Loading...
mostad residence height cert. (final) 18-000AE.pdfWestern Engineers Inc. SURVEYORS • PLANNERS • ENGINEERS 9740 Evergreen Way * Everett, Washington 98204 (425) 356-2700 FAX (425) 356-2708 HEIGHT CERTIFICATION -FINAL Mostad Residence (Ken Packard — GQ Project File Number:18-000AE Mostad Residence Project Address: 7001 Lake Ballanger Way, Edmonds Building Plan Reference: Approved Site Plan "Samual & Crystina Mostad" (10/11/12) Site Benchmark (100.00 Feet datum assumed): The site benchmark, which is not specifically noted on the approved building plans nor on the approved site plan (Exhibit "A" attached) of which were prepared by the property owner was clarified in the email dated 10/15/2018 from Brad Shipley, Associate Planner for the City of Edmonds Planning Department, (Exhibit `B" attached). Based on said email, the benchmark is specifically described as the existing lower basement finished floor of the subject residence. All plan elevations are US Survey Feet and any plan stated fractional elevations have been converted to decimal feet. Maximum Building Height (130.21 Feet): The maximum building height, as defined on the Approved site plan (Exhibit 1) is stated as 130.21' (one -hundred -thirty and 21/100th feet). Highest Point of newly constructed structure's roofline (130.18 Feet ): It should be noted that the building currently has two prominent rooflines with different heights and although the pre -construction existing roofline (most northerly roof peak) is considered non -conforming, we noted that that the measured elevation of this roofline peak was approximately 132.8' whereas the newly constructed roof peak located on the south side of the existing building, subject to City's maximum building height requirements, was measured at 130.18 feet on top of the existing roofing materials. Although the building is still under construction, our field personnel noted that the roof appeared to be substantially completed at the time of measurement. Conclusion: After reviewing the elevation measurements recorded by our field personnel on 10/16/2018, relative to the site benchmark and maximum building height strictly defined herein, it is my opinion that that the newly constructed roofline is 0.03' below the herein stated maximum building height. Although the measured elevations stated herein have a specified precision, based on the surveying measurement methods utilized, of +/- 0.02', we would note that even if the maximum defined error is added to the highest point, the certified roofline was constructed below the maximum building height, as defined herein. Kenneth L. Long Professional Land Surveyor Washington License No. 16916 Encl. /10/a3 /200 LAND USE CONSULTANTS * CIVIL ENGINEERS * LAND SURVEYORS * ENGINEERING CORPORATION altitude 85.83m Scale 1/3 in = lfc \_ake at oC Heal �ate1 \eye\ C, -C� 0 0 A ��O i!I t11 O 4- 10ft 100+100+109+112 = 421 421 /4=105'2.5" AVERAGE GRADE 105.21 EXISTING ACTUAL = 132'5" (3 FLOORS) MAXIMUM =105' 2.5 + 25' = 130'2.5" PROPOSED 0 PEEK ONPROPOSED ENTRY ROOF 1297.5" teC\�1nat� 100 100, exsisting shed 109' 112' Current Water runnoff Note: and on All disturbed soils theol and fencing perthe El-1 fenci fencing Requirements will be compost - -� amended per BMPT5.13 Proposed Bales U �eG� Impervious For building dept house 44'7 x 37.4 = 1666.25 Patio 44' 7" x 10' 11" = 487.0 Proposed deck over front patio 19'5 x 8'2 Deck and stairs 447' x 21. 