Loading...
Ordinance 4055 2016 Comp Plan Amendments.pdf Exhibit A Comprehensive Plan Text Amendments APPENDIX D: MARINA BEACH MASTER PLAN \[NewPage/Appendix\] \[Include Adopted Marina Beach Master Plan here\] City of Edmonds Parks, Recreation and Open Space Plan Marina Beach Park Regional Park Park Features 3.37 Acres 0.5 Miles walking trail Playground Sand volleyball court Small boat launch (ramp) View point Portable restrooms (3) Shoreline access, gravel beach Off-leash dog area Site considerations Zoned Commercial Waterfront Marine Protected Area 31 additional parking stalls provided by Port of Edmonds under SEPA/SMP approval permit Planned Improvements Restroom (large) Replace play area (large) Continued maintenance Appendix A: Existing System A-39 City of Edmonds Parks, Recreation and Open Space Plan 3.JUse the opportunity of upgrades and maintenance at the Senior Center site to integrate the property more completely with the rest of the waterfront. .K Secure ongoing funding for the Beach Ranger program, recognizing 3 the important role in tourism, building a connection to the shoreline and expanding appreciation for natural resources and habitat conservation. Goal 4: Natural Resource and Habitat Conservation 4.AInventory and classify natural resources and habitat areas within of the park system. 4.BConduct a city tree inventory and map to create a baseline of information to enhance tree canopy. 4.CConnect new generations of residents and visitors to natural resources in Edmonds through Discovery Programs utilizing ranger naturalists. 4.DCollaborate on public information programs to help property owners (including the City) identify and remove invasive vegetation. 4.ECollaborate with various organizations in invasive plant removal and native vegetation planting in accord with landscaping plans for parks within the city limits. Suggest park maintenance projects that would be good candidatesfor the annual Arbor Day event sponsored by the Tree Board. .FProvide low impact access to natural resource areas to allow for 4 enjoyment and interaction with nature. 4.GSteward the urban forest using appropriate maintenance of street and park trees, clear removal and replacement policies and providing information about urban forestry to property owners. 4.IConsider expanding the function and facilities around the Willow Creek Hatchery to create a more expansive interpretive center that Replaceexisting includes the Edmonds Marsh. Policy4.Hwith: H 4-8 Chapter 4: Action Plan Implementation Actions and Performance Measures Implementation actions are steps that are intended to be taken within a specified timeframe to address high priority sustainability goals. In addition, the Comprehensive Plan contains a small number performance measures (no more than one per element) that can be used to monitor and annually report on the implementation and effectiveness of the Comprehensive Plan. The Comprehensive Plan contains a small number performance measures (no more than one per element) that can be used to monitor and annually report on the implementation and effectiveness of the Comprehensive Plan. Performance measures, as identified in the Comprehensive Plan, are specific, meaningful, and easily obtainable items that relate to sustainability and can be reported on an annual basis. They are intended to help assess progress toward achieving the goals and policy direction of each major Comprehensive Plan element. The measure identified below is specifically called out as matching the above criteria and being important to capital facilities goals and will be reported annually, along with performance measures for other Comprehensive Plan elements. It is not intended to be the only measure that the City may use for capital facilities purposes. Implementation Action: Develop level of service standards for key public facilities by the end of 2017 and consider including the standards in the Comprehensive Plan. Performance Measure: Project delivery results - based on comparing projects in the Capital Facilities Plan to what is actually done on the projects. Capital Facilities Following is a list of publicly-owned facilities in Edmonds and other nearby areas. NameName Neighborhood ParksPort of Edmonds Properties Elm St Park1.85CoEMarina 8.1PoE Frances Anderson Center Field1.94CoEWaterfront Businesses14.22PoE Haines Wharf0.69CoEHarbor Square Business Complex15.11PoE Hickman Park5.61CoESubtotal37.43 Hummingbird Hill Park1.22CoE Other City Owned Facilities Mathay Ballinger Park0.51CoELog Cabin Visitor Center/Chamber of Commerce0.03372CoE Pine Street Park1.47CoECity Hall0.5934,074CoE Seaview Park6.05CoEEdmonds Historical Museum0.122,084CoE Sierra Park5.52CoEEdmonds Library and Plaza Room3.0319,520CoE Subtotal24.86Fire Station #1610,700CoE Community Parks Fire Station #179,800CoE Civic Center Playfield7.92CoEFire Station #206,400CoE Boys and Girls Club 6,856 CoEFishing Pier Ranger Station1,200CoE Stadium 7,140 CoEFishing Pier Restroom918CoE Skate Park 6,000 CoEFrances Anderson Center55,000CoE City Park13.96CoEKarlsten House0.222,250CoE Yost Memorial Park44.14CoE 'Old' Public Works3.9414,100CoE Pool 4,808 Sewage Treatment Plant 115,200CoE Subtotal66.02 24,804Public Safety Complex2.6130,940CoE Moved Regional Parks Public Works Operation and Maintenance Center4.3528,000CoE 144 Railroad Ave Tidelands0.9CoEWade James Theatre2.346,289CoE from Brackett's Landing North5.11CoESubtotal17.23 336,847 School Brackett's Landing South2.22CoE Edmonds School District Properties in Edmonds Marina Beach Park3.37CoEChase Lake Elementary10.26 57,697 ESD 15 District Olympic Beach2.82CoEEdmonds Elementary School 8.58 34,726 ESD 15 Senior Center2.63CoEEdmonds-Woodway High School30.19 208,912ESD 15 list Subtotal17.05Former Woodway High School39.75 148,740ESD 15 Special Use Parks Edmonds Homeschool Resource (K-12)ESD 15 Centennial Plaza0.08CoE Schriber Lake High School ESD 15 Dayton Street Plaza0.1CoEMadrona School (K-8)31.3 85,505 ESD 15 Edmonds Library and Plaza Room1.29CoEMaplewood Parent Cooperative (K-8)7.41 76,554 ESD 15 Edmonds Memorial Cemetery and Columbarium6.63CoE Maplewood Center (K-12)ESD 15 Anderson