Noise Variance-Staff Decision-STF20170025(revised)-packet.pdffhC. 18y" CITY OF EDMONDS 121 5ch Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa DEVELOPMENT SERVICES DEPARTMENT DEVELOPMENT SERVICES DEPARTMENT NOISE VARIANCE STAFF DECISION Project: Olympic View Water and Sewer District (OVWSD), Sanitary Sewer Upgrades Applicant: Shoreline Construction Co. File Number: STF20170025 Associated Permit(s): ENG20170240 — Right -of -Way Construction Permit Date of Decision: October 11, 2017 Reviewed By: Shane Hope, Development Services Director Leif Bjorback, Building Official Jeanie McConnell, Engineering Program Manager I. INTRODUCTION The applicant has applied for a noise variance (Attachment 1) for 2 consecutive days to conduct construction activities at the intersection of Edmonds Way (SR-104) and 100' Ave W. The work proposed at this location has been approved under a separate right-of-way construction permit, ENG20170240, but the applicant has requested that work at this specific intersection be approved during the hours 8:00pm — 5:00am, which is outside the normally approved hours for construction (Attachment 2) The following is staff s analysis and decision on the proposal. II. FINDINGS AND CONCLUSIONS A. GENERAL INFORMATION 1. Request: The applicant is requesting a noise variance for work proposed as part of the OVWSD Sanitary Sewer Upgrade project. 2. Review Process: A noise variance is a Type I decision pursuant to ECDC 20.01.003. The director or his/her designee reviews the project and issues an administrative decision pursuant to ECDC 20.75.050.C. 3. Project Owners: Olympic View Water and Sewer District 4. Applicant: Shoreline Construction Co. 5. Location: Intersection of Edmonds Way (SR-104) and 100t' Ave W 6. Activities, Equipment and Factors: Refer to Attachments 2 & 3 Noise Variance -Staff Decision- STF20170025(revised) Page 1 of 3 B. PUBLIC CONVENIENCE — Will the work result in significant delays for transportation, services, or other customer needs if done only during the day and within the hour restrictions set out in other parts of ECC Chapter 5.30? The location of the proposed construction activities is on State Route 104 - a direct route to the Edmonds Ferry Terminal, a major bus line, and major transportation corridor into and out of Edmonds. Should the proposed work be performed during daytime hours it would have significant impacts to the public. C. PUBLIC SAFETY — Does working at night significantly improve safety conditions for the traveling public and/or construction workers? State Route 104 experiences higher traffic volumes during daytime hours. Rerouting of traffic through the intersection increases congestion and increases safety concerns. Performing work at night will significantly reduce exposure to motorists, pedestrians, and construction workers. D. PUBLIC EXPOSURE —What will be the setting for any proposed work outside of regular hours? Is it located on an arterial street or in a mostly residential area? Work is to be performed on two major arterials — 100t' Ave Wand State Route 104. SR-104 is a direct route to the Edmonds Ferry Terminal, major bus lines and downtown Edmonds. 100t1i Ave W is provides a direct connection between Highway 99, 220'1i St SW, and downtown Edmonds. E. PUBLIC COSTS —Does a limited amount of authorized work outside of regular hours established by this chapter save the public significant cost compared to daytime work? Expected reduced costs include less idle time for mail service, garbage service, bus service, etc. In addition, work performed outside of regular hours would have less of an impact to local businesses. F. NOISE REDUCTION MEASURES — Have all reasonable steps been taken to reduce the impact of any necessary noise outside the standard hours? The applicant has considered the following noise reduction measures: a) Use electrical over gas/diesel power