Mietzner-Foundation Revision.pdfIVlietzner Brothers Properties, LLC
244th St Project, Edmonds —11 Lots
Revised: 3/7/2019
To whom it may concern
The following changes have been made to all plan sets for all lots in the 244th St project to implement
slab on grade first floor instead of crawl space:
A2: Slab on Grade plan implemented; Detail 6/A2 altered; Detail 5/A2 removed; Detail 10/A2 added
A3: Section A updated to slab on grade
A5: Type 2 Story Section updated to slab on grade
WSEC: Energy Calcs updated to slab on grade with new max BTUH
Thank you
Doug Williams
Designer
425 530-1042
dougwilliams444@gmail.com