Center Field1.62CoESeaview Elementary8.28 49,420 ESD 15 Hazel Miller Plaza0.09CoESherwood Elementary13.19 43,284 ESD 15 Interurban Trail4.88CoEWestgate Elementary8.34 44,237 ESD 15 Lake Ballinger Access0.19CoEWoodway Elementary9.89 37,291 ESD 15 Meadowdale Community Clubhouse0.993,232CoESubtotal167.19 786,366 Ocean Ave Viewpoint0.2CoE Edmonds School District Properties near Edmonds Point Edwards Scenic Overlook (easement)0.1CoEChase Lake Natural Area10.8ESD 15 Richard F. Anway Park0.17CoECollege Place Elementary9 48,180 Stamm Overlook0.36CoECollege Place Middle School18.7 87,031 Sunset Ave1.14CoELynndale Elementary School10 39,043 Willow Creek Hatchery1.68CoEMeadowdale High School39.56 197,306ESD 15 Subtotal19.52 3,232 Meadowdale Middle School19.38 102,925ESD 15 Open Space Meadowdale Elementary School8.78 57,111 ESD 15 Edmonds Marsh23.37CoEMeadowdale Playfields24.09ESD 15 Edmonds Marsh Open Space0.85CoESubtotal140.31 531,596 Haines Tidelands0.44CoE Other Publically Owned Facilities in Edmonds Hutt Park4.53CoEEdmonds Center for the Arts2.54PFD Maplewood Hill Park9.96CoEEdmonds Conference Center0.33 11,252 EDCC Meadowdale Natural Areas1.07CoEEdmonds Fishing Pier0.61WDFW Olympic View Open Space0.49CoEEdmonds Underwater Park and Higgins Trails33.21DNR Pine Ridge Park23.78CoEOlympic View Water District Maintenance Facility0.83 7,480OVWD Seaview Reservoir1.31CoEPublic Utility Water District #10.68PUD Shell Creek Open Space1.04CoESubtotal38.2 18,732 Wharf Street0.12CoE Other Publically Owned Facilities near Edmonds Willow Creek Park2.25CoEBallinger Playfield and Former Golf Course52.59MLT Subtotal69.21Esperance County Park9.59SnoCo Meadowdale Beach County Park144.34SnoCo South County Park118.55SnoCo Subtotal325.07 Figure 43: List of Publicly-owned Capital Facilities Capital Facilities140 City of Edmonds Parks, Recreation and Open Space Plan Civic Center Playfields & Skate Park Other Parks and Facilities Park Features Skate park 7.92 Acres Portable restrooms (2) 0.3 miles of walking trail Petanque courts (4) Playground Cinder track (.25 miles) Basketball courts (2) Stadium Tennis courts (2) th This site used for 4 of July Fireworks display, Football field (1 youth) Taste of Edmonds, Wenatchee Youth Circus Soccer fields (1 adult, 1 youth) Site considerations Owned by Edmonds School District Operated by City of Edmonds Zoned Public Use Planned Improvements Acquisition, master planning and development Add large play area Continued maintenance A-20 Appendix A: Existing System Exhibit B Capital Facilities Plan CITY OF EDMONDS CAPITAL FACILITIES PLAN 2017-2022 DRAFT 1 2 CFP GENERAL 3 4 $3,135,000 UnknownUnknownUnknown 2023-2037 5-$23 M $3-4M $1,500,000 $1,500,000 2022 $1,500,000 $1,500,000 2021 2020 $0 2019 $0 2018 $0 $135,000 $135, 000 $2,100,000$2,100,000 $1,600,000 $500,000 2017 Federal (Unsecured) Annual CFP Totals Private Partnership Capital CampaignPark Impact Fees Revenue Source REET 1 / Grants School District REET / Grants State Funds G.O. BondsG.O. BondsG.O. BondsG.O. Bonds Public VotePublic VotePublic Vote Foundation REET 2 GrantsGrants TotalTotalTotalTotalTotalTotalTotal (2017-2022) $2,235,000 $1,600,000$2,100,000 Total Cost$135,000$135,000$500,000 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 ConceptualConceptualConceptualConceptualConceptual Completed Current Project Complete Phase1 Phase EIS Total CFP RCO Land Opportunity Acquisition UnknownUnknownUnknownUnknown Grant US DOT RCO Center (Feasibility study complete Meet citizen needs for an Aquatics In cooperation with ESD#15 develop Replace / Renovate deteriorating Rehabilitate grounds, parking, beach Relocate ferry terminal to Marina Acquire and develop property for a access and area around Senior a community park and athletic City master plan in progress year round public market. Center, walkway access. Purpose building in City Park. August 2009). complex. Beach. Community Park / Athletic Complex - Parks & Facilities Maintenance & Operations Waterfront Redevlopment/Waterfront Walkway Edmonds Crossing WSDOT Ferry / Mutimodal Old Woodway High School: Phase 2 and 3 Public Market (Downtown Waterfront) Project Name Civic Center Development Aquatic Facility Completion Building Facility 5 6 PROJECT NAME:ESTIMATED PROJECT COST: Aquatic Facility$5,000,000 – $23,000,000 PROJECT DESCRIPTION:Implement recommendations of the Aquatics Feasibility Study completed in 2009. Six scenarios were presented and the plan recommended by the consultants was a year round indoor pool with an outdoor recreational opportunity in the summer. The project is dependent upon a public vote. PROJECT BENEFIT/ RATIONALE:The current Yost Pool,built in 1972,is nearing the end of its life expectancy. The comprehensive study done in 2009 assessed the needs and wants of Edmonds citizens in regard to its aquatic futureas well as the mechanical condition of the current pool. SCHEDULE:2021-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Eng. & Admin. Construction 1% for Art TOTAL$5m -$23m * all or part of this Project may qualify for 1% for the Arts 7 PROJECT NAME:Civic Center Development ESTIMATED PROJECT COST: $3,135,000 / Stadium Demolition : PROJECT DESCRIPTIONCivic Center Development / Stadium Demolition. As part of the Master planning process for Civic, andin consideration of the current condition of the stadium, it is being recommended to demolish the current stadium. The City also has some grant funds available to assist with this. In addition, develop a signature downtown park at this site. PROJECT BENEFIT/ RATIONALE:Civic Center Development / Stadium Demolition. The Civic Master plan will be complete by early 2017. Funds will be set aside, and grant funds applied for in order to develop the master plan. This is a high priority in the PROS plan. SCHEDULE:2017 -2022 COST BREAKDOWN PROJECT COST201720182019202020212022 Construction $135,000$0$0$0$1,500,000$1,500,000 TOTAL$135,000$0$0$0$1,500,000$1,500,000 8 CITY OF EDMONDS CAPITALFACILITIES PLAN DESCRIPTION PROJECTNAME:CommunityPark/Athletic ESTIMATED PROJECTCOST: Unknown ComplexattheFormerWoodwayHighSchool PROJECTDESCRIPTION:Develop communityparkandregionalathleticcomplexwithlighted orunlightedfieldsandrecreationalamenitiesinpartnershipwithEdmondsSchoolDistrict, communitycolleges,user groups,and otherorganizations. Developmentdependentupon successfulregionalcapitalcampaign.