Loading...
ONLINE PERMIT #BLD20171590 (2).pdfOF ED& �_ °+� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 IMFo PHONE: (425) 771-0220 - FAX: (425) 771-0221 nc. 189 STATUS: ISSUED 11/14/2017 Permit #: BLD20171590 Expiration Date: 05/14/2018 Parcel No: 00548900001912 SAGA INVESTMENTS LLC C/O KEVIN HARRIS 1800 187TH AVE NE BELLEVUE, WA 98008 (206)200-1323 Project Address: 1112 OLYMPIC AVE, EDMONDS SAGA INVESTMENTS LLC C/O KEVIN HARRIS 1800 187TH AVE NE BELLEVUE, WA 98008 (206) 200-1323 kitchen: relocate sink, add 2nd prep sink, dishwasher movement master bath: relocate 2 sinks, 1 shower, 1 tub, 1 toilet downstairs bath: 1 shower, 1 sink, 1 toilet mud room: 1 washer, 1 sink VALUATION: $0 SAGA INVESTMENTS LLC C/O KEVIN HARRIS 1800 187TH AVE NE BELLEVUE, WA 98008 (206)200-1323 LICENSE #: EXP: PERMIT TYPE: Residential PERMIT GROUP: 47 - Plumbing/Water Scrvicc Line/Fountain (ONLINE) GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD: FENCE: ( 0 X 0 FT.) CODE: OTHER: ------- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNIT S: 0 LOT #: EXISTING AREA BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 PRO PO S ED AREk BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 BEDROOMS:0 BATHROOMS:0 BEDROOMS:0 BATHROOMS:0 FRONTII SETBACK .SQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED: [EIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: ET BACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. J 6),V //1/-112 017 Signature Print Name Date Releas6d By Date = FIRE = APPLICANT = ASSESSOR = CITY ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC110/ IRC110. STATUS: ISSUED BLD20171590 • Final approval on a projector final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00amto 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING 1. Go to: www.edmondswa.gov 2. Then: Services 3. Then: Permits/Development 4. Then: Online Permit Info 5: If you don't have one already, create a login (upper right hand corner) 6: Schedule your inspection Building Department Inspections are now scheduled online. If you have difficulties, please call the Building Department front desk for assistance during office hours. (425) 771-0220 ENGINEERING (425) 771-0220 EXT. 1326 FIRE (425) 775-7720 PUBLIC WORKS (425) 771-0235 RECYCLING (425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Plumb Rough hi • B-Plumbing Final