Loading...
OMT - TIA.pdfCity of Edrnorids Traffic Impact Analysis Worksheet Name of Proposed Project: Old Milltown - Suite 4 A, B & C- Specialty Retail Tenant Improvement Owner/Applicant Colby Real Estate LLC. c/o J Properties Naine 10655 NE St., Suite 9011 S(reet/Maihng Address Bellevue WA 98004 City Telephone: Applicant Contact Person- Gvelurt Ricberts, Grace Architects, PLL Naine 7310 15th Ave NW Street/Mailing Address Seattle WA 98117 State Zip City Telephone: (206) 957-9800 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): LSA Engineering Robert L. Long, PE State Zip Firin Minie Contact Mune Telephone: (425) 775-1591 RobL@LSAEngineehng.corn THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated I ancl 7 only (Worksheet/Checklist) It. More than 25 peak -hour trips generated All sections L PROJECT DESCRIPTION ,t. Locaition - Street address: 201 5th Ave S (Attitch it a,icinily inap and sited pan.) b. Specify existing land use: Commercial- permitted as Shopping Center c. Specify proposed type Lind size of developnient: Specialty Retail- 2,767 sf (# qfresidential units andlor squareft)otage ol'building) Rcviscd fm 0124110 E82 - Trqjfic Impaci Aafdvsis Work shcet Ptl'qv I o.1 5 d. Date cons(ruction will begin anti be completed: March 2011 I July 2011 e. Define proposed access locations: On street parking, no driveway. f. Define proposed sight distance at site egress locations: On street parking, no driveway. 2. TRIP GENERATION - NIA, Site Development already permited Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation nianual- For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peals may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) _ PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Re,visecl on 6V24/10 F82 -Traffic 6npactAnalpsis Worksheet Page 2 vf5 3. TRIP DISTRIBUTION- NIA, Site Development already permited Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model.' 4, SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY - NIA, Site Development already permited a. Have sight distance requirements at egress location been met per AASHTO requirements'? h. Intersection Level of Service (LOS) Analysis: IrltehseCti0715'to be evaluetted shall be determined by the City of Ed ponds Traffic Engineer Existing Conditions LOS 95% Delays Year of Opening LOS Delays Dive Years Beyond Change of Land Use Five Years Beyond Change of Laird Use LOS Delays c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): e. if appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history' (only required for access to principal and minor arterials): Available upon request at City of Edmonds Development Services Department Available upon request at City of Edmonds Police Department Revised ort 6124110 E82 - Traffic Impact Analysis Worksheet Page 3 o.1'5 5O % 95% Existing Conditions Year of Opening Dive Years Beyond Change of Land Use e. if appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history' (only required for access to principal and minor arterials): Available upon request at City of Edmonds Development Services Department Available upon request at City of Edmonds Police Department Revised ort 6124110 E82 - Traffic Impact Analysis Worksheet Page 3 o.1'5 5. TRAFFIC VOLUMES- NIA, Site Development already permited Provide the following and other planned development traffic within the city. a. Describe existing ADT and peals -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peatc-hour counts, including; turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning nuovenients, five years after the project has been fully open (Will] and without project traffic). d. State annual background traffic growth factor and source: G. LEVEL OF SERVICE (LOS) ANALYSIS - NIA, Site Development already permited a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments' must also be factored into the LOS calculations. b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124/10 &42 - Traffic: Impact Analysis Worksheel Page 4 o.1'5 LOS LOS Existing Conditions Existing Delays Year of' Opening With Project Without Project Five Years Beyond Change of Land Use With 1 tojeet Without Project b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6124/10 &42 - Traffic: Impact Analysis Worksheel Page 4 o.1'5 7. I'VITTIGA'ION RECOMMENDATIONS State recommended measures alid Ices required to mitigate pr(�ject specilic traffic impacts. 'ri-affic 1, impact fee shall be calculated from the Edmonds 1�ci,,id Impact Fee R; lc: Study Table 4 (attached) and ads identified in ECDC 18.82.120, except as otherwise provided for independent fee calcul'iti011's in FCDC 18,82.130, iC CMANGE IN USE, FCC I01- 1)1-iO]- LISC shall be based oil fee established at the linic the prior use \vis lici-mitted. If the I)l-CViOWS use wall Ilel"MIUCCI prior to the adoption of Ordinance _3516 (el'I'cclive date: 09/12/04), the 2004 ECDC 183 82.120 in-iliact I'CC shall he. Used. Units in ITE Land Use Category Per Unit square fcct, i Fee Fee Rate # of dwelling, Nem, Use Specialty Retail $0.93 X 2,767 sf $2,573.31 , I"Hor Use Shopping Center $0.,93 X 2,767 sf N Nv PriI'o'r Use Fcc� $2,573.31 �[�JseFee�-$ 2�,T73.31�� - ' 1 NEW DEVELOPMENT Units ill ITE Land Use Category Per Unit SLILI.are Icet, Fee Rate # of chvellill" v I']), etc. New Use $ X MITIGATION FEE RECOMMUNDATION: $0,-00 INDEPENDENT FEE CALCULATION: $200.00(+consultant fce) $ TOTAL TRAMC IMPACT FEE $0.00 City of ElInionds, Engineering Division Appi-oval. Fam No imiiact ttts, will be lose, 1101- Will credit be -given, I'm an inilme[ tee calculatim FOSLiltillL� in to net nco,ative, Z RrOsrd on 6124110 1,,S2 - D-affiL lmpoI Anafvvs Vllorksheei Mige 5 of5 �. C: X. li§ :3 LL., .. h sego N 7th Ave N ` .70) n �,.V 61h Ave $ N _. 's`!- 60,0. kv4 ... ._67ff! Ave N... ...... 1'�l AVOnom+, - . p'" 7: 04 %J71..' i�J j3 C� LI 31l ' e th Ave S §th Ave a 3rdXl Ave 3rd Ave E puz r "' -z.''�°.�..a�^rx✓"`-,�r^� ,���� t°`� _ 5�is{E.. ,ter as, � : ;� � � _ IE; . RR -� Lzi qz �r-c �"'� ",-"`.` >P z�y,., ,�}✓`�. S s�.� ^'t, __ f-� -'_ � .'� ;.. �� x �' int sA