Northpoint - RFI-64_Elevator Guiderail Support Post & Beam Connection_SA.pdfSALUS
HEALTHCARE ARCHITECTURE
November 27, 2018
Leif Bjorback,
Kristin Johns
City of Edmonds, Development Services Department
121 5th Ave N
Edmonds, WA 98020
Subject: Northpoint Recovery, Remodel of Edmonds Facility
Request for Connection between post and beam at east side of elevator
Permit #BLD2018-0447
RE: RFI-064
To Leif Bjorback and Kristin Johns,
Venture Construction will be meeting with either Milton Thompson or Eric Carter to review
this revision. We are providing a mechanical fastening to connect the vertical HSS 6x4 post
between the first -floor slab to the underside of the HSS Beam (at the second floor) on the
east side of the elevator.
We are requesting this revision be approved.
Thank you for your consideration.
Douglas McNutt
Principal — Salus Architecture
C: R. David Frum, FAIA, ACHA
Z:A16029 Northpoint RecoveryVDocsV06.01-MunicipalReviewVAFTER PERMIT ISSUED Request for Clarification to City_10-24-I8\RFI-064 Elevator Guide Rail Support
Post & HSS Beam Connection\Northpoint - Elevator Guide Rail Support Post & Beam Connection.docx
RFI Questions from the Contractor:
On the east side of the elevator, the elevator guide rail is supported by HSS 6x4 post, which
spans between the first -floor slab and the underside of Beam HSS 8x4x1/4 (at the second
floor) near Grids GL-3.5. Please provide a mechanical fastening to connect the vertical post to
the underside of the HSS Beam.
Response from ABKJ Structural Engineer:
Either provide:
- Mechanical Fastening: Use PL1/4x4x0-10 W/2-#12-24 x 1 1/2" long HMH screws @ 2" OC
ES for connection to HSS8x4x1/4 beam
Or
- Provide 2 x 2" long 3/16" fillet welds (at each end).
1402 Third Ave, Suite 200 / Seattle, WA 98101 /T206.652.0722/F206.340.2266/www.salus.archi
055000-012
(- 2
Second Floor �-
j�2x4
(T r,
T 4 B) 1
s
I
(
j I
HSS 8X4X1/4 beam I
f
- Use PL1/4x4x0-10
W/2412-24 x 1 1 /2" 1
long HMH screws @
2" OC ES for conn to I
' I
HSS beam
I
Or 1
(
1
-Provide 2 x 2" long I
C
3/16" fillet welds (at
ORY f
Gt
WAgp,, ��
( ++ �
I I _
Neach end).
"� _
I i •_
` 1
—
I
vl
O� 87
di
�{ AL
SSIONALE�O
I I \!
51407p d }gyp l�I / 1w�I
I I
X
Arch confirm
HSS 6X4X1/2 shop prime finish
I H
I
1
V)
1 I
East Side of Elevator
Venture General Contracting LLC
I
❑REVIEWED []REVISE AND RESUBMIT
�EVI EWED AS NOTED ❑REJECTED
C
1
Submittal was reviewed for design conformity and
First Floor general conformance to contract documents only. This
review does not relieve subcontractor of responsibility
I
for conformance to the contract documents including
quantity, quality, dimensions and coordination.
DATE: 10.24.18 BY: Ian Heusser
e
85
Q4
Joe : /VpRT'� PDiNT g --o ire-R y
vii
CQA!P..: V611 r4496' RAt—
DWC,
17ATE : to /'22 / ie