Loading...
Northpoint - RFI 056 L2 Stair Opening HSS Connection Details_sa.pdfSALUS HEALTHCARE ARCHITECTURE November 27, 2018 Leif Bjorback, Kristin Johns City of Edmonds, Development Services Department 121 5th Ave N Edmonds, WA 98020 Subject: Northpoint Recovery, Remodel of Edmonds Facility Request for revisions to L2 Stair Opening HSS Connection Details Permit #BLD2018-0447 RE: RFI-056: new structural details To Leif Bjorback and Kristin Johns, Venture Construction will be meeting with either Milton Thompson or Eric Carter to review this revision. Attached is RFI-56 which adds new details #17 (SKS-08) and #12 (SKS-11). These details occur on the west side of stair at the second level: - Detail #17 shows the connection of beam HSS 8x4x1/4 to the existing glu-lam (on Gridline-E) - Detail #12 shows the connection of beam HSS 8x4x1/4 to the new concrete wall (adjacent to Gridline-D.1) - Partial S-102 second floor structural plan showing detail locations. Both details have been stamped and signed by Greg Lee, structural engineer of record for ABKJ Engineers. We are requesting these added details be approved. Thank you for your consideration. Douglas McNutt Principal — Salus Architecture Encl: Structural Details #08 & #12. Partial S-102. C: R. David Frum, FAIA, ACHA Z:\16029 Northpoint Recovery\Docs\06.01-MunicipalReview\AFTER PERMIT ISSUED Request for Clarification to City_10-24-18\RFI-056 L2 Stair Opening HSS Connection Details\Northpoint - L2 Stair Opening HSS Connection Details.docx 1402 Third Ave, Suite 200 / Seattle, WA 98101 /T206.652.0722/F206.340.2266/www.salus.archi /ENTURE RFI #56 GENERAL CONTRACTING LLC Venture General Contracting Project: 1343 - Northpoint Recovery 1518 1 st Ave S #400 7416 212th Street SW Seattle, Washington 98134 Edmonds, Washington 98026 Phone: 206 582 4500 L2 Stair Opening HSS Connection Details TO: Douglas McNutt (Salus Architecture) FROM: Chad Winters (Venture General Contracting) 1518 1 st Avenue S., Suite 400 Seattle, Washington 98134 DATE INITIATED: 11/07/2018 STATUS: Open LOCATION: DUE DATE: 11/14/2018 COST CODE: REFERENCE: S-201 & 9/S-592 COST IMPACT: TBD SCHEDULE IMPACT. TBD DRAWING NUMBER: SPEC SECTION: LINKED DRAWINGS: PRIORITY: High RECEIVED FROM: Richard Wesley (Wintersky Inc) COPIES TO: Greg Lee (ABKJ), Greg Shelton (Venture General Contracting), Marty Thorton (Venture General Contracting), Adam Vance (Venture General Contracting) For the HSS 8x4x1/4 shown on S-102 on the W side of the L2 stair opening, please provide details specifying the connections at SW-3 on the N side and the GL Beam on the S side. Attachments: RFI 56 HSS Connections.pdf Awaiting an Official Response All Replies: Please see the attached sketches SKS-08 & SKS-11 for the connection details to the concrete wall and GL beam. Greg Lee / ABKJ BY DATE 11 /14/2018 COPIES TO Venture General Contracting Page 1 of 1 Printed On: 11/07/2018 02:24 PM PL3/8x7x0-8 W/ 4 - SDS2531 0 @ 1 1 /2" OC HSS BEAM 1/2" PLWD OR AS RE( WALL SHTi WHERE OC r 1 r- \ / A T /\ r% P % r1 r% r- A r\ r- r% 1 1 r1 r1 ABKJ1 Andersen Bjornstad Kane Jacobs Consulting Civil and Structural Engineers 1402 Third Avenue, Suite 200 Seattle, Washington 98101 206.340.2255 phone 206.340.2266 fax www.abkj.com .qTI III NA/Al I PFR X PER DR SCL 'ER PLANS HSS BEAM TO GL BEAM CONN NORTHPOINT DETAIL 17/S-721 Project number 18003.00 RECOVERY TI Date 11/14/18 SKS-08 Drawn by Checked by GJL Scale NONE TABLE C2 ANCHOR PLATE SCHEDULE BM SIZE No OF CONN TYPE & WELD ANCHOR FLSIZE No OF HORIZ ROWS HSB REQD SIZE (INCHES) SIZE (INCHES) OF DIEA (INCHES) (2 PER ROW) HSS8x & SMALLER 2 - 3/4" DIA-A325N SEAT L3x3x5/16 1/4" 1/2 x 10 x 1'-0" 2 HSS1 Ox - HSS12x 4 - 3/4" DIA-A325N SEAT L3x3x3/8 5/16" 1/2 x 10 x 1'-6" 3 (E) CONC WALL DIEA PER SCHED TABLE C2, STAGGER 1 1/2" L5x5x1/2, LENGTH TO MATCH ANCHOR PL SEAT L PER TABLE C2 L3x3x1 /4 x ^ _ X Q 75 Z iY) 3 1/2" \ MIN HSS BM 3/4" GAP- HSB, SIZE PER TABLE C2, SPA TO MATCH DIEA NOTE: CONTR OPTION TO USE ANGLE WITH SHORTER LEG PERP TO (E) CONC WALL, MIN 2 1/2" LONG. HSS BEAM TYP ANCHOR PLATE AT END (E) CONC WALL NO SCALE RFI #056 RESPONSE ABKJ1 Andersen Bjornstad Kane Jacobs Consulting Civil and Structural Engineers 1402 Third Avenue, Suite 200 1 Seattle, Washington 98101 206.340.2255 phone 1206.340.2266 fax www.abkj.com Northpoint Recovery T I New Detail - 12/S-721 Project number 18003.00 S KS-11 Date 11 /21 /18 _ Drawn by Checked by GJL Scale NONE 20' - 0" 4 (E) 5 1/8x33 GL - — — — — — — — — — — — — — — — — — — — — — — O m ii Q- _______ ___________________________________________3 RFI-56, ___________ __________ SKS-11 ___________ ___ == L========================--=----=---==--------------�============ === D �_ (E) 16"DP TP � � F F __Fto 1�@10=_== ________________ =�a "_____________" _________'__----_--- == = 1 ___________ _______________________ ______________ ___ S-592 m O _ 00 ============== --- A _ ----------- ----- X SW-3 r --1�77— ___------------------- _________________ '== `°-------------_----- _ - - _ -tj _ _-__ --- w--------- --__-- =-31 LEDGER Lax 3 1 3 s-zzi ______________ ___ �FE __SM__�_ __�_____ __ __ u -- o (A =_a==_=_=_a=_=_=_____ O X_________________________________ _____________ N N ________ ___ aF / r` U U 2 3/4"------- - 5�2 ------ N-------- --- _ _= sirN U N 8 314" _ ____ ____ ` _=_--__= -_--__ _------------_-- E RFI-56, _- ----------- 5 1/8x16 1/2==== P _________ _ _____ - SKS-08 =__ ___ ____________________ ____________ S-592 =_=_=_______________________________ 5 ________________________ SIM