when feasible b) Diesel powered equipment to be housed in noise attenuating enclosures when feasible. III. DECISION Based on the Findings of Fact and Conclusions, the following decision is issued by the City of Edmonds Development Services Department. The noise variance, is APPROVED with the following conditions: Noise Variance -Staff Decision- STF20170025 (revised) Page 2 of 3 1. The noise variance is limited to the hours of 8:00pm — 5:00am. 2. The noise variance is granted to perform work over a consecutive 2-day period on dates to be agreed upon with the City one -week prior to proposed work start. 3. Construction activity and associated traffic control shall be performed consistent with separately approved right-of-way construction permit. 4. The grant of a variance shall not relieve any person from the requirements of ECC 5.30.130 relating to public disturbance noises. IV. APPEALS Type I permit decisions may be appealed by a party of record to Snohomish County superior court within 21 days of the date of the decision pursuant to ECDC 20.07.006. V. PARTIES OF RECORD City of Edmonds Olympic View Water & Sewer District 121 5t' Avenue North 8128 228th St SW Edmonds, WA 98020 Edmonds, WA 98026 Shoreline Construction Co. PO Box 358 Woodinville, WA 98072 VI. ATTACHMENTS 1. Application 2. Variance Request 3. Factors to Consider File - STF20170025 Al Compaan, Police Chief Jim Lawless, Assistant Police Chief Noise Variance -Staff Decision- STF20170025 (revised) Page 3 of 3 0 E D jfi DEVELOPMENT SERVICES WORK HOURS VARIANCE REQUEST FORM 1215th Avenue N, Edmonds, WA 98020 Phone 425.771.0220 Q Fax 425.771.0221 RFC,ielv� �F�EJ�A 08 20�I C0 w1vT .cc,,.. on, . PROJECT NAME: PERMITS) #: Sewer System Upgrades- Phase 2 Right of Way Permit #ENG20170240 PROJECT ADDRESS: Edmonds Way & 100th Street APPLICANT: Phone: Shoreline Construction Co. (425) 483-0600 Address (Street, City, State, Zip): E-Mail: PO Box 358 Woodinville WA 98072 Dsuzuki@sccwa.net PROPERTY OWNER: Phone: City of Edmonds Address (Street, City, State, Zip): E-Mail: 121 Fifth Avenue North Edmonds WA 98020 CONTACT PERSON: (This person must be available at all times that Phone: extended work is being performed) Jason Balliet and/or Alec Andry Jason Balliet (206) 755-8570 Alec Andry (206) 571-3572 Address (Street, City, State, Zip): E-Mail: 8315 216th ST SE Woodinville WA 98072 Alec_andry@hotmaii.com CONTRACTOR: Phone: Shoreline Construction Co. (425) 483-0600 Address (Street, City, State, Zip): E-Mail: 8315 216th ST SE Woodinville WA 98072 Dsuzuki@sccwa.net DATES AND TIME OF EXTENDED WORKTIME REQUESTED: WA State Contractor License #/Exp. Date: 8:00pm to 5:00am SHOREC'374NO 10/01/2018 City of Edmonds Business License #/Exp. Date: Dates are contingent until hours approved NR-024193 Dec 31, 2017 DETAIL THE SCOPE OF WORK TO BE PERFORMED DURING THE REQUESTED TIMES: Installing CIPP (Cured in place pipe) at the location of Edmonds Way & 100th Ave West Edmonds ❑ A RATIONALE FOR THE PROPOSAL SHALL BE SUBMITTED IN ADDITION TO THIS FORM. PLEASE REFER TO THE WORK HOURS VARIANCE REQUEST HANDOUT WHICH ASKS FOR AN EXPLANATION OF HOW THE ACTIVITIES WILL COMPLY WITH THE REQUIREMENTS OF THE VARIANCE ORDINANCE. Print Name: Douglas J. Suzuki Signature: Date: 09/27/2017 � FM"C:1Us thornquist\AppDa�u+\LocalVvlicrosoft\WindowslTcmport+ry Internet FileslConlent,0utlook\VG3YIKMA\Form B 2017 (3). ocx Updated: 09/25/2017 Attachment �(D re I a4e Construction Co. GENERAL CONTRACTORS Sept. 21.2017 City of Edmonds 121 511' Avenue N. Edmonds, WA 99020 Re: Night Work Dear Mr. Rivera, sr� FiV� DF�F�O�M �8 ZQj� Cp �NT��FAV�c�S Shoreline requests a noise variance for 2 consecutive days to conduct construction activities for an Olympic View Water and Sewer District (OVWSD) project called Sanitary Sewer Upgrades — Phase 2. The basic scope of this project is to rehabilitate sewer pipe at various locations. Several