Loading...
Oliver Residence CSS Letter 2019.05.29.pdf1 of 2 LONGITUDE ONE TWENTY° ENGINEERING & DESIGN STRUCTURAL ENGINEERING SERVICES - CSS Document created as of the 291h day of May, 2019 Project Name: Oliver Addition Project Number: S190226-3 Project Location: 19806 80th PI. W, Edmonds, WA Client's Name: Richard and Sarah Oliver (Owner) Client's Address: 19806 80th Pl. W, Edmonds, WA To whom it may concern, L120 was contacted to revise the connection framing of the (plan) east -west running 8-3/4"x10-1/2" Glulam beam. These revisions were requested to eliminate all exposed connection plates to promote the aesthetics of this exposed beam. The connection on the (plan) west end of the beam is critical as it pulls lateral loads from the roof diaphragm into the adjacent shear wall. L120 has required that a HDU2 Holdown be installed with a S/8" x 10" lag screw into the end grain of the beam. Please refer to the attached SSK-01 for clarification. The connection on the (plan) east end of the beam is a gravity connection only and requires only a positive connection to the bundled studs below. This has primarily been achieved by toenails from the bundled studs below and the perpendicular wall framing into the side of the beam with a full height stud attaching directly to the beam. To further tie-in this connection, the contractor shall install (3) %" x 6" SIDS screws, driven at an angle (toenailed) from the face of the bundled studs below into the bottom of the beam. These screws shall be placed a minimum of 2" below the top of the studs and shall be fully embedded into the beam above. Contractor to ensure that splitting of the wood does not occur with the installation of these screws. No additional clips or hardware are required for this connection. Please let us know if you have any questions. Sincerely, ♦•4� i �1ii.9�•♦ ♦. S�ONAL �N. • Mans R. Thurfjell, P.E. L120 Engineering & design mthurfiell@1120engineering.com Carl M. Harris, P.E. L120 Engineering & design charris@1120engineering.com LONGITUDE ONE TWENTY ENGINEERING & DESIGN PROJECT SUBJECT BY 2of2 PROJECT NO. SHEET NO. S190226-3 SSK-01 Oliver Addition Concealed Glulam Connections CMH DATE 05/29/2019 HDU2 HOLDOWN W/ (1) 5/8" nIARA u 1(1" I nr Qr'QQ\A/ INTO /I BEAM AN ')TUDS L120 ENGINEERING & DESIGN