Loading...
NORTHPOINT-BLD20180447-CIVIL ASBUILTS.pdfSide Sewer Clean Out. Top of 6" PVC Inlet = 403.83 IE Top of 10" PVC Outlet = 403.50 IE 403,00(W) North West - — - — - — - — - — - I / Property Corner 4" GIP bP. 6" PVC sea water s P g oefall of this Area onn Pege 2 406.17 4" GIP 4^we 4" GIP EDMONDS RECOVERY CENTER IN HPOINT RECOVERY Civil AS-BUiltS April 10th, 2019 �--- uuir pow woRx ar 0 ARIA aaew Page 1 North West Property Corner Water Line Easement - CB - 1700101 10' x 10' 11'-2" 10'-0" r- - - - - - - - - - - -I - - - - - - - - - - - - - - - - - - - - - - - - - � I Fire Hydrant i Irrigation w Hydrant Shut Off Valve � i 0 O I Assembl Assembly I � i Irrigation Quick I � � � O Connect I O i Water Shut Off Valve i i Domestic Water i Fire Line Shut Off Valve RPBA in Hot Box •---------- -- ---- PIV Valve (only) no stand pipe. 0 FDC Stand Pipe Irrigation Water Meter Domestic Water Meter DCDA Vault NORTH PROPERTY LINE EDMONDS RECOVERY CENTER NOF77HPOINT RECOVERY Civil As-Builts April 10th, 2019 Page 2