Project: Olympic View Water and Sewer District (OVWSD), Sanitary Sewer Upgrades
Applicant: Shoreline Construction Co.
File Number: STF20170025
Associated Permit(s): ENG20170240 — Right -of -Way Construction Permit
Date of Decision: October 11, 2017
Reviewed By: Shane Hope, Development Services Director
Leif Bjorback, Building Official
Jeanie McConnell, Engineering Program Manager
I. INTRODUCTION
The applicant has applied for a noise variance (Attachment 1) for 2 consecutive days to conduct
construction activities at the intersection of Edmonds Way (SR-104) and 100' Ave W. The work
proposed at this location has been approved under a separate right-of-way construction permit,
ENG20170240, but the applicant has requested that work at this specific intersection be approved
during the hours 8:00pm — 5:00am, which is outside the normally approved hours for construction
(Attachment 2)
The following is staff s analysis and decision on the proposal.
II. FINDINGS AND CONCLUSIONS
A. GENERAL INFORMATION
1. Request: The applicant is requesting a noise variance for work proposed as part of the
OVWSD Sanitary Sewer Upgrade project.
2. Review Process: A noise variance is a Type I decision pursuant to ECDC 20.01.003. The
director or his/her designee reviews the project and issues an administrative decision
pursuant to ECDC 20.75.050.C.
3. Project Owners: Olympic View Water and Sewer District
4. Applicant: Shoreline Construction Co.
5. Location: Intersection of Edmonds Way (SR-104) and 100t' Ave W
6. Activities, Equipment and Factors: Refer to Attachments 2 & 3
Noise Variance -Staff Decision- STF20170025(revised)
Page 1 of 3
B. PUBLIC CONVENIENCE — Will the work result in significant delays for transportation,
services, or other customer needs if done only during the day and within the hour restrictions
set out in other parts of ECC Chapter 5.30?
The location of the proposed construction activities is on State Route 104 - a direct route to
the Edmonds Ferry Terminal, a major bus line, and major transportation corridor into and out
of Edmonds. Should the proposed work be performed during daytime hours it would have
significant impacts to the public.
C. PUBLIC SAFETY — Does working at night significantly improve safety conditions for the
traveling public and/or construction workers?
State Route 104 experiences higher traffic volumes during daytime hours. Rerouting of
traffic through the intersection increases congestion and increases safety concerns.
Performing work at night will significantly reduce exposure to motorists, pedestrians, and
construction workers.
D. PUBLIC EXPOSURE —What will be the setting for any proposed work outside of regular
hours? Is it located on an arterial street or in a mostly residential area?
Work is to be performed on two major arterials — 100t' Ave Wand State Route 104. SR-104
is a direct route to the Edmonds Ferry Terminal, major bus lines and downtown Edmonds.
100t1i Ave W is provides a direct connection between Highway 99, 220'1i St SW, and
downtown Edmonds.
E. PUBLIC COSTS —Does a limited amount of authorized work outside of regular hours
established by this chapter save the public significant cost compared to daytime work?
Expected reduced costs include less idle time for mail service, garbage service, bus service,
etc. In addition, work performed outside of regular hours would have less of an impact to
local businesses.
F. NOISE REDUCTION MEASURES — Have all reasonable steps been taken to reduce the
impact of any necessary noise outside the standard hours?
The applicant has considered the following noise reduction measures:
a) Use electrical over gas/diesel power when feasible
b) Diesel powered equipment to be housed in noise attenuating enclosures when
feasible.
III. DECISION
Based on the Findings of Fact and Conclusions, the following decision is issued by the City of
Edmonds Development Services Department. The noise variance, is APPROVED with the
following conditions:
Noise Variance -Staff Decision- STF20170025 (revised)
Page 2 of 3
1. The noise variance is limited to the hours of 8:00pm — 5:00am.
2. The noise variance is granted to perform work over a consecutive 2-day period on dates to be
agreed upon with the City one -week prior to proposed work start.
3. Construction activity and associated traffic control shall be performed consistent with
separately approved right-of-way construction permit.
4. The grant of a variance shall not relieve any person from the requirements of ECC 5.30.130
relating to public disturbance noises.
IV. APPEALS
Type I permit decisions may be appealed by a party of record to Snohomish County superior
court within 21 days of the date of the decision pursuant to ECDC 20.07.006.
