NORTHPOINT-BLD20180447-CIVIL ASBUILTS.pdfSide Sewer Clean Out.
Top of 6" PVC Inlet = 403.83 IE
Top of 10" PVC Outlet = 403.50 IE
403,00(W)
North West - — - — - — - — - — - I /
Property
Corner
4" GIP bP.
6" PVC
sea water s P g oefall
of this Area onn Pege 2
406.17
4" GIP
4^we
4" GIP
EDMONDS RECOVERY CENTER
IN HPOINT RECOVERY
Civil AS-BUiltS
April 10th, 2019
�--- uuir
pow woRx ar
0 ARIA aaew
Page 1
North West
Property Corner Water Line Easement -
CB - 1700101
10' x 10'
11'-2" 10'-0"
r- - - - - - - - - - - -I -
- - - - -
- - -
- - - - - - - - - - - - - - - -
�
I
Fire Hydrant
i
Irrigation w
Hydrant Shut Off Valve
�
i
0
O
I
Assembl
Assembly
I
�
i
Irrigation Quick
I
�
�
� O
Connect
I
O
i
Water Shut Off Valve
i
i
Domestic Water
i
Fire Line Shut Off Valve
RPBA in Hot Box
•----------
-- ----
PIV Valve (only) no stand pipe.
0
FDC Stand Pipe
Irrigation Water Meter
Domestic Water Meter
DCDA
Vault
NORTH PROPERTY LINE
EDMONDS RECOVERY CENTER
NOF77HPOINT RECOVERY
Civil As-Builts
April 10th, 2019
Page 2