns before permit approval. Page 2 of 3 EECE#: <<ProjectlD>> oProjectDescription>> STRUCTURAL COMMENTS Sheet A3: First Floor Plan 1. Please provide details on the drawings for the guard rails shown at the opening to below. This is required to resist 200 pounds applied in any directions and 50 psf for the infill's. IBC 1 OTT1.1,1BC 1607.7.1.2 and IRC table 8301.5 Sheet S3 Shear Wall Pian 2. EOR please provide a foundation plan for this house. This sheets state all the footing information is per the foundation plan. The only foundation plan is sheet A5 which also states footing per foundation plan. This plan should give the required reinforcement, 90 degree hooks specified in the footings, etc. Please add this to the drawing in order to complete the foundation review of this structure. IBC 106. 1.1 and IBC 1805 3. EOR please clarify note that state joist per A7. This sheet is for the roof framing. I believe the intent is to reference A6. Please modify accordingly. IBC 1.06 4. Architectural drawings show the Joists and Beams in the same plan and hangers are required to be specified. I was unable to find on the drawing where the required size was specified. Please add this to the drawings or clarify where this is shown on the drawings. IBC 2304.9; IBC 2304.9.6 5. Please add to the drawings the required hanger to use for the support of Beam 6 supported by Beam 7. IBC 2304.9;)BC 2304.9.6 6. Please add to the drawing the required hanger to use for the support of Beata 5 supported by Beam 7. IBC 2304.9; IBC 2304.9.6 7. Please add to the drawing the required hanger to use for the support of Beata 4 supported by Beam. 7. ( There are other locations where the size of the hangers are not specified so please modify drawings to specify the required hangers) IBC 2304.9; IBC 2304.9.6 8. EOR please specify the required nailing of the plywood diaphragm to the drag joist. This is required to drag the horizontal diaphragm forces into the shear walls. Based on the plywood layout (perpendicular to the joist) the nailing could be all field nailing of 12" OIC which would not transfer this forces. Please add to the drawing or point out where it is specified. 113C 1620.2.6 Sheet S-4 Shear wall Plan Page 3 of 3 EECE#: <<Projec1IM <<Proj ectDescription» 9. EOR please specify the required axial load the truss manufactures is required to design the GT#1 and GT#2 girder trusses. These members are collector elements to transfer the horizontal shear forces into the shear walls. IBC 106.3.4.2 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Buckling Department plan review when comments are received from the other concerned departments. -Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hpAeterl_centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh City of Edmonds Edmonds, WA 98020 Re: Michel SFR Date: July 21, 2006 21215 and 2121182nd PL w Edmonds, WA 98020 Plan Review # 2006-796 8r 06-797 EECE # EDM 06-38 Structure Stated Area S.F. First floor 721 Second floor 1005 Total 1726 QgIgge 1 431 Grand total 1 2157 Note Two plans are identical for 796 and 797: This letter applies to both structures. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 2 EECE#: EDM 06-38 Michel SFR Plan Review Number 2006- (796 & 797) STRUCTURAL COMN[ENTS Sheet S3 Shear Wall Plan 1. EOR please provide a. foundation plan for this house. This sheets state all the footing information is per the foundation plan. The only foundation plan is sheet A5 which also states footing per foundation plan. This plan should give the required reinforcement, 90 degree hooks specified in the footings, etc. Please add this to the drawing in order to complete the foundation review of this structure. IBC 10611 and IBC 1805 2. EOR please clarify note that state joist per AT This sheet is for the roof framing. I believe the intent is to reference A6. Please modify accordingly. IBC 106 3. Architectural drawings show the Joists and Beams M the same plan and hangers are required to be specified. I was unable to find on the drawing where the required size was specified. Please add this to the drawings or clarify where this is shown on the drawings. IBC 2304.9; IBC 2304.9.6 4. EOR please add a collector element in line with shear wall mark 1. Also please specify the required nailing of the plywood diaphragm to this joist. This is required to drag the horizontal diaphragm forces into the shear walls. Based on the plywood layout (perpendicular to the joist) the nailing could be all field nailing of 12" OIC which would not transfer this forces. Please add to the drawing or point out where it is specified. IBC 1620.2.6 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (253) 857-4151 between 