Loading...
Northpoint Engineering Judgement Firestop_NS14918024_.pdfENGINEERING JUDGMENT FIRESTOP DETAIL *F Rating - 1 HR Contact: Justin Evatt (with STI) #702-423-9799 for further information. NS14918024 mo 1. Floor/Ceiling Assembly (1 Hr) - Wood floor/gypsum ceiling assembly (UL L570 Design). 2. Penetrant - Max 20' long x 6" wide x 27" tall (or smaller) glulam beam. Penetrant to be rigidly supported. Annular space is min 1/4" to max 3/4". 3. Sealant - SpecSeal® SSS or LCI Sealant applied into annular space to full depth, flush with bottom of gypsum ceiling. *Note: 1 - Rating of the firestop system is dependent on the performance of the surrounding construction under fire exposure with a maximum possible F rating of 1 Hr. THIS DESIGN REPRESENTS A FIRESTOP SYSTEM EXPECTED TO PASS THE STATED RATINGS IF TESTED Project: North Dint Recovery Center Signature: System Reference: p rY W-L-1461, W-L-7244, F-C-7045 Project Address: Edmonds, WA 98020 Designed by: Bernadette Guerrero Douglas McNutt/RMI 4O1e N.T.S. �"05/302018 1 PAGE OF Based Do les(i " ASTM E814NL 1479: Standard for Fire Tests of PeneUation Firestops All statements, technical information, and recommendations contained herein are based Specified Technologies Inc. upon tests we believe to be accurate; however since the conditions of use and application are beyond our control, STI shall not be liable for any damage, direct or consequential, OT114f ans May- 9oemMile, NJ 0076 USA -Toll Free: A00M2.11d0 - T. +1 "52M000 resulting from the use of this material or design. STI's sole warranty shall be to refund or F.44 "231.9415- E: twhiorvCWAred6p.00rh-www.dMtwep.ow replace materials found to be defective.