Loading...
NortonSpecInspGeo.pdfNOG 2 3 2006 lLoc� ®SPAR MENT CITY OF EDMONDS ECTION AND TESTING AGREEMENT The project at % CAP ��Y issued under building permit nornber requires special inspection andfor testing per IBC Chapter 17. The complete list of special inspections is attached to this document. BEFORE A PERNflT CAN BE ISSUED_ The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors small display identifi6ation when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of TBC Chapter 17 and the following: A. Duties and Responsibilities of the Special inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used.only as an aid to inspection. Special Inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the worn requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non-con€orwing Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. .Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description of daily inspections and tests made with applicable locations • List of all non -conforming itexas + Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. FurnishFinal Construction Report The special inspector or Inspection agency shall submit a final signed report to the City stating that all items requiring special -inspection and testing were fulfilled and reported. And, to the best of L.\TEMP1BUIi.17INGISpeciallnspectionAgreementlBC.dm 7104 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (Lem missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. 13. Contractor Responsibilities 1. Notify the Special Inspector It is the ditty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become Familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved planus at -the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Bulldlmg Department Responsibilities 1.. Approve special inspectors or inspection agencies The building department shall approve all special Inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. E islHer approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. En ' eer or Architect of Record Responsibilities The engineer or architect of record shall include special inspection requirements on, the plans and specifications. ACKNOWLEDGEMEN'T'S read and agree to comply with the terms and conditions of this agreement Owner. Date 6/10 I Special Inspector 2 Datelot 8 1 b 6friV� AIZI, General Co attar ►�'v-� Date Ci Building ficial Date k`a' City g L.,NTEMPIBUILDJN0Spccia peetionAgmcmentiBC-doc 17104 SPECIAL INSPECTION AND TESTING SCHEDULE . PRWBCt'AQD �' rt<�rr.«srQaiu.nasrt�ciptc REWORCM CONCRETE, GUNfM GROUT AND MORTAR: STRUCTURAL STEWWELDING: COMM Genn Crmt Mover Samp]egad -rem ffiscspeciftcm=bcpk1oa•) res,: . _ sfropJtEatctiaf idcntiftratioa Reinfoncia reset Weldmglnspeatioo .0m p OF -td brex Designs — uuasbaic low-ttoa OSbcv OFicid ttaafarpng Pfaccu>Gstt � flig6stttagth lioiting Bitch PUN h apcction 1nsPatka O Sbop O Fwk! OA325 QN Ox. OF On S—pk s O A490 Piet Samples —Meal Dock Welding itup=dm j Tests — Ref dmiag Steel Welding LW=um _ Metmf Surd Wefd"usg lnsp=dca PRECASTIPRESTRIFSSED CONCRETE; ... comete lasest welding iespcaion Y94s �loat_ii=ns Pt..T Pts.tdt... - . � TCStS - _Rein%riting'F�tS Tatiditn7ests l�li>; DCSiFnS Reinfi►rtin 1'iactment - !asst ialacemect Concrete $atelafl Crntattc Placm=x ' Jitstattaeioo Itrscpccion Cast 5aanplcs 1Pkk-vpSamp1rs ' Ca ession Tesu MASONRY SPeciat btspca ;, SRessm Used — Prcfimetnry Aecepuaoe T'tsts(Masoary [)nits. gulf Prison) Sa<Worl at Tcsm fMotnc Giver. Feil W&U Prism) _ Placeuieat laspocsioavf Units ADDITIONAL INSTRUCTIONS OR OTHER TESTS AND INSPECTIONS: FIREPROQI"i G: phoeme it ittspectioc Density Tests Thictaess Tesis — !aspect 112whing INSULATING CONCRETE_ ....... Sample and Test — Placeoieatlnspeetfoit !fait Weights FILL MATERIAL: Acceptance Tests Ph=ma lntpecdGn FxidDensity. STRUCTURAL WOOD-- - Sheat W88 Hai inS In4mc ion — iaspenionof Glu-IamFab. inspection of -Truss Joist Fab. Samplsaw Test Compn.mrs •� Excavation/Grading/Site Prep • Soil bea3Mverification,, • General site monitoring during wet weather constructs- • Placement of fill and compaction • Temporaxy and final erosion control v Subsurface drainage installation - Tefephoac No-_ — - �" _ Dam; ._