Loading...
Moore SP Request for Info-Engr and Storm-E1-PLN20170063.pdfREQUEST FOR ADDITIONAL INFORMATION Date: February 6, 2018 To: Jen Machuga, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20170063, Moore 3-lot short plat 749 —15th Way SW The comments provided below are based upon review of the preliminary civil plans & documents for the subject short plat. Additional information is requested from the applicant at this time in order to continue review of the application and provide preliminary approval of the short plat. Please ask the applicant to provide a written response to each of the comments below and revise and resubmit plans accordingly. 1. A 10-foot easement shall be provided along the property frontage for placement of dry utilities serving the site. All dry utilities shall be brought to the site at a perpendicular crossing to the site vs. running parallel with the right-of-way as currently shown on the plans. 2. The existing cleanout in the cul-de-sac shall be replaced with a sewer manhole. 3. Provide approximate invert elevations for sewer at main line connection within City right-of-way, at property line, and proposed house locations to show feasibility. Call out length and size of all pipe to verify slopes. 4. Please also address Stormwater Review Comments (attached). Thank you. City of Edmonds STO RM WATE R REVIEW COMMENTS City of Edmonds Engineering Division To: Engineering Reviewer Date: January 30, 2018 Project Name: 15t" Way Permit Number: PLN20170063 Address: 749 15t" Way SW Review Type: Preliminary I ��asibility) Submittal Date: 2/22/2017 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation: I recommend that PLN20170063 be withheld until the comments below are adequately addressed. Review Comments: 1. The drainage report does not currently appear to address the impervious surfaces generated as a result of the required frontage improvements; update report as needed to address frontage improvement areas. a. It appears that the frontage and a portion of the site may drain south-west down 15t" Way; update report to reflect or address apparent additional basin. 2. Neither the drainage report nor geotechnical report address the fact that two of the proposed infiltration trenches are proposed within the footprints of existing improvements which are likely to have significantly varied compaction efforts and soils strata. Update reports & plans as needed to either: a. Provide investigation & testing in these areas, OR b. Provide statement from geotech that they reasonably expect similar infiltration capabilities in these areas, with supporting argument/evidence as too why (additional testing will be then be required prior to construction approval), OR c. Relocated facilities to more apparently feasible locations. 3. It appears that all infiltration facilities are sized only for the impervious areas and therefore all pervious areas for the site would shed off toward adjacent properties. Update plans & reports to either: Page 1 of 2 a. Include pervious areas to be collected and routed to infiltration facilities in the trench sizing calculations, OR b. Address and/or show impact of runoff from pervious areas toward adjacent parcels, including impacts from removed or converted vegetation areas. i. And show how the driveway system would be isolated from collecting additional pervious areas. 4. Update geotechnical report to show Ksat calculations and how the infiltration rate was determined. Page 2 of 2