Loading...
October 17th, 2007 Ed Baker, P.E. letter.pdfd 3.5 fi789, /, i 4{ 5 -1O4,+8, BAKER ENGINEERS, INC., P.S. 1 2 1; $ 1 L V V V F 1 t s r s°0010410 STRUCTURAL DESIGN t11 0091001 123 4TH AVE. N. Phone: (425) 771-6666 SINCE 1977 EDM©NDS, WA 98420 t=ax: (425) 771-6558 www-1xikerengineers.com Email: maitbox~erengineers.c om DATE: October 17, 2007 Jeff Quinn A R EVISlON 842 Walnut St.®V Edmonds, WA 98020 OCT SUBJECT: Project Quinn Deck/Hot Tub BUILDING DEP4RTMEN r Project Address: 842 Walnut St. CITY OF dD Nlav Edmonds, WA 98020 Job No.: 07-045 Dear Jeff - We have investigated the alternate beam to rim: joist connection you have made at northeast corner of the deck- We understand you used a HUCQ410 joist hanger with (12) 10d x 1 W nails_ This connection is adequate to carry the load at the end of the ream_ If you have any questions please call our office. Sincerely, BAKER ENGWEERS, INC-, P -S. A � -Felt" Edwin F. Balser, P.E., S.E. Principle # l 2/1012009 J