$10m -$12Mproject for all3 phases. : PROJECTBENEFIT/RATIONALEThesiteiscurrentlyanunderutilizedandundermaintained facilitywithgreatpotentialas communitymulti-useactivepark.Sitehas existing controlled access, greenbelt,parking and 4-courttennisfacilitywithsubstandard fields. Highlyurbanized areawith150,000residentswithin 5-mileradius. Future maintenancesupportedbyuserfees. Phase 1 was completed in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE:2017-2037 COSTBREAKDOWN PROJECT2017201820192020202120222023- 2037 COST Planning/Study Engineering& Administration Construction 1%forArt TOTAL Unknown * allor a portionofthisprojectmayqualifyfor1%fortheArts 9 PROJECT NAME:ESTIMATED PROJECT COST: Parks & Facilities $3-$4 Million Maintenance & Operations Building PROJECT DESCRIPTION:The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. : PROJECT BENEFIT/ RATIONALEParks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE:Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Eng. & Admin. Construction 1% for Art TOTAL$3m -$4m * all or part of this Project may qualify for 1% for the Arts 10 PROJECT NAME: ESTIMATED PROJECT COST: Waterfront Redevelopment $2,100,000 / Waterfront Walkway Completion PROJECT DESCRIPTION:Work with Sr. Center to renovate surrounding park, parking lot and walkway. Remove creosote pier, reintroduce habitat for fish and wildlife. Increase access to the waterfront. Connect waterfront walkway from Brackett’s Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. PROJECT BENEFIT/ RATIONALE:Provide a new Seniorand Community Center and provide a new beachfront walkway. One of the top priorities in the PROS plan is to open up beachfront access. 2017-2022 SCHEDULE: COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Eng. & Admin. $100,000 Construction $2,000,000$0$0$0 1% for Art TOTAL$2,100,000$0$0$0$0 * all or part of this Project may qualify for 1% for the Arts 11 PROJECT NAME:ESTIMATED PROJECT COST: Edmonds CrossingUnknown WSDOT Ferry / Multimodal Facility PROJECT DESCRIPTION:Edmonds Crossing is multimodal transportation center that will provide the capacity to respond to growth while providing improved opportunities for connecting various forms of travel including rail, ferry, bus, walking and ridesharing. NOTE: The design of Marina Beach Park is aseparate project. PROJECT BENEFIT/ RATIONALE:To provide an efficient point of connection between existing and planned transportation modes. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT 2017201820192020202120222023- COST2037 Engineering & Administration Right of Way Construction 1% for Art TOTAL Unknown * all or part of this project may qualify for 1% for the Arts 12 PROJECT NAME:ESTIMATED PROJECT COST: Public Market (Downtown Unknown Waterfront) :Work with community partners to establish a public PROJECT DESCRIPTION market, year around, on the downtown waterfront area. PROJECT BENEFIT/ RATIONALE:The project will help to create a community gathering area, boost economic development, bring tourists to town, and will be a valuable asset to Edmonds. SCHEDULE: This project depends on the ability to secure grant funding, and community partners willing to work with the city to establish this. This potentially can be accomplished by 2018. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Eng. & Admin. Construction 1% for Art TOTALUnknown * all or part of this project may qualify for 1% for the Arts. 13 CFP TRANSPORTATION 14 15 $75,000$300,000$10,046,000$6,600,000$6,000,000$72,400,000 $75,000$300,000$8,690,000$1,356,000$1,600,000$1,000,000$72,400,000 2023-2037 $5,000,000$5,000,000$285,450$1,557,000$3,795,000$330,000$1,800,000$3,795,000$152,000$1,091,000$1,540,000$175,000$1,091,000$1,540,000 $122,000$87,500$535,000$193,000$175,000$535,000 202020212022 $71,000$87,500$118,000$776,000$135,000$776,000$44,550$243,000 $17,000$23,000 2019 $86,500$2,073,163$13,500$4,993,163$100,000 20172018 (Federal or State secured)$2,920,000$300,000 $25,000$300,000 (Federal or State unsecured)(Federal or State unsecured) $375,000(Federal or State unsecured)$2,600,000(Federal or State unsecured)$744,500(Federal or State unsecured)$894,000(Federal or State unsecured)$5,637,450(Federal or State unsecured)$2,783,000(Fede ral or State unsecured) (Federal or State secured)$10,000,000(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) (Federal or State secured) Funding Source (Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured) (Unsecured) TotalTotalTotalTotalTotalTotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) (2017-2022) Total Cost $12,900,000 $3,006,500$2,086,663$5,093,163$5,925,000$2,806,000 $375,000$300,000$158,500$903,000$911,000$287,550 $25,000$17,000$23,000 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 Project Phase Possible GrantConceptual Construction ConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptual Construction Opportunity Appropriation Grant State intersection delay and Level of Service Convert split phasing operation for EB Intersection improvements to improve intersection delay and level of service Realign highly skewed intersection to storage length and an eastbound left through movements, with protected / improvements along SR-99 Corridor. Highway 99 Gateway / RevitalizationInstall gateway elements and safety pedestrian safety (project split with sidewalks to improve capacity and and WB movements to concurrent Install two-way left turn lanes and (mini roundabout is an alternative operations; create new east-west corridor between SR-99 and I-5. westbound left turn lane for 200' Improve intersection safety by Install traffic signal to improve Widen 212th St. SW to add a address safety and improve converting a stop controlled movements to a signalized intersection for NB and SB Purpose permissive LT phasing. Snohomish County) intersection. turn lane. solution). (LOS). 