8:00 a.m. and 5:00 pan. By: Hoyt Jeter, P.E. President ywr- :�: N; ? City of Edmonds Plan -Review Corrections Plan Check # Date Project Name/Address �F� t.Z� `J EKZ- zu4� Contact Person/Address�l,f�il,. - Department: Building ❑ Engineering ❑ Planning Id Fire ❑ Public Works ❑ Reviewer_ O i�Lc�r� 14t2fL- 27014 �- e2269L0 � ❑ Submit 2 sets of revised plans/documents to the Permit Coordinator. ❑ Corrections may be made by red lining plans/documents on file with the City. DATE gANE3i' f (Attach fax transmittal) PAGE OF � - Sheet 2 13. Provide street cross sections on 82`1 Ave to show existing pavement slope and new pavement slope to curb line. 14. With the existing cb at the north end, being raised, the cb must be changed to a type II because the grade to invert will be 6' or more. In addition, the lid needs to be changed to a solid locking lid. 15. Indicate on the drawing that all the street curbing shall be painted yellow. 16. Show mailbox cluster location and increased sidewalk width accordingly. 17. Footing drains cannot connect to the detention system. Indicate separate lines and connection point of footing drains. 18. Provide invert elevations of the the roof tightlines at the yard basins and slope of the pipes. 19. The control structure cb is not sized correctly to handle the 2.5' detention pipe. 20. Provide additional turn- around at the end of the access road for the end units. 21. Will the trash and recycle containers be kept in the garages? If not show the location of the trash/recyle enclosure. 22. Provide inverts of 4" pipe at cb,2 and cb-3. 23. The extruded curbing shown shall terminate at the property line, Use standard curb and gutter within the right- of-way, including the curb radii. Sheet 3 24. Show the location of the existing sewer laterals to the property line and connection of new lines to those laterals if the existing laterals can be reused. If the lines cannot be reused, show where the laterals will connect to the main. 25. Show new sewer cleanouts on the right-of-way side at the property line. 26. Show water service line location to each unit. Maintain required clearances between utilities. 27. Show location of existing water meters. Will either of the existing meters be used for irrigation? If existing meters will not be reused, place a note on the drawing that the water services must be disconnected and turned off at the main. 28. Provide invert elevations for the sewer Iaterals and side sewers. Drainage report 29. See attached pdf documents. General 30. Please provide a traffic control plan. 31. Submit an engineers estimate or contractor's bid so the bond amount and inspection fee can be determined. DATE FAXED (Attach fax transmittal) PAGE OF S:\ENGR%PRIVAT1r DEVELOMENT PROJECTMEVIEWTOMM-MULTI & LU12 M20060794 michel 8 unit condo €rview Ldoc �1 � U � Q N N `F LL 4 to Il to u7 N g S 4 W 44�. MICHEL 82nd PLACE WEST CONDO'S -parre I 0034 BASIN SIRMARY BASIN iD: 002EXIST SCS METHODOLOGY TOTAL AREA.......; RAINFALL TYPE....: PRECIPITATION....: TIME INTERVAL....: NA%IIIE: 2 YEAR 24 HOUR EXISTING 0.56 Acres TYPE IA 1.50 .inches 10.00 min BASEFLOWS: AREA. GN.... TC..... 0.'00 f PERV,5f --0.7 Acres 85.00 14..:68 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 26.0-1 ns:0.150D p2yr: 3.-570 _S,0_ -x:'923 TcReach - Sheet L: 123.00 ns : 0. 3.500 p2yr: .1.50 s:0.0407 PEAK RATE: 0.07 cfs VOL: 0.03 Ac -ft TIME: 510 min BASIN ID: 010EXIST SCS METHODOLOGY TO'T'AL AREA ....... . RAINFALL TYPE.....: PRECIPITATION....: TIME INTERVAL....: NAME, .10 YEAR 24 .HOUR EXIST -ISG 0.56. Acres TYPE,IA 2 '00 i -aches 10.00 min BABE:'E" LOWS . AREA..: CN..... TC..... 0. X10 cfs PERU , 0.TS Acres 85.00 14.68 min ABSTRACTION COEFF: D.-20 TcReach - Sheet L: 46.00 ns:0.3.500 p2yr: 1.50 s:0.1923 TcReach - Sheet L:,.123.00 ns:0.1500 p2yr: 1.50 s.zj0_..13407 PEAK RATE: 0.12 cfs VOL: 0.05 Ac --ft TIME: 510 min BASIN ID: 100EXIST SCS METHODOLOGY TOTAL AREA.......: RAINFALL TYPE....: PRECIPITATION....: TIME INTERVAL....: NAME: 100 YEAR 24 HOUR EXISTING 0.56 Acres TYPEIA 3.00 inches 10.00 min BASEFLOWS: AREA..: CN..... TC..... 0.0 cfs DERV .� 0.'4.3 Acres 85.00 14 6B min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 26.00 ns:0.1500 p2yr., 1,50 %4.0.1923 TcReach - Sheet L: 123.00 ns:0.1500 p2yr: 1.50 s:0.0407 PEAK RATE: 0.23 cfs VOL: 0.08 Ac -ft TIME:- 510 min IMP 0 D IS Acres 98.09 38 min TMP 0 . M Acres 98.00 14.68 min imp o 1). Acres 98. OD .1-4.58 min MICHEL 82nd PLACE BEST CONDO'S LEVL POE)L Tpi&LE SUMKAR i4ATCH INn-OW STO— MS-- STORAgE lbe4k- 2_YEA$?4FOR ............,.... 100 YEAR 24 HOUR ............. (i,-0 0.23 Q.11. 0.29 PL {13. 4152. Al P1 01 416.99 G. -U4'U 0 20 .-H5.00 C9 0 315.55 cf 0.O7 e) a j 2- C�. .7_5