NFPA 13R REQUIREMENTS:
1. APPROVED PLANS AND PERMIT MUST BE ONSITE.
2. CONTRACTOR’S MATERIAL AND TEST CERTIFICATE REQUIRED. (10.1.2)
3. FLUSH OF UNDERGROUD REQUIRED PRIOR TO CONNECTION TO RISER.
4. HYDRO TEST REQUIRED.
5. ENSURE HEAD SPACING IS CORRECT.
6. ENSURE COVERAGE IS PROVIDED TO ALL FUEL FIRED APPLIANCES.
7. PROVIDE FDC WITH 4’ STORZ ADAPTER AND 30 DEGREE DOWNTURN.