V. PARTIES OF RECORD
City of Edmonds Olympic View Water & Sewer District
121 5t' Avenue North 8128 228th St SW
Edmonds, WA 98020 Edmonds, WA 98026
Shoreline Construction Co.
PO Box 358
Woodinville, WA 98072
VI. ATTACHMENTS
1. Application
2. Variance Request
3. Factors to Consider
File - STF20170025
Al Compaan, Police Chief
Jim Lawless, Assistant Police Chief
Noise Variance -Staff Decision- STF20170025 (revised)
Page 3 of 3
0 E D jfi
DEVELOPMENT SERVICES
WORK HOURS VARIANCE REQUEST FORM
1215th Avenue N, Edmonds, WA 98020
Phone 425.771.0220 Q Fax 425.771.0221
RFC,ielv�
�F�EJ�A 08 20�I
C0 w1vT .cc,,..
on, .
PROJECT NAME:
PERMITS) #:
Sewer System Upgrades- Phase 2
Right of Way Permit #ENG20170240
PROJECT ADDRESS:
Edmonds Way & 100th Street
APPLICANT:
Phone:
Shoreline Construction Co.
(425) 483-0600
Address (Street, City, State, Zip):
E-Mail:
PO Box 358 Woodinville WA 98072
Dsuzuki@sccwa.net
PROPERTY OWNER:
Phone:
City of Edmonds
Address (Street, City, State, Zip):
E-Mail:
121 Fifth Avenue North Edmonds WA 98020
CONTACT PERSON: (This person must be available at all times that
Phone:
extended work is being performed)
Jason Balliet and/or Alec Andry
Jason Balliet (206) 755-8570 Alec Andry (206) 571-3572
Address (Street, City, State, Zip):
E-Mail:
8315 216th ST SE Woodinville WA 98072
Alec_andry@hotmaii.com
CONTRACTOR:
Phone:
Shoreline Construction Co.
(425) 483-0600
Address (Street, City, State, Zip):
E-Mail:
8315 216th ST SE Woodinville WA 98072
Dsuzuki@sccwa.net
DATES AND TIME OF EXTENDED WORKTIME REQUESTED:
WA State Contractor License #/Exp. Date:
8:00pm to 5:00am
SHOREC'374NO 10/01/2018
City of Edmonds Business License #/Exp. Date:
Dates are contingent until hours approved
NR-024193 Dec 31, 2017
DETAIL THE SCOPE OF WORK TO BE PERFORMED DURING THE REQUESTED TIMES:
Installing CIPP (Cured in place pipe) at the location of Edmonds Way & 100th Ave West Edmonds
❑ A RATIONALE FOR THE PROPOSAL SHALL BE SUBMITTED IN ADDITION TO THIS FORM. PLEASE REFER TO THE WORK
HOURS VARIANCE REQUEST HANDOUT WHICH ASKS FOR AN EXPLANATION OF HOW THE ACTIVITIES WILL COMPLY WITH THE
REQUIREMENTS OF THE VARIANCE ORDINANCE.
Print Name: Douglas J. Suzuki
Signature: Date: 09/27/2017
�
FM"C:1Us thornquist\AppDa�u+\LocalVvlicrosoft\WindowslTcmport+ry Internet FileslConlent,0utlook\VG3YIKMA\Form B 2017 (3). ocx
Updated: 09/25/2017
Attachment
�(D re I a4e
Construction Co.
GENERAL CONTRACTORS
Sept. 21.2017
City of Edmonds
121 511' Avenue N.
Edmonds, WA 99020
Re: Night Work
Dear Mr. Rivera,
sr� FiV�
DF�F�O�M �8 ZQj�
Cp �NT��FAV�c�S
Shoreline requests a noise variance for 2 consecutive days to conduct construction activities for an Olympic
View Water and Sewer District (OVWSD) project called Sanitary Sewer Upgrades — Phase 2. The basic
scope of this project is to rehabilitate sewer pipe at various locations. Several of the locations are within the
jurisdiction of City of Edmonds and a Right of Way permit has been issued by City of Edmonds (permit
##ENG20170240). The work for this project can be completed within the conditions of the permit excluding,
the site at Edmonds Way & 100" Ave W.
