Nickolson Building HVAC (BLD20100441).pdf
MessagePage 1of 3
Machuga, Jen
From:
Machuga, Jen
Sent:
Thursday, July 01, 2010 2:35 PM
To:
'Dennis Titus'
Subject:
RE: Nickolson Building HVAC (BLD20100441)
Hi Dennis,
We do have a requirement for rooftop equipment to be screened from view from street level; however, the
code also requires that rooftop equipment comply with height requirements. The site at 250 - 4th Ave. S
is located within our RM-1.5 zone, which has a maximum height of 25 feet, and the roof only may extend
5 feet above the stated height limit if all portions of the roof above the stated height limit have a slope of 4
inches in 12 inches or greater. You can refer to the RM-1.5 zoning standards via the following link for the
height requirements: http://www.mrsc.org/mc/edmonds/Edmonds16/Edmonds1630.html#16.30
Also, the definition of height is available via the following link (ECDC 21.40.030):
http://www.mrsc.org/mc/edmonds/edmonds21/edmonds2140.html#21.40.030
Please note that the elevations of the four corners of the height rectangle used for the height calculations
are based on original grade. Thus, even if the grade of these points was increased when the building was
constructed, you still need to use the original grades of the points for determining the maximum height.
I hope this helps answer your questions. If you have any additional questions, feel free to contact me.
Please note that I will be out of the office tomorrow and we are closed for the holiday on Monday.
Have a good afternoon,
Jen
Jennifer Machuga, Planner
City of Edmonds, Planning Division
121 - 5th Avenue North
Edmonds, WA 98020
(425) 771-0220 ext. 1224
Machuga@ci.edmonds.wa.us
-----Original Message-----
From: Dennis Titus \[mailto:DennisT@cgengineering.com\]
Sent: Thursday, July 01, 2010 8:21 AM
To: Machuga, Jen
Cc: Umbaugh, Theresa; Chevy Chase
Subject: RE: Nickolson Building HVAC (BLD20100441)
Jen,
Isitstrictlyaheightissueoristhereanexceptionforwhatcanbeseenfromstreetlevel?The
unitcannotbemovedbecauseoftheexistingductconfiguration.Wedonothavetoomany
otheroptionstoreducetheheight.Theaveragedatumusedwastakenfromtheoriginalplans.If
thesitewasgradedhigherthantheplansshowthencouldwerecalculatetheaveragedatum?I
haveincludedaheightcalculationandasketchshowingtheheightsbasedontheoriginalplans.
Thank you,
Dennis Titus, .
P.E
7/13/2010
MessagePage 2of 3
P: 425.778.8500 | F: 425.778.5536
th
250 4 Ave. South, Suite 200
Edmonds, WA 98020
www.cgengineering.com
From: Machuga, Jen \[mailto:Machuga@ci.edmonds.wa.us\]
Sent: Wednesday, June 30, 2010 3:45 PM
To: Dennis Titus
Cc: Umbaugh, Theresa
Subject: RE: Nickolson Building HVAC (BLD20100441)
Hi Dennis,
We would need height calculations for the new HVAC unit; however, I took a quick look at the plans with
Theresa and noticed that the top of the parapet is only an inch or two below the height limit. If the HVAC
unit extends 12 inches above the parapet, it appears that it would exceed the height limit. I'd suggest
looking into another location on the site where the unit could comply with the height limit, setbacks, and any
other applicable development standards.
Feel free to contact me if you have any questions.
Jen Machuga
Jennifer Machuga, Planner
City of Edmonds, Planning Division
121 - 5th Avenue North
Edmonds, WA 98020
(425) 771-0220 ext. 1224
Machuga@ci.edmonds.wa.us
-----Original Message-----
From: Umbaugh, Theresa
Sent: Tuesday, June 29, 2010 10:17 AM
To: 'Dennis Titus'
Cc: Machuga, Jen
Subject: FW: Nickolson Building HVAC (BLD20100441)
Hello Dennis,
LγǝĻŅƚƩǞğƩķĻķǤƚǒƩƨǒĻƭƷźƚƓƷƚWĻƓağĭŷǒŭğźƓƷŷĻƦƌğƓƓźƓŭķĻƦğƩƷƒĻƓƷ͵
Theresa M. Umbaugh
Senior Permit Coordinator
umbaugh@ci.edmonds.wa.us
-----Original Message-----
From: Dennis Titus \[mailto:DennisT@cgengineering.com\]
Sent: Tuesday, June 29, 2010 9:51 AM
To: Umbaugh, Theresa
Subject: Nickolson Building HVAC (BLD20100441)
7/13/2010
MessagePage 3of 3
Theresa,
ImeanttoaskthismorningifyouneedaheightcalculationforthenewHVACunit.Ihavesection
ontheplansshowingthenewheightbutIdidnotincludeanythinginthecalculations.Thenew
HVACunitisaboutЊЋͼtallerthanourparapetbutstill
behindtheprojectedroofangle.Ifthisis
goingtobeacommentIwouldliketocatchitsoonerthanlater.
Thank you,
Dennis Titus, .
P.E
P: 425.778.8500 | F: 425.778.5536
th
250 4 Ave. South, Suite 200
Edmonds, WA 98020
www.cgengineering.com