Loading...
O'Neal Residence PeerReview_tm.pdf Technical Memorandum TO: Leif Bjorback, Building Official City of Edmonds Development Services Department, Building Division FROM: Sean Gertz, EIT and Steven Wright, PE DATE: June 26, 2017 RE: Geotechnical Peer Review Submittal Package for Structure Located in a Critical Area al Residence 15716 72 nd Avenue West Edmonds, Washington This technical memorandum summarizes the results of our geotechnical peer review for the permit submittal package that was submitted to the City of Edmonds (City) for the proposed referenced development within a critical area located in Edmonds, Washington. The purpose of our geotechnical peer review is to review portions of the submittal package and assess its compliance with the City development and building permit requirements as contained in Edmonds Community Development Code (ECDC) Chapter 19.10 for sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area (ESLHA). This review also assesses the submittals compliance with the requirements of Chapters 23.40, 23.50, 23.80, and 23.90 of the ECDC as required or noted in Chapter 19.10. This geotechnical peer review was accomplished in accordance with Task Order No. 17--Call Geotechnical and Environmental Engineering Services Agreement with the City. We reviewed the following information forwarded by the City: Completeness Review Pre-Application Form for Earth Subsidence Landslide Hazard Area projects, stamped Received May 9, 2017 Critical Area Determination (CRA20170061), stamped Received May 9, 2017 North Edmonds Earth Subsidence and Landslide Hazard Areas Map with signed signatory block, dated January 18, 2017 Vicinity Map, prepared by LDC Inc. on July 18, 2013 Topographical Map and Survey, prepared by LDC on November 4, 2015 Land Clearing/Tree Cutting Plan, prepared by Creative Landscape Solutions on April 8, 2017 Geotechnical Reports (stamped by Geotechnical Engineer), prepared by Geotech Consultants, Inc. on December 16, 2016 and July 12, 2013 Civil Plans (Grading, Storm Drainage, TESC, Utilities; stamped by Licensed Engineer), prepared by LDC on March 17, 2017 Building Construction Plans (stamped by Architect), prepared by Nash & Associates on April 20, 2017 130 2nd Avenue South Edmonds, Washington 98020 (425) 778-0907 Landau Associates Structural Design Calculations (stamped by Structural Engineer), prepared by Upstate Engineering on April 15, 2017 Lead Design Professional Designation and Statement, prepared by Nash & Associates on May 5, 2017 Applicant/Owner Liability and Landslide Acknowledgment, dated January 5, 2017 Geotechnical Hazard Identification/Declaration and Mitigation Statement of Risk from Geotechnical Engineer and Civil Engineer of Record, prepared by Geotech Consultants, Inc. on May 4, 2017 and LDC on May 5, 2017 Structural Engineer Declaration, prepared by Upstate Engineering on May 9, 2017 Applicant/Owner Covenant to Notify and Hold Harmless, dated January 5, 2017 Affidavit of , dated May 9, 2017. Based on our review of the information that was submitted, it is our opinion that the geotechnical reports that were prepared and submitted for this project provide a good discussion of site conditions and risks, and provide geotechnical recommendations that appear to be appropriate for design. In addition, the reports appear to adequately document existing site conditions based upon field reconnaissance and subsurface explorations, and acknowledges the presence of, and adequately evaluates, seismic, erosion and landslide hazards on the property. The submittal package that we reviewed includes the majority of the information in Section 19.10.030 of the ECDC that is identified as being required. However, ǞĻ ŅƚǒƓķ ƷŷĻ ŅƚƌƌƚǞźƓŭ ķĻŅźĭźĻƓĭźĻƭ in the information that was submitted: The vicinity map does not adequately identify the lot (Lot 2) within the subdivision on which the development is proposed. The vicinity map also does not identify existing conditions such as known landslide masses, debris flows, or mud flows on or near the site. The topographic survey does not show distances to existing habitable structures on adjacent sites within 50 ft of the property line. The topographic survey also does not show the lowest footing, basement slab, or finished floor elevation of existing and proposed structures on the property and on adjacent properties. The civil plans do not include proposed bottom of footing elevations. The civil plans do not include fill/soil stockpile limitation provisions, slope protection plans, and temporary shoring plans as required in ECDC 19.10.030. As such, the civil plans should be revised to reflect such provisions, including specific location(s) for stockpiling, height restrictions on stockpiles, and guidelines for protection and maintenance of stockpiled fill/soil. The geotechnical engineering report does not include a letter of concurrence from a geologist. The geotechnical engineering report, dated January 18, 2017 by Geotech Consultants Geotechnical Peer Review al Residence 15716 72 Ave W 2 June 26, 2017 nd Landau Associates to us and we recommend that this value be checked and adjusted, if necessary. No documentation of required bonds, frozen funds, or adequate instrument of credit was included in the submittal, as required in ECDC 19.10.030. This technical memorandum has been prepared for use by the City of Edmonds in evaluating the adequacy of permit submittal documents related to the proposed residential structure located at 15716 72 nd Avenue West. The focus of this review was the geotechnical aspects of the application. The purpose of the review was to assess the adequacy of the application documents for compliance with City requirements contained in ECDC 19.10 and conformance with conventionally accepted geotechnical engineering practices. This geotechnical peer review by Landau Associates does not Geotechnical Engineer of Record and other design professionals to prepare an appropriate design for the site conditions. We appreciate this opportunity to be of service to the City. Please contact us if you have any questions or if we may be of further service. LANDAU ASSOCIATES, INC. Sean Gertz, EIT Senior Staff Geotechnical EIT Steven R. Wright, PE Principal SMG/SZW/rgm \[\\\\EDMDATA01\\PROJECTS\\074\\194\\020\\R\\PEERREVIEW_TM.DOCX\] Geotechnical Peer Review al Residence 15716 72 Ave W 3 June 26, 2017 nd