The work at Edmonds Way & 100'h Ave W is rehabilitating the existing 12" diameter sewer line utilizing
Cured -In -Place Pipe (CIPP), the sewer pipe is within the ROW of Edmonds Way. The pipe wi 11 be
accessed utilizing 2 manholes, one is located in the intersection of 100111 Ave W and the other is
approximately 400 feet west of 100"' Ave W. The process of CIPP requires that the liner be installed, cured
and side sewers reinstatement to be performed in a continuous manner (day 2). The two day plan
(bypassing is required) is as follows:
Day 1 —
Prep existing sewer pipe
o
Clean pipe
o
CCTV pipe
o
Prepare CIPP
Day 2 —
CIPP pipe
o
Invert liner (install liner)
o
Inflate and cure liner
o
Reinstate laterals
o
Post TV
The activities and equipment required to complete this work are:
• Tratije Control
o Arrow Board/Portable Message Sign
o Light duty trucks
• Sewer bypassing
o 60 KW generator
• CCTV of pipe to be CIPP
o TV van
• Cleaning of pipe to be CIPP
o Vacuunt/Combination truck
• Installation of CIPP
o Steam generator - box van
o Air Compressor 375 cfnt
o Support trucks — light duty buck
P.O. Box 358 e Woodinville, WA 98072 Attachment 2
_ E ut nteitt
Noise Level db
Arrow board/PMS (electric)
Below 50 db
Light duty truck
50-60 db
60 KW Generator
60 db
TV Van
60 db
Vacuum/Combination
85 db
Steam Generator —Box Van
50-60 db
Air Compressor 375
85 db
�Fc
66P
o�F �� Fo
C�UNTFRF�'/C
FS
Edmonds Way is a high volume road surrounded by business. Allowing the work to be performed between
the hours of 8:00 pm to 7:00 am on 2 consecutive nights will:
• Decreased vehicular and pedestrian traffic disruption or delays
• Less disruption to nearby business
• Increased public safety
• Enable work to be completed
This work is planned to take place either the first or second week ut October.
OLYMPIC VIEW WATER & SEWER DISTRICT
SEWER SYSTEM UPGRADES PHASE 2
SHORELINE CONSTRUCTION CO
SHEET 8 TRAFFIC CONTROL FLAN
TRAFFIC CONTROL PLAN SHEET 2 OF 3
T
POLICE OFFICER
POLICE CRUISER
100TH AVE W
fiECE1VED
6tp 28 2W
�E�1ElO ,,ENT SE"OES
COUNTER
BUFFER DATA
LOKORUORML BUFFER ILPACE B
win nr>e >s a sa ea �> ro
iwA+N Iwa re
TRANSPORTABLE AT ENUATOR ROLL ANEAD DISTANCE e R
r•M1> C d • k� ••
IEEE—'
�Y1 YHr Y N
.M •>f 1>y Ph r�PH
PROTBCTM VKWLB (WORK WwLq - R
No wwPo au>•w PPouuNo
ETTAKR
TM• 41
jACING
,0 TD .tl
00,o
ro »
Ao
FLOW
d 1
DRIVEABLE
of r
1
SHEET
TRAFFIC
i
111
�
i
l.''ii is
1 • . 4-
Aw
41*4�
1 11
�. t EDMONDS WAY
1. 1
t 11
1.
t
t
`}•rD
Work Variance
5.30.120
• C
-
<ppMF 1�
CpU!V�6�F91//Ct
o 1 — Public Convenience
• Work during daytime hours set forth in 5.30.110 would have a negative
impact to:
• Traffic
• Local business and public service
• Work during night time will
• Reduce disruption to traffic
• Reduce disruption to local business and public service
o 2 — Public Safety
• Work during outside normal will increase safety
• Reduced exposure to traffic congestion
• Reduced exposure to pedestrian traffic
• Public overall exposure will be significantly reduced, resulting in a
safer work environment.
o 3 — Public Exposure
• Work setting is the roadway of Edmonds Way and 100th Ave West these are
arterials
o 4 — Public Costs
• There is no known added public costs
■ There is an expected reduced cost to the public if performed during night time
hours
• Less idle time in traffic
o Mail service, garbage, police etc....
• Less of an impact to local business
o 5 — Noise reduction measure
• Noise reduction measures have been considered
• Use electrical over gas/diesel power when feasible
• Diesel powered equipment to be housed in noise attenuating
enclosures when feasible