Loading...
Microsoft Word - 10-0567 Wilkie addition.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 8/31/10 TO: Leslie and Todd Wilkie st 23401 101 Ave N Edmonds, WA 98020 RE: Plan Check: BLD20100567 Project: Addition Project Address: same During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1.Engineer of record: a.Building section A-A shows the ceiling joists/rafter ties being removed to create a vaulted ceiling. Provide a suitably sized ridge beam and rafters or justify with calculations. The existing walls do not appear to be aligned to be used as bearing walls without justification. b.The front wall is identified as a perforated shear wall. Identify the applicable shearwall type from sheet S1. Are anchor bolts required to be retrofitted in the existing foundation? Is the floor diaphragm to be edge blocked at that location, or how is the shear to be transferred from the wall to the foundation? c.With the new 4x12 beam located above the roof line, the beam will then require a deep snipe cut to fit below the top of the truss. Provide a detail showing maximum cut, and justify. Include connection requirements. An option might be a manufactured girder truss. d.Pages 4-12 of the calculation package do not appear to identify the specific locations of the joists/beams. The floor framing plan does not match the calculations with 12’ joists on the former and 15’6” on the latter. e.Provide nailing connection requirements for built up joists. f.Provide “tie” connection requirements for 2x6 furred rafters at vault. Pat Lawler, CBO patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x1703