Loading...
moreinfo#2_PLN20160054.pdfIf 11C. 199v February 21, 2017 CITY OF E w ONDS 121 5th Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa, yov DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION Aidan Bird Studio Meng Strazzara 2001 Western Avenue, Ste 200 Seattle, WA 98121 Subject: Request for Additional Information and Clarifications Westgate Village Mixed Use Building Design Review Application PLN20160054 Dear Mr. Bird, The City of Edmonds has reviewed the February 2, 2017 resubmittal on the West Gate Village Mixed Use Building at 10032 Edmonds Way. Additional information and clarifications are needed for continued review of the application. Please respond to the following so review of this application can proceed: New comments are in red. l'1a1111i11 & Division. C;. lmll cllts: 1. SEPA Checklist: Addressed. 2. Plan Consistency: Addressed, 3. Setbacks: Addressed. 4. Massing and Articulation: Addressed. 5. Amenity Space: a. Not addressed. In addition to the spatial requirements of amenity spaces (a minimum 15% of the project area) amenity spaces must also meet certain requirements for how they are structured. ECDC 22.110.070.C.2 and C.3. Specifically, amenity spaces shall provide a minimum of 20 percent planted pervious surface area (such as a rain garden, bioswale, turf, groundcover, soil or mulch). The remaining balance may be any paved surface with a maximum 30 percent impervious paved surface. The area of provided amenity space is identified; however, it cannot be determined what percentage of the amenity area is planted pervious surface and what percentage is impervious. Please clearly identify on the plans how the amenity area complies with the requirements of ECDC 22.110.070.C.2 and 3. February 21, 2017 Comment: There is still not enough information to determine compliance with ECDC 22.110.070.0.2 and C.3. Please identify the square footage of amenity space that is planted pervious surface area and the square footage that is paved with inipervio s materials. b. Pursuant to ECDC 22.110.070.C, sidewalks do not count toward the amenity space requirement. Addressed. 6. Public Space — Sustainability: Addressed. 7. Height Bonus: In order to be eligible for the height bonus allowed by ECDC 22.110.090, a project must score at least eight points on the Height Bonus Score Sheet. The application material indicates the project would score a total of nine points and be eligible for the height bonus. Some elements are verifiable from reviewing the plans such as the amount of amenity space, but other elements cannot be determined. a. Green Building Program will be added as a condition of approval. Once design review has been approved, the architect will have to submit documentation that the building has been designed to meet LEED Silver/Built Green 4-5 Rating as noted on the score sheet. b. Green Factor score will be added as a condition of approval. Once design review has been approved, in accordance with ECDC 22.110.070.13.2 the landscape architect will have to submit the scoresheet with the project plans, certifying that the plan meets or exceeds the minimum green factor score and other requirements for the property. c. See comments in Item 5 above regarding amenity space. d. The claimed Miscellaneous Points cannot be determined from the application materials. Please provide the following information so these criteria can be evaluated: i. response letter noted car share parking will not be utilized. Identify the Car -Share Parking areas on the plans (minimum 2 spaces). ii. Addressed. Identify the parking spaces and charging facilities for electric cars (minimum 4 spaces). ' iii. Addressed. Identify the bicycle storage and indoor changing facilities on the plans. iv. Partially Addressed. Provide a description on how public art will be integrated into the provided amenity spaces. February 21, 2017 Comment: A public arl area was identified in the amenity space area, however no description was provided on how public art will be integrated in the provided amenity spaces. Please provide a 8. Stormwater Facilities: Not addressed. The design guidelines for the Westgate Mixed Use zone contain many references to incorporating low impact development stormwater Page 2 of 5 techniques into the overall design of the project (ECDC 22.110.000, 22.110.030, 22.110.050.C.2, 22.110.070, and 22.110.080). While permeable concrete is shown on some of the parking spaces, the no rain gardens, bioswales or other stormwater technique referenced in ECDC 22.110 have been addressed. Please provide information and identify on the plans how the stormwater requirements of ECDC 22.110 and ECDC 18.30 will be met. February 21, 2017 Comment: The resubmittal response letter notes the storm drainage and calculations will address these issues. However, no preliminary store) drainage report has been submitted. These items are key design elements for development within the Westgate Mixed Use zone which need to be addressed during design review of the proposal. 9. Lot Line Adjustment: Please note that a lot line adjustment will be required condition since the amenity space and open space values are calculated on a project area of 48,980 square feet, which does not match the current parcel layout. February 21, 2017 Comment: As noted in recent conversations, the project area is going to be adJusted to inch.ide inure of flie site wliicli willl irnpact the animint of anienity space and open space required. In addition to the lot line adjustment, covenants must be recorded to ensure that areas left out of the amenity and open space calculations for the current phase are included in future phases of redevelopment. 10. Parking Agreement: Given that all of the required parking stalls will not be located on the subject property after a lot line adjustment, a parking agreement must be recorded to ensure parking requirements are met. Please note this will be included as a required condition. 