228th St. SW from Hwy 99 to 95th Pl. SR 524 (196th St. SW) / 88th Ave W Hwy 99 @ 212th St SW Intersection Safety / Capacity Analysis 228th St. SW Corridor Safety 76th Ave. W @ 220th St. SW 76th Av. W @ 212th St. SW Project Name Intersection ImprovementsIntersection ImprovementsIntersection Improvements Main St. and 9th Ave S ImprovementsImprovements W 16 $1,183,000$1,183,000$15,441,000$15,441,000 2023-2037 $142,000$334,000$1,837,000$164,000$334,000$1,837,000$152,000$1,085,000$1,955,000$175,000$1,085,000$1,955,000 202020212022 $173,000$1,138,000 $15,000$164,000$30,000$164,000$65,000$420,000$75,000$420,000$200,000$1,138,000 $22,000$23,000$15,000$10,000 $27,00 0 2019 20172018 $2,313,000(Federal or State unsecured)$3,192,000(Federal or State unsecured)$179,000(Federal or State unsecured)$485,000(Federal or State unsecured)$1,311,000(Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured) (Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) Funding Source (Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured) TotalTotalTotalTotalTotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) (2017-2022) Total Cost $2,335,000$3,215,000$1,338,000 $194,000$495,000 $22,000$23,000$15,000$10,000$27,000 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 Project Phase Possible GrantConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptualConceptualConceptual Opportunity Grant to protected LT phasing; upgrade ADA vehicular and pedestrian safety; revise bicycle and pedestrian improvements. Convert EB and WB LT along SR-104 left turn lane (for 275' storage length). 325' storage length) and a soutbound Widen 216th St. SW to add a left turn intersection delay and improve Level Extend left turn storage area for WB add a westbound right turn lane (for Widen 220th St. SW and Hwy 99 to lane for eastbound and westbound Install two-way left turn lanes and sidewalk to improve capacity and geometry to allow for safer turns. movement on SR-104 w/ various Install traffic signal to reduce the curb ramps; and add C-Curb for Install traffic signal to improve pedestrian safety (split with Purpose access management Snohomish County) movements. of Service. 84th Ave. W (212th St. SW to 238th St. SR-104 @ 226th St. SW / 15th St. SW Hwy. 99 @ 216th St. SW Intersection Hwy. 99 @ 220th St. SW Intersection SR-104 @ 238th St. SW Intersection SR-104 @ 95th Pl. W Intersection Olympic View Dr. @ 76th Ave. W Project Name Intersection ImprovementsIntersection Improvements ImprovementsImprovements ImprovementImprovement SW) 17 $1,017,468$1,017,468$3,017,000$3,017,000$610,000$610,000 2023-2037 $100,000$1,105,000$200,000$1,105,000 202020212022 $100,000$106,500$1,182,000 $213,000$1,182,000 $725,000$106,500 $1,870,000$2,595,000$37,500$37,500 $75,000 2019 20172018 $157,121$183,250 $26,129$12,000$12,000$50,600$38,000$88,600 (Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured) (Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured)$1,870,000(Federal or State unsecured)$1,205,000(Federal or State unsecured)$1,288,500(Federal or State unsecured) (Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) (Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) Funding Source (Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured)(Unsecured)(Unsecured) (Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured) TotalTotalTotalTotalTotalTotal TotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) (2017-2022) Total Cost $2,778,250$1,305,000$1,395,000 $157,121$751,129$100,000$106,500 $37,500$37,500$75,000$12,000$12,000$50,600$38,000$88,600 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0Construction $0$0$0 Project Phase ConceptualConceptualConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptual Construction RCO / TIB GrantDesign for construction Opportunity Possible Grant Improve pedestrian safety along 238th Improve pedestrian safety along 236th Improve pedestrian safety along 236th Install traffic signal to improve Level of Add a 2nd WB left turn lane (split with St. SW from 100th Ave. to 104th Ave. connection from SR-104 to Madrona Provide walkway on the west side of crossings along 100th Ave. W, and St. SW, creating a safe pedestrian St. SW, creating a safe pedestrian Access Plan, midblock pedestrian Provide safe sidewalk along short rechannelization with bike lanes / Improve pedestrian safety along Implement Westgate Circulation connection from SR-104. 232nd St. SW from 100th Ave. to Service and intersection delay. Sunset Ave, with various utility sharrows along 100th Ave. W. Purpose Non-motorized Pedestrian / Bicycle Projects missing link. Shoreline). upgrades. SR-104. school. SR-104 @ 100th Ave. W Intersection / 232nd St. SW from 100th Ave. W to SR 236th St SW from Edmonds Way (SR- Sunset Ave. Walkway from Bell St. to Dayton St. between 7th Ave. S to 8th SR-104 @ 76th Ave. W Intersection -238th St. SW from 100th Ave. W to Olympic View Dr. @ 174th St. SW 236th St SW from Edmonds Way Westgate Area Improvements 104) to Madrona Elementary Project Name Intersection Improvements (SR-104) to 97th Ave. W Ave. S Walkway Improvements Caspers St. 104th Ave. W 104 18 $90,000$495,000 $495,00 2023-2037 0 $681,000$680,000$230,000$681,000$680,000$100,000$878,000$100,000$227,000$200,000$1,105,000 $90,00 0 202020212022 $210,000$1,229,000$210,000$1,229,000$84,000$325,000$21,000$120,000$105,000$445,000 $230,000$105,000$105,000$137,000$157,000$200,000$200,000 $30,000$30,000$20,000 2019 20172018 $316,800 $96,200$413,000$30,000 $30,000 (Federal or State unsecured)$1,439,000(Federal or State unsecured)(Federal or State unsecured)$1,591,000(Federal or State unsecured)$409,000(Federal or State unsecured)$978,000(Federal or State unsecured)$105,000(Federal or State unsecured)$137,000(Federal or State unsecured)(Federal or State unsecured)$200,000(Federal or State unsecured) (Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) Funding Source (Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured) (Unsecured) (Unsecured) (Unsecured) (Unsecured) (Unsecured)(Unsecured)(Unsecured)(Unsecured)(Unsecured) TotalTotalTotalTotalTotalTotalTotalTotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) (2017-2022) Total Cost $1,439,000$1,591,000$1,305,000 $141,000$550,000$327,000$105,000$157,000$316,800$413,000$230,000 $90,000$90,000$30,000$30,000$20,000$96,200$30,000 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 Project Phase Possible GrantConceptualPossible GrantConceptualConceptualPossible grantConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptualPossible GrantConceptualConceptual Design Opportunity Grant Provide sidewalk on south side of 15th link of 218th St. SW. from 76th Ave. to Provide safe sidewalk along a missing 238th St. SW from SR-104 to Hwy. 99 Improve pedestrian safety along 84th Improve pedestrian safety along 80th (direct link to Maplewood Elementary Provide sidewalk on one side of 95th St. SW from 8th Ave. S to 9th Ave. S Ave. W, within proximity to Edmonds-Pl. W from 224th St. SW to 220th St. Provide safe sidewalk, connecting to Ave. W. from 238th St. SW to 234th 216th St. SW from Hwy. 99 to 72nd Provide safe sidewalk along short Provide sidewalk on north side of 238th St. SW from SR-104 to Hwy. 99Provide sidewalk on north side of ex. sidewalk along 200th St. SW Ave W (completing missing link) SW completing missing link) Provide short missing link. (completing missing link)(completing missing link) Purpose Woodway High School. missing link. 84th Ave. St. SW. School). Walnut St from 3rd Ave. S to 4th Ave. S 15th St. SW from 8th Ave. S to 9th Ave. 80th Ave. W from 212th St SW to 206th 216th St. SW Walkway from Hwy. 99 to 218th St. SW from 76th Ave. W to 84th 95th Pl. W from 224th St. SW to 220th Maplewood Dr. from Main St. to 200th 2nd Ave. S from James St. to Main St. 84th Ave. W from 238th St. SW to Project Name 234th St. SW 72nd Ave W WalkwayWalkway St. SW St. SW Ave. W St. SW S 19 $630,000$315,000$315,000$765,000$1,170,000 $70,000$50,000$50,000$50,000$50,000$50,000$700,000$630,000$990,000$315,000$315,000$765,000$1,170,000 $990,00 $70,000$50,000$50,000$50,000$50,000$50,000$700,00 2023-2037 00 202020212022 $156,000$633,000 $633,00 0 $156,00 0 2019 20172018 (Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured) $789,000(Federal or State unsecured)(Federal or State unsecured)$0(Federal or State unsecured)(Federal or State unsecured) $0(Federal or State secured)$0(Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) (Federal or State secured)(Federal or State secured)(Federal or State secured) Funding Source (Local Funds)(Local Funds)$0(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured) (Unsecured) (Unsecured) (Unsecured) (Unsecured)Conceptual$0 (Unsecured) (Unsecured) (Unsecured) $0TotalTotalTotalTotalTotal TotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) (2017-2022) Total Cost $789,000$320,000$320,000 $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 Project Phase Possible GrantConceptualConceptualConceptualConceptualConceptualConceptualConceptual Opportunity Grant 104th Ave. from 238th St. SW to 106th ve. W from 218th St. SW to 220th St. ve. W from 188th St. SW to 186th St. Provide sidewalk on one side of 191th Provide sidewalk on one side of 236th Provide sidewalk on one side of 238th Provide sidewalk on one side of 80th Provide sidewalk on one side of 84th Elm Way from 8th Ave. S to 9th Ave. SProvide sidewalk on one side of Elm throughout the City (annual program) St. SW from 80th Ave. to 76th Ave. Minor Sidewalk ProgramComplete short sidewalk stretches St. SW from Hwy. 99 to 76th Ave. W St. SW from Hwy. 99 to 76th Ave W Way from 8th Ave. S to 9th Ave. S Provide sidewalk on west side of Ave. W (completing missing link) SW (completing missing link) (completing missing link) Purpose SW AA 236th St. SW from Hwy. 99 to 76th Ave. 238th St. SW from Hwy. 99 to 76th Ave. 191st St. SW from 80th Ave. W to 76th 104th Ave. W / Robinhood Lane from 80th Ave. W from 218th St. SW to 84th Ave. W from 188th St. SW to 238th St. SW to 106th Ave. W Project Name 220th St. SW186th St. SW Ave. W WW 20 $1,350,000$1,350,000$585,000$585,000$500,000$500,000$2,470,000$19,500,000$500,000$500,000$2,470,000$19,500,000$0$5,017,450$13,077,500$16,185,000$127,863,468$0$610,000 Local Funds$2,763,492$63,500$50,000$1,242,550$700,500$277,000$2,056,000 $0 $6,570,013$650,000$50,000$6,260,000$18,778,000$21,462,000$130,529,468 2023-2037 2017201820192020202120222023-2037 $0$5,000,000$5,000,000 202020212022 $0 $357,000 $357,000 $0 $0$0 2019 Revenue Summary by Year $350,000$500,000$500,000$500,000Total Federal & State (Secured)$3,481,521$86,500Total Federal & State (Unsecured)$350,000$500,000 $0 20172018 $10,000$150,000 $10,000 $0 Unsecured (Federal or State unsecured)(Federal or State unsecured)$357,000(Federal or State unsecured)(Federal or State unsecured)$23,820,000(Federal or State unsecured) (Federal or State secured)(Federal or State secured)(Federal or State secured)(Federal or State secured) Funding Source Annual CFP Totals (Local Funds)(Local Funds)(Local Funds)(Local Funds) (Unsecured) (Unsecured) (Unsecured)(Local funds) (Unsecured)(Unsecured) Source Total TotalTotalTotalTotal Capital Facilities Plan (CFP) Transportation Projects City of Edmonds (2017-2022) $13,568,021$30,809,950$4,947,042 $0 (2017-2022) Total Cost $23,970,000$49,300,013 $357,000$150,000 Construction $10,000$10,000 Totals $0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0 Project Phase ConceptualConceptualPossible GrantConceptualConceptual Design / Total CFP Opportunity Grant connecting to Brackett's Landing North Install wayside horns at both crossings Install a grade-separated overcrossing Provide sidewalk on one side of 189th Pl. SW from 80th Ave. W to 76th Ave. Ave. W / 180th St. SW from 188th St. Provide sidewalk on one side of 80th Improve ferry queueing by extending over the railroad tracks as an extension of Edmonds Street to reduce noise from train horns. ferry storage area along SR-104 Purpose park. (striping changes). SW to OVD W Ferry Storage Improvements from Pine 80th Ave. W / 180th St. SW from 188th 189th Pl. SW from 80th Ave. W to 76th Trackside Warning System at Dayton St. and Main St. Railroad Crossings Traffic Planning Projects Project Name Edmonds Street Overpass St. to Dayton St. Ferry/Railroad St. SW to OVD Ave. W 21 PROJECT NAME:th ESTIMATED PROJECT COST: 228St. SW Corridor $7,300,000 Safety Improvements thth PROJECT DESCRIPTION: 1) Extend 228St across the unopened right-of-way to 76Avenue West 2) ththth St SW @ SR99 and 228St. SW @ 76Ave. West 3) Construct a raised Signalize the intersection of 228 ththth median in the vicinity of 76Avenue West. 4) Add illumination between 224St SW and 228St SW on SR 995) ththth Overlay of 228St. SW from 80Ave. W to ~ 2,000’ east of 76Ave.W. PROJECT BENEFIT/ RATIONALE: The project will improve access / safety to the I-5 / Mountlake Terrace Park & Ridefrom SR99. This east / west connection will reduce demand and congestion along two east-west corridors (220th Street SW andSR104). Roadway safety will also be improved as SR 99/ 228th Street SW will ththnd become a signalized intersection. 