of the locations are within the jurisdiction of City of Edmonds and a Right of Way permit has been issued by City of Edmonds (permit ##ENG20170240). The work for this project can be completed within the conditions of the permit excluding, the site at Edmonds Way & 100" Ave W. The work at Edmonds Way & 100'h Ave W is rehabilitating the existing 12" diameter sewer line utilizing Cured -In -Place Pipe (CIPP), the sewer pipe is within the ROW of Edmonds Way. The pipe wi 11 be accessed utilizing 2 manholes, one is located in the intersection of 100111 Ave W and the other is approximately 400 feet west of 100"' Ave W. The process of CIPP requires that the liner be installed, cured and side sewers reinstatement to be performed in a continuous manner (day 2). The two day plan (bypassing is required) is as follows: Day 1 — Prep existing sewer pipe o Clean pipe o CCTV pipe o Prepare CIPP Day 2 — CIPP pipe o Invert liner (install liner) o Inflate and cure liner o Reinstate laterals o Post TV The activities and equipment required to complete this work are: • Tratije Control o Arrow Board/Portable Message Sign o Light duty trucks • Sewer bypassing o 60 KW generator • CCTV of pipe to be CIPP o TV van • Cleaning of pipe to be CIPP o Vacuunt/Combination truck • Installation of CIPP o Steam generator - box van o Air Compressor 375 cfnt o Support trucks — light duty buck P.O. Box 358 e Woodinville, WA 98072 Attachment 2 _ E ut nteitt Noise Level db Arrow board/PMS (electric) Below 50 db Light duty truck 50-60 db 60 KW Generator 60 db TV Van 60 db Vacuum/Combination 85 db Steam Generator —Box Van 50-60 db Air Compressor 375 85 db �Fc 66P o�F �� Fo C�UNTFRF�'/C FS Edmonds Way is a high volume road surrounded by business. Allowing the work to be performed between the hours of 8:00 pm to 7:00 am on 2 consecutive nights will: • Decreased vehicular and pedestrian traffic disruption or delays • Less disruption to nearby business • Increased public safety • Enable work to be completed This work is planned to take place either the first or second week ut October. OLYMPIC VIEW WATER & SEWER DISTRICT SEWER SYSTEM UPGRADES PHASE 2 SHORELINE CONSTRUCTION CO SHEET 8 TRAFFIC CONTROL FLAN TRAFFIC CONTROL PLAN SHEET 2 OF 3 T POLICE OFFICER POLICE CRUISER 100TH AVE W fiECE1VED 6tp 28 2W �E�1ElO ,,ENT SE"OES COUNTER BUFFER DATA LOKORUORML BUFFER ILPACE B win nr>e >s a sa ea �> ro iwA+N Iwa re TRANSPORTABLE AT ENUATOR ROLL ANEAD DISTANCE e R r•M1> C d • k� •• IEEE—' �Y1 YHr Y N .M •>f 1>y Ph r�PH PROTBCTM VKWLB (WORK WwLq - R No wwPo au>•w PPouuNo ETTAKR TM• 41 jACING ,0 TD .tl 00,o ro » Ao FLOW d 1 DRIVEABLE of r 1 SHEET TRAFFIC i 111 � i l.''ii is 1 • . 4- Aw 41*4� 1 11 �. t EDMONDS WAY 1. 1 t 11 1. t t `}•rD Work Variance 5.30.120 • C - <ppMF 1� CpU!V�6�F91//Ct o 1 — Public Convenience • Work during daytime hours set forth in 5.30.110 would have a negative impact to: • Traffic • Local business and public service • Work during night time will • Reduce disruption to traffic • Reduce disruption to local business and public service o 2 — Public Safety • Work during outside normal will increase safety • Reduced exposure to traffic congestion • Reduced exposure to pedestrian traffic • Public overall exposure will be significantly reduced, resulting in a safer work environment. o 3 — Public Exposure • Work setting is the roadway of Edmonds Way and 100th Ave West these are arterials o 4 — Public Costs • There is no known added public costs ■ There is an expected reduced cost to the public if performed during night time hours • Less idle time in traffic o Mail service, garbage, police etc.... • Less of an impact to local business o 5 — Noise reduction measure • Noise reduction measures have been considered • Use electrical over gas/diesel power when feasible • Diesel powered equipment to be housed in noise attenuating enclosures when feasible Attachment 3