5" = 954.8 1�- Sidewalk below deck 447' x 3' = 433.8 2 et Garage 20'4" x 22'4" = 453.96 Side Patio 10' x 10' = 100 D Q Existing driveway and sidewalk -- 70 x 25 =1750 Total current coverage(impervious area) = 5845.81 sgft Proposed new coverage(impervious area) 33 x 16.8 = 554.4 sgft � " , ,C� f�v tot current + new impervious surface=6400.21 " pe`.5 * ; :. Total property .46 acres = 20037.E errs"i2 `ems ''' �y j l� percentage of usage total 6400.21/20037.6 = 31.9 % ,than`0itp \ \C,', !� tp,l5 ttslde setback �',` � .�i 11 I` (� eFor planning 97m a Usage IX g 9 eg1, � �"�.• a1t�tUd o. - house 44' 7 x 37.4 = 1666.25 N 20 Deck and stairs 447' x 21' 5" = 954.8 DM .- of Garage 20'4" x 22'4" = 453.9E =,N, a�tp'.'t�PeN` Side Patio 10' x 10' = 100 d; : ��r��Js ,,.'• Total current coverage (areas over 30") = 3175.01 sgft Proposed deck over back patio 19'5 x 8'2 = 158.E Proposed covered patio infront of entry 10' x 16 = 160 N l: 'v ltnpe ' a Proposed + current total coverage 33 x 16.8 = 3729.41sgft i ro,1 1 Total property above highwater mark 15360.19 according to GIS1„1 3 01 Percentage of usage 3729.41/15360 = 24 % 1�, N AeWaw Samuel & Crystina Mostad 7001 Lake Ballinger �Qkn7 Edmonds, WA �. m < s 2 z OF Op o M �Tmn� ''wA Oo co o o W 244th st S.W. T� ,1'�`,-�-_'�" ptoPoPaOo 3'' x 16 eted 160sq Neal Way tool co PN�a"edy�d�,do '°�;`-, altitude g3'22cn P `6e pe`�\o JS o_ i•. V \tn :, • �, �--� ay nd si 1 i, � � ,-- �eXist�ng dCi�e� • � aot. nL Sg -- - _ a lJ hone and Te1eP Q coon sije �� �•eC Ent<anceeealCm9erWaY a.�eC me {tom {,ak altitude 94.49m EXS1S�•\fig w current setback from rty line f /S7�hao� over 40'pefrom street o�y Pr - �d'�e4rri 'vol P O1 FOR EFo,IGNI C-p'w'Ro+. PJiD DRAINAGE APPROVE�� BY ENGINEERING 0at8:10!/7 AZP f7 EXHIBIT "A" 9740 Evergreen Way Everett, WA 98204 425-356-2700 x113 www.wesi.co From: Shipley, Brad[ma iIto: Brad. Shipley@edmondswa.gov] Sent: Monday, October 15, 2018 10:03 AM To: 'mikel@wesi.co' Subject: 7001 Lake Ballinger Datum Hello Mike, Please use the basement floor as the benchmark for calculating height of the newly built entry overhang. Please let me know if you have questions or concerns. Brad Shipley I Associate Planner City of Edmonds 121 5th Ave N Edmonds WA 98020 (425) 771-0220 ext. 1367 Mike Long From: Sent: To: Subject: Hello Mike, Yes, I agree with this statement. Shipley, Brad <Brad.Shipley@edmondswa.gov> Monday, October 15, 2018 1:52 PM 'Mike Long' RE: 7001 Lake Ballinger Datum Brad Shipley I Associate Planner City of Edmonds 121 5th Ave N Edmonds WA 98020 (425) 771-0220 ext. 1367 From: Mike Long <mikel@wesi.co> Sent: Monday, October 15, 2018 1:16 PM To: Shipley, Brad <Brad.Shipley@edmondswa.gov> Subject: RE: 7001 Lake Ballinger Datum Brad, As there are several elevation ambiguities on both the building and site plan, can you confirm that the following statement is true and correct: The City of Edmonds is requesting that Western Engineers and Surveyor's Inc. utilize the existing basement finished floor of the residence located at 7001 NE Ballinger Way, Edmonds, WA. as the actual project benchmark when performing the survey work for the Mostad Building permit final height certification. Said benchmark has an assumed datum elevation of 100.00 feet that is relative to the building height calculations depicted on the approved site plan for said permit. Additionally, said site plan states that the maximum building height of the new addition roof peak is 130'-2.5" (130.21') relative to said benchmark. Your response is appreciated O Best Regards, Mla Michael L. Long Survey Manager 7IWESTERN ENGINEERS & SURVEYORS SURVEYORS • ENGINEERS • LAND USE CONSULTANTS EXHIBIT "B"