11. Geotechnical Report: February 21, 2017 Comment — The geotechnical report submittal with the initial application does not address the criteria for geologically hazardous area in ECDC 23.80. Please submit a revised geotechnical report to be consistent with EC 23.80.050 and address the criteria in ECDC 23.80.060 and ECDC 23.80.070. 1 lin _Jn-g Division Comments: 1. Not addressed. The response letter states this requirement is "understood" and "detailed storm drainage plans & calculations will be provided with the building permit drawings"; however, a storm drainage report is required at this time to confirm project feasibility. A preliminary storm drainage report and plan shall be submitted to the City to confirm project feasibility. a. Stormwater management system(s) shall be shown with invert elevations at facilities and connection to City storm system. b. For those areas where permeable pavement, bio -retention, or other LID technique is provided as a means of meeting stormwater management requirements, infiltration rates shall be provided consistent with City of Edmonds requirements. Refer to Handout E72B & E72D for additional information. Page 3 of 5 2. Response letter states "conveyance into planted areas will be achieved where feasible". This does not entirely address this comment. Clearly show on the plans which low impact development features are being provided to meet both WMU zone requirements and stormwater management requirements and which features are being provided to only meet one or the other. Low Impact Development: ECDC 22.110 WMU Design Standards requires sustainable site design, including low -impact storm water treatment systems. As such, the following applies to the project and shall clearly be shown on the plans: a. Pervious surfaces shall be integrated into site design and may include: pervious pavement, pervious pavers and vegetated roofs. Capture and reuse strategies including the use of rainwater harvesting cisterns may be substituted for the effective area of pervious surface required. b. Runoff generated on site shall be routed through a treatment system such as a structured storm water planter, bioswale, rain garden, pervious pavement, or cisterns. (Please note, where pervious pavement is provided as a means of also meeting stormwater management requirements, flows from other adjacent areas shall not be directed to these permeable pavement systems). c. Stormwater runoff from sidewalks should be conveyed to planted parkways or landscaped rain gardens. Overflow from parkways and runoff from the roadways should be directed into bioswales and/or pervious paving in curbside parking areas, along the street edges where it can infiltrate into the ground. Perforated curbs through which street water runoff can flow to open vegetated swales may also be provided, where feasible. (Please note, where pervious pavement is provided as a means of also meeting stormwater management requirements, flows from other adjacent areas shall not be directed to these permeable pavement systems). 3. As discussed, frontage improvements will not be required along Edmonds Way to the intersection. The current submittal accurately reflects the frontage improvement limits. Thank you. As noted during the pre -application meeting on 9/1/2016, the frontage improvements shall extend along the entire SR-104/Edmonds Way property frontage. Driveway access points shall be consolidated and the eastern approach shall be removed consistent with WMU zone requirements and access management plan (shown below). 0 o 0Across Management Ma [er Plan i Maaal�ldAa4iaocy o 1, Oo • " 0o ,do0 a� 0,000, Oft 0 0 rte+ ; a °, o �a� ., O O 4. Addressed. Along a portion of Edmonds Way, the proposal shows the required 5 -foot wide landscape buffer (between street and sidewalk), as well as an 8 -foot wide sidewalk. Page 4 of 5 In providing these required improvements, it appears as though a portion of the sidewalk will be located on private property. Clearly show or annotate the intent to either dedicate additional right-of-way to the City or provide a public pedestrian easement. a. Please note, within the general area of the intersection of 100th St SW and SR - 104, the planting buffer may be reduced or excluded, provided that the sidewalk is greater than 8 -feet in width. 5. Not addressed. Please clearly show the limits of the maximum 2 -foot wide drive aisle. An internal circulation drive has been provided through the site. As perpendicular parking exists along one side of the drive and is proposed along the other, the travel lanes shall be 24 -feet in width. The goal established within WMU zone is to reduce impervious surface areas and therefore, the 24 -foot width is also a maximum. Sidewalk areas that flow through the site shall be a minimum of 6 -feet in width. Please provide a cross section that confirms these design dimensions. 6. Addressed. Plans indicate Compact parking stalls to the east of Amenity Area 1. Provide stall dimensions to confirm minimum dimensions of 8 -feet x 16.5 feet. 7. Response letter states contact will be made with Olympic View to obtain their requirements and determine the feasibility of the project. Please provide co fio i'nation that they are aware of the proposed project and have found it to be feasible. Water and sewer utilities fall under the purview of the Olympic View Water & Sewer District. Please provide confirmation that OVWSD has been made aware of the proposed project and that the proposal is found to be feasible from their perspective. According to ECDC 20.02.003.1), the above requested information must be submitted within 90 days (or by May 22, 2017) or the application will expire. If you have any questions of me, please contact me at 425-771-0220 or via email at k t -i-1 n liencc'i)ediiiotidswa.g�)v. S'rarely, a �crnen Lien ��,7j Senior Planner Page 5 of 5