ONLINE PERMIT #BLD20171590.pdfOF ED&
�_ °+� CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
IMFo PHONE: (425) 771-0220 - FAX: (425) 771-0221
nc. 189
STATUS: ISSUED 11/14/2017 Permit #: BLD20171590
Expiration Date: 05/14/2018
Parcel No: 00548900001912
SAGA INVESTMENTS LLC
C/O KEVIN HARRIS
1800 187TH AVE NE
BELLEVUE, WA 98008
(206)200-1323
Project Address: 1112 OLYMPIC AVE, EDMONDS
SAGA INVESTMENTS LLC
C/O KEVIN HARRIS
1800 187TH AVE NE
BELLEVUE, WA 98008
(206) 200-1323
kitchen: relocate sink, add 2nd prep sink, dishwasher movement
master bath: relocate 2 sinks, 1 shower, 1 tub, 1 toilet
downstairs bath: 1 shower, 1 sink, 1 toilet
mud room: 1 washer, 1 sink
VALUATION: $0
SAGA INVESTMENTS LLC
C/O KEVIN HARRIS
1800 187TH AVE NE
BELLEVUE, WA 98008
(206)200-1323
LICENSE #: EXP:
PERMIT TYPE: Residential
PERMIT GROUP: 47 - Plumbing/Water Scrvicc Line/Fountain (ONLINE)
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY:
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: ( 0 X 0 FT.)
CODE:
OTHER: ------- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNIT S: 0
LOT #:
EXISTING AREA
BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0
PRO PO S ED AREk
BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
BEDROOMS:0 BATHROOMS:0
BEDROOMS:0 BATHROOMS:0
FRONTII SETBACK
.SQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED:
[EIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED:
ET BACK NOTES:
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION
INSURANCE AND RCW 18:27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
J 6),V //1/-112 017
Signature Print Name Date Releas6d By
Date
= FIRE = APPLICANT = ASSESSOR = CITY
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC110/ IRC110.
STATUS: ISSUED
BLD20171590
• Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits
of ECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly fromthe issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT
TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING
1. Go to: www.edmondswa.gov
2. Then: Services
3. Then: Permits/Development
4. Then: Online Permit Info
5: If you don't have one already, create a
login (upper right hand corner)
6: Schedule your inspection
Building Department Inspections
are now scheduled online. If you
have difficulties, please call the
Building Department front desk for
assistance during office hours.
(425) 771-0220
ENGINEERING (425) 771-0220 EXT. 1326
FIRE (425) 775-7720
PUBLIC WORKS (425) 771-0235
RECYCLING (425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon.
• B-Plumb Rough hi
• B-Plumbing Final