Loading...
Mione SFR-Engineering Comments 2-bld20171839.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:February 13, 2018 June 8, 2018 TO:Jacob Strobl Strobl Design jacob@strobldesign.com FROM:Mitch Boyd, Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20171839 Project: Mione-Single Family Residence–Lot B Project Address: 19015 Olympic View Drive During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. Comments in bold were authored on June 8, 2018 GENERAL 1)This is a reminder to submit a ROW Permit Application SubmitROW Permit Applicationform 2)OK Submit Side Sewer Permit Applicationform 3)OK A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 4)It was noted that not all easement information has an associated AFNas it was recorded under the short plat. Please add anote that referencesthe short plat where the easement documentation is available. Please show all private easement information within the plan sets. Note AFN’s for existing easements and/or recording documents for proposed easements as applicable. 5)OK Please note: additional comments not included in this reviewmay be produced after reviewing the next submittal. TESC 6)OK Orange protective barrierfencing shall be placed around areas proposed for low impact development techniques such as infiltration systemsto protect the area from compaction.It appears the proposed construction entrance will extend over two proposed infiltration trenches. Please indicate how these soils will be protected from compaction. 7)OK Add a note that the stockpile is to be covered within 24 hours 8)OK Please add a note to the plans that all disturbed soils will be compost amendedper BMP T5.13. DRAINAGE AND GRADING PLAN 9)OK Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please indicate this requirement on the plans.Double check driveway slopes to ensure they do not exceed 14% and label slope on the plans. 10)OK Label driveway surface material. The driveway approach shall be asphalt within the right- of-way and can transition to concrete on private property. 11)OK With the steep driveway grading, it will be difficult to capture all stormwater in the area drain near the property line. Please provide an asphalt berm or a trench drain nearthe property line (on private property) to more effectively capture stormwater. 12)OK Per the retaining wall tops/toes, the southwest edge of the parking area in the driveway should be flat. However, a 5% slope is shown. Please clarify the grading in this area. 13)OK Near the southeast corner of the parking area, there is a gap in the retaining walls. Please clarify grading in this area. 14)OK Provide proposed contours on the east side of the retaining walls. 15)OK Please provide spot elevations at all stairwell landings. 16)OK Please show the floor elevations for the proposed residence. 17)Thefollowing note was not found. Please provide. Utility patches shall be combined and full width or half width overlay will be required depending ontheextent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into bothtravel lanes then a full width overlay is required.Please indicate this requirement on the plan. Page 2of 4 18)OK The southwest infiltration trench is too close to the south property line. Please provide 5’ of horizontal distance between the edge of the cleanout and the property line. 19)OK–Please provide a detail for the proposed footing drywell. Per the geotechnical engineering report, building footing drains are recommended. If footing drains are proposed, please provide the footing drain invert elevation and discharge location. Show where the footing drains connect into the stormwater system. Include all relevant design information. 20)The response provided does not match what is shown on the plan. Assuming the retaining wallfooting drains will connect to the footingdrain drywell, please show how the retaining wall footing drains will connect to the proposed footing drywell. Are retaining wall footing drains to be installed? If so, please show how the retaining wall footing drains connect to the proposed stormwater system. Provide all relevant design information. 21)OK Please note that a minimum of 2’ of cover is required for all pipes located under driveable surfaces and 1’ of cover under landscape areas. 22)OK Please add a note to the plans that if the rim to invert elevation exceeds 5-feet thena type II manhole will be required. UTILITY PLAN 23)OK All utilities should be shown from the city main line to the structure. Currently the water service and sewer service laterals to the main are not shown. 24)Please add a note that tracer wire is required on the newwater service lines. As indicated by the Fire Department, a fire sprinkler system is required for this property. Please revise plans to include the following: a.Please add a note that a 1” meter is to be installed b.Show the water meter located in the right-of-way, such that the back of the meter is on the property line. The water meter shall not be located within the driveway. c.Please show a 1-1/2” water service line to be installed from the back of the meter to the house (as required for a combination fire and domestic service). d.Please label the pipe material and note tracer wire to be installed on the water service line. 25)OK Show that there is a minimum of 3’ of horizontal separation between the waterserviceand dry utilities (i.e. power, phone, gas, cable, etc.). Currently theproposedgas is too close to the proposed water service line. 26)OK Add a note to the plans indicating where the landscape irrigation backflow assembly will be located if one is proposed. 27)OK Show a 6” sewer cleanout at the property line. Please add a note that the 6” cleanout at the property line shallhave a 12” cast iron lamphole cover with½” hexbolts.This is required for both the proposed residence and the existing residence with the relocated side sewer. 28)OK Page 3of 4 Providesewerinvert elevations at the main, the cleanout at the property line and at the house so that a minimum 2% slopeand minimum 2’ pipe coveragecan be verified. If the slope of the pipe exceeds 20% the pipe will need to be anchored. 29)OK The existing sewer lateral is shown to be reused and as such, the City’s Public Works Department will need to TV the lateral to determine if it is acceptable to re-use. Revise the note on the plans to include the following: Contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule TV inspection. 30)OK Please add a note to the plans that all final restoration within the right-of-way shall be completed by the contractor not the City of Edmonds. SOIL MANAGEMENT PLAN 31)OK Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13. STORMWATER ENGINEER REVIEW Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at Zachary.richardson@edmondswa.govwith any specific questions you may have regarding his comments. Page 4of 4