ONLINE PERMIT # BLD20180584.pdfOp ED&
�_ °+� CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
IMFo PHONE: (425) 771-0220 - FAX: (425) 771-0221
nc. 1 s9
STATUS: ISSUED 04/27/2018 Permit #: BLD20180584
Expiration Date: 10/29/2018
Parcel No: 00594500000102
XIAOYING & CINAN HUANG
1803 TALBOT RD
EDMONDS, WA 98026
Project Address: 18003 TALBOT RD, EDMONDS
T YLER T AFT
2815 BAKER AVE # 104
EVERETT, WA 98201
(425) 3 87-1507
Water service install fromwater meter to garage with PRV
VALUATION: $0
APOLLO PLUMBING LLC
C/O TAFT TYLER
5407
71 ST AVE NE
MARYSVILLE, WA 98270
(425)387-1507
LICENSE #: APOLLPL903LT
EXP:07/07/2018
PERMIT TYPE: Residential
PERMIT GROUP: 47 - Plumbing/Water Service Line/Fountain (ONLINE)
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY:
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: ( 0 X 0 FT.)
CODE:
OTHER: ------- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 1
ILOT #:
EXISTING ARLk
BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0
PROPOSED AREk
BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
BEDROOMS:0 BATHROOMS:0
BEDROOMS:0 BATHROOMS:0
FRONTII SETBACK
REQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED:
HEIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED:
SET BACK NOTES:
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION
INSURANCE AND RCW 18:27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
Signature Print Name Date
(lu „� u��� III-Z-7/,wlg
Released
Date
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC110/ IRC110.
= FIRE = APPLICANT = ASSESSOR = CITY
STATUS: ISSUED
BLD20180584
• Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building.
• City approved plastic piping may be used in water service piping provided that where metal water service piping is used for
electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical permit and
inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor &
Industries Electrical Division at 425-290-1309.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits
of ECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly fromthe issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements.
• Owner/Contractorto provide Water Service Line asbuilt at final inspection. See City Standards forrequirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT
TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING
1. Go to: www.edmondswa.gov
2. Then: Services
3. Then: Permits/Development
4. Then: Online Permit Info
5: If you don't have one already, create a
login (upper right hand corner)
6: Schedule your inspection
Building Department Inspections
are now scheduled online. If you
have difficulties, please call the
Building Department front desk for
assistance during office hours.
(425) 771-0220
ENGINEERING (425) 771-0220 EXT. 1326
FIRE (425) 775-7720
PUBLIC WORKS (425) 771-0235
RECYCLING (425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon.
• E-Water Service Line