Loading...
MITIGATION RESPONSE.pdfGTCGibson Traffic Consultants, Inc. 17;�i1�•l��i��LtLi�•L'L�itti4i� �i�'i'i•�i�ti: Ll��•t�t�t�. MEMORANDUM To: Jeff Oaklief, Johnson Architecture & Planning, LLC From: Matthew Palmer, PE %IV Project: Salish Crossing Retail Pavilion, GTC 415-026 City of Edmonds Mitigation Update Date: June 29, 2019 This memorandum summarizes the updated mitigation analysis for the addition of the mezzanine as seating area when before it was mechanical space. The site is still located at 190 Sunset Avenue S in the City of Edmonds and will now consist of a total square footage of 1,940 SF (1,611 SF first floor + 323 SF mezzanine). Mitigation fees have previously been paid for 1,764 SF of Donut Shop with Drive Thru Lane and Indoor Seating. This fee was calculated at $6.02 per SF for a total of $10,620.00. No credit was granted for the 8,200 SF (per City records) of previously permitted Shopping Center that had been demolished. This credit should have been for $7,626.00 but was not granted to the development. The development will not change any of the four access points to the existing parking shared lot. Mitigation Fees If credit for the shopping center is was now granted no new traffic mitigation fees would apply. However, as the building permits have been pulled and the mitigation fees should be vested to that time the calculated rate of $6.02 per SF would still apply. This rate was calculated in the October 28, 2015 Memorandum from Gibson Traffic Consultants. The new square footage from what has not previously been mitigated for is 176 square feet (1,940 SF total SF — 1,764 SF paid fees for). This square footage would have $1,059.52 in additional mitigation fees if the shopping center credit isn't granted. 2813 Rockefeller Avenue • Suite B • Everett, WA 98201 Tel: 425-339-8266 • Fax: 425-258-2922 • E-mail: info@gibsontraffic.com