228St. SW is being overlaid from 80Pl. W to ~ 1,000 LF east of 72Ave. W. thth as well as 76Ave. W from 228St. SW to Hwy. 99. The project consists of various utility upgrades. SCHEDULE: Construction began in 2015andsubstantial completion was obtained in May 2016. Physical completion is scheduled to be reached in October 2016. Theonlyremaining taskin 2017 is the completion of the Federal documentation.Federal and State grants were secured for the construction phase. This project was combined into one construction contract with the Hwy. 99 (Phase 3) Lighting project. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering, Administration, and ROW Construction $25,000 1% for Art TOTAL$25,000 * All or a portion of this project may qualify for 1% for the arts 22 PROJECT NAME th ESTIMATED PROJECT COST: :228St. SW from Hwy. $10,421,000 th 99 to 95Pl. W thth PROJECT DESCRIPTION:Widen 228St. SW from Hwy. 99 to 95Pl. W to three lanes (with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety and traffic flow along this corridor. SCHEDULE:The design phase is scheduled to begin in 2021 (pending funding). COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $75,000$300,000 Administration Construction $9,821,000 1% for Art TOTAL$75,000$300,000$9,821,000 23 PROJECT NAME:76 th Ave W @ 212 th St. SW ESTIMATED PROJECT COST:$6,500,000 Intersection Improvements PROJECT DESCRIPTION:Add a northbound and southbound left-turn lane to convert the signal operation for those approaches from split phasing to protected-permissive phasing. Add a right-turn lane for the westbound, southbound, and northbound movements. The project also consists of various utility upgrades and conversion of overhead utilities to underground. : PROJECT BENEFIT/ RATIONALEReduce the intersection delay and improve the existing level of service to LOS C. SCHEDULE: Design was completed in May2016.The project was advertised in June 2016 but the lowest bid was rejected since it was ~approx.$1.3 Million over budget. The project is scheduled to be 2016. re-advertised in early 2017. A TIB grant to cover the possible shortfall was submitted in August COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & Administration& ROW Construction $4,993,163$100,000 1% for Art TOTAL$4,993,163$100,000 24 PROJECT NAME:Highway 99 ESTIMATED PROJECT COST: $85,000,000 Gateway/Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities,landscaping and other softscape treatments to identify the area as being in Edmonds. P: ROJECT BENEFIT/ RATIONALEImprove aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE:The design phase is scheduled to begin in 2017 (pending approval of the 2017 decision package).An HSIP grant was also submitted in July 2016for this project. The construction phase is scheduled to begin in 2021 (pending additional funding / $10M from Connecting Washington allocation has been secured). COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $300,000$6,600,000 Administration & ROW Construction $6,000,000$72,400,000 1% for Art TOTAL$300,000$6,600,000$6,000,000$72,400,000 25 PROJECT NAME: SR-524 (196 th St. SW)/ 88 th ESTIMATED PROJECT COST: $903,000 Ave. W Intersection Improvements PROJECT DESCRIPTION: Install traffic signal at the intersection of 196 th St. SW @ 88 th Ave. W. The modeling in the 2009 Transportation Planindicated that restricting northbound and southbound traffic to right-turn-only (prohibiting left-turn and through movements) would also address the deficiency identified at this location through 2025.This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:Improve traffic flow characteristics and safety at the th intersection. The improvement would modify LOS to A, but increase the delay along 196St. SW. SCHEDULE:The intersection LOS must meet MUTCD traffic signal warrantsandbe approved th byWSDOT since 196St. SW is a State Route(SR524).No funding is currently allocated to this project (pending grant funding). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $193,000$175,000 Administration & ROW Construction $535,000 1% for Art TOTAL$193,000$175,000$535,000 26 PROJECT NAME: Main St and 9 th Ave. SESTIMATED PROJECT COST: $911,000 PROJECT DESCRIPTION:Installation of a traffic signal (or mini-roundabout is an alternative solution). : PROJECT BENEFIT/ RATIONALEThe existing intersection is stop-controlled for all approaches and the projected intersection LOSin 2035isLOS F (below the City’s concurrency standards: LOS D). The installation of a traffic signalwould improve the intersection delaytoLOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. SCHEDULE:All phases arescheduled between 2020 and 2021(unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $135,000 Administration Construction $776,000 1% for Art TOTAL$135,000$776,000 27 PROJECT NAME:220 th St SW @ 76 th Ave W ESTIMATED PROJECT COST: Intersection Improvements$5,925,000 PROJECT DESCRIPTION:Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected-permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY#1 in 2015 Transportation Plan). : PROJECT BENEFIT/ RATIONALEReduce the intersection delay and improve the LOS. The projected LOS in 2035 wouldbe improved from LOS F to LOS D. SCHEDULE:Engineering,ROW,andconstruction scheduled between 2020 and 2022 (unsecured funding). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering &ROW $330,000$1,800,000 & Administration Construction $3,795,000 1% for Art TOTAL$330,000$1,800,000$3,795,000 * All or a portion of this project may qualify for 1% for the arts 28 PROJECT NAME: Hwy. 99 @ 212 th St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements :th PROJECT DESCRIPTIONWiden 212St. SW to add a westbound left turn lane for 200’ storage length and an eastbound left turn lane for 300’ storage length. Provide protected left turn phase for eastbound and westbound movements.(ROADWAY PROJECT PRIORITY in 2015Transportation Plan: #4) P: ROJECT BENEFIT/ RATIONALEImprove intersection efficiency and reduce delay. SCHEDULE:All phases are scheduled between 2020and 2022(unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is inLynnwood. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering, $175,000$1,091,000 ROW, & Administration Construction $1,540,000 1% for Art TOTAL$175,000$1,091,000$1,540,000 29 PROJECT NAME: Hwy. 99 @ 216 th St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements :th PROJECT DESCRIPTIONWiden 216St. SW to add a westbound left turn lane for and an eastbound left turn lane. Provide protected-permissive left turn phasesfor eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. P: ROJECT BENEFIT/ RATIONALEImprove intersection efficiency and reduce delay. SCHEDULE:All phases are scheduled between 2020 and 2022(unsecured funding). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $164,000$334,000 ROW & Administration Construction $1,837,000 1% for Art TOTAL$164,000$334,000$1,837,000 30 PROJECT NAME: Hwy. 99 @ 220 th St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements PROJECT DESCRIPTION:Widen 220 th St. SW to add Westbound right turn lane for 325’ nd’ storage length. Widen SR-99 to add 2Southbound left turn lane for 275storagelength. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #1). PROJECT BENEFIT/ RATIONALE:Reduceintersection delay and improve traffic flow and safety. SCHEDULE:All Phasesare scheduled between 2020 and 2022(unsecured fundingfor all phases). COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Engineering & Administration & ROW $175,000$1,085,000 Construction $1,955,000 1% for Art TOTAL $175,000$1,085,000$1,955,000 31 PROJECT NAME th ESTIMATED PROJECT COST: :SR-104 @ 226St. SW / $194,000 th 15St. SW Intersection Improvements PROJECT DESCRIPTION:Extend the left turn lane for the westbound movement on SR-104. Complete various pedestrian and bicycle intersection improvements. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/ RATIONALE:Improve non-motorized transportationsafety at the intersection andimprove traffic flow along the SR-104corridor. SCHEDULE:2020-2021(unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $30,000 Administration & ROW Construction $164,000 1% for Art TOTAL$30,000$164,000 32 PROJECT NAME th ESTIMATED PROJECT COST: :SR-104 @ 95Pl. W $495,000 Intersection Improvements U PROJECT DESCRIPTION:pgrade all ADA Curb Ramps; and add C-Curb for access management. PROJECT BENEFIT/ RATIONALE:Improve intersection safety forpedestrians and vehicles. SCHEDULE:2020-2021(unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $75,000 Administration & ROW Construction $420,000 1% for Art TOTAL$75,000$420,000 33 PROJECT NAME th ESTIMATED PROJECT COST: :SR-104 @ 238St. SW $1,338,000 Intersection Improvements To Hwy 99 PROJECT DESCRIPTION:Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis(completed in 2015). PROJECT BENEFIT/ RATIONALE:Improve vehicular and pedestrian safety. SCHEDULE:2020-2021 (unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering &$200,000 Administration & ROW Construction $1,138,000 1% for Art TOTAL$200,000$1,138,000 34 PROJECT NAME: Olympic View Dr. @ 76 th Ave. ESTIMATED PROJECT COST: W Intersection Improvements$1,183,000 PROJECT DESCRIPTION:Install traffic signal(the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITYin 2015 Transportation Plan: #11). PROJECT BENEFIT/ RATIONALE:The improvement will reduce the intersection delay. The projected Level of Service isLOS F in 2035, which is below the City’s concurrency standards (LOS D).Theproject will improvethe Level of Service to LOS B. SCHEDULE:Engineering and Construction arescheduled between 2023and 2037 (unsecured funding). COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $200,000 Administration Construction $983,000 1% for Art TOTAL$1,183,000 35 PROJECT NAME:84 th Ave. W (212 th St. SW ESTIMATED PROJECT COST: $15,441,000 th to 238St. SW) th PROJECT DESCRIPTION:Widen 84Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalkon each side of the street. (part of this project was ranked #6in the Long Walkway list of the 2015 Transportation Plan). P: ROJECT BENEFIT/ RATIONALEImprove overall safety of the transportation systemalong this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE:Engineering and Construction are scheduled between 2023 and 2037 (unsecured funding).The project cost is split between Snohomish County and Edmonds since half the project is inEsperance. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $2,000,000 Administration Construction $13,441,000 1% for Art TOTAL$15,441,000 * all or part of this project may qualify for 1% for the Arts. 36 PROJECT NAME th ESTIMATED PROJECT COST: :SR-104 @ 100Ave. W $1,017,468 Intersection Improvements PROJECT DESCRIPTION:Implement Westgate Circulation Access Plan, install mid-block thth pedestrian crossing along 100Ave. W, and re-striping of 100Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis(completed in 2015). PROJECT BENEFIT/ RATIONALE:Improve access andsafetyat the intersectionand improve non-motorized transportationsafety. SCHEDULE:2023-2037(unsecured funding) COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $150,000 Administration Construction $867,468 1% for Art TOTAL$1,017,468 37 PROJECT NAME th ESTIMATED PROJECT COST: :SR-104 @ 76Ave. W $3,017,000 Intersection Improvements PROJECT DESCRIPTION:Add a 2 nd left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis(completed in 2015). PROJECT BENEFIT/ RATIONALE:Improve access andsafetyat the intersectionand improve non-motorized transportationsafety. SCHEDULE:2023-2037. The project cost would be split between Shoreline and Edmonds since half the intersection is in Shoreline. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $453,000 Administration Construction $2,564,000 1% for Art TOTAL$3,017,000 38 PROJECT NAME: th ESTIMATED PROJECT COST: Olympic View Dr. @ 174St.$610,000 SW Intersection Improvements : PROJECT DESCRIPTIONWiden Olympic View Dr. to add a northbound left turn lane for 50’ storage length. Shift the northbound lanes to the eastto provide an accelerationlane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13) P: ROJECT BENEFIT/ RATIONALEImprove intersection efficiency and safety of drivers accessing either street. SCHEDULE:Engineering and Construction are scheduled between 2023 and 2037 (unsecured funding). COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $100,000 Administration Construction $510,000 1% for Art TOTAL$610,000 39 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $3,000,000 from Bell St to Caspers St. : PROJECT DESCRIPTIONProvide awalkwayon the west side ofthe street, facing waterfront (~ 1/2mile / more recent project). PROJECT BENEFIT/ RATIONALE:To provide a safe and desirable walking route. SCHEDULE:Temporary improvements have been installed to evaluate the alignment of the proposed walkway. Additional modification to the temporary improvements will be completed in 2017 (since construction isn’t scheduled to occur until 2019 / 2020 when utility improvements are scheduled along this stretch). No grant funding has yet been secured for the construction phase. The design phase will be completed in 2017. COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Engineering & $183,250 Administration Construction $2,595,000 1% for Art TOTAL$183,250$2,595,000 * all or part of this project may qualify for 1% for the Arts. 40 PROJECT NAME: Dayton St Walkway ESTIMATED PROJECT COST: $75,000 thth between 7Ave. S and 8Ave. S PROJECT DESCRIPTION:Construct a missing link of sidewalk (approximately 250’) on thth Dayton St. between 7Ave. S and 8Ave. S (ranked #2 in Short Walkway Project list in 2015Transportation Plan). PROJECT BENEFIT/ RATIONALE:To provide a safe and desirable walking route. SCHEDULE:Engineering & Construction scheduled for 2020 (unsecured funding). COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Engineering & Administration Construction $75,000 1% for Art TOTAL$75,000 * all or part of this project may qualify for 1% for the Arts. 41 PROJECT NAME nd ESTIMATED PROJECT COST: :232St. SW Walkway $1,305,000 th from 100Ave. W to SR-104 PROJECT DESCRIPTION:Install sidewalk along 232 nd St. SW from 100 th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2021-2022(unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $200,000 Administration Construction $1,105,000 1% for Art TOTAL$200,000$1,105,000 42 PROJECT NAME: 238 th St. SW Walkway from ESTIMATED PROJECT COST:$1,400,000 thth 100Ave. W to 104Ave. Wand Stormwater Improvements th PROJECT DESCRIPTION:Installation of ~ 1,200’ of sidewalk on the north side of 238St. SW thth from 100Ave. W to 104Ave. W. as well as sharrows. Stormwater improvements will also be incorporated into the project. PROJECT BENEFIT/ RATIONALE:Improve pedestrian safety and create a safe pedestrian thth connection between 100Ave. W and 104Ave. W. SCHEDULE:Construction is complete. The project was funded by the Safe Routes to School grant program. Stormwater improvements werefunded by the Stormwater Utility Fund 422. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & Administration Construction $12,000 1% for Art TOTAL$12,000 * all or part of this project may qualify for 1% for the Arts 43 PROJECT NAME: 236 th St. SW Walkway from ESTIMATED PROJECT COST:$900,000 Edmonds Way to Madrona Elementary School PROJECT DESCRIPTION:Construct an ~ 800’ sidewalkon the south side of 236 th St. SW from SR-104 to Madrona Elementaryas well as the addition of sharrows along that stretch. (This is only part of a stretch of Walkway project, which ranked #1 in the Long Walkway list in the 2009 Transportation Plan) PROJECT BENEFIT/ RATIONALE:To provide a safe and desirable walking route near th Madrona Elementary School and along 236St. SW. SCHEDULE:Construction is scheduled to start in Fall 2016 and be completed by Spring 2017.The project is funded through the Safe Routes to SchoolGrant program,Fund 422 for stormwater improvements, and REET funds for the pavement reconstruction. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & Administration & ROW Construction $88,600 1% for Art TOTAL$88,600 44 PROJECT NAME th ESTIMATED PROJECT COST: :236St. SW Walkway $1,395,000 th from Madrona Elementaryto 97Ave. W PROJECT DESCRIPTION:Install sidewalk with curb and gutter along 236 nd St. SW from th Madrona Elementary to 97Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2020-2021 (unsecured funding) COSTBREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $213,000 Administration Construction $1,182,000 1% for Art TOTAL$213,000$1,182,000 45 PROJECT NAME th ESTIMATED PROJECT COST: :84Ave. W Walkway $585,000 thth from 238St. SW to 234ST. SW ththth PROJECT DESCRIPTION:Install sidewalk along 84Ave. W from 238St .SW to 234St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:Begin design in 2022 (unsecured funding) COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $90,000 Administration Construction $495,000 1% for Art TOTAL$90,000$495,000 46 PROJECT NAME th ESTIMATED PROJECT COST: :80Ave. W Walkway $1,439,000 thth from 206St. SW to 212ST. SW ththth PROJECT DESCRIPTION:Install sidewalk along 80Ave. W from 206St. SW to 212St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:The improvements willimprove non-motorized transportationsafety. SCHEDULE:2020-2022(funding unsecured). A Pedestrian and Bicycle Programgrant to fund the design phase was submitted in May 2016(response scheduled for Spring 2017). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $210,000 Administration & ROW Construction $1,229,000 1% for Art TOTAL$210,000$1,229,000 47 PROJECT NAME: 2 nd Ave. S Walkway from ESTIMATED PROJECT COST: $30,000 James St. to Main St. : PROJECT DESCRIPTIONConstruct a missing link of sidewalk (approximately 100’) on nd 2Ave. S between Main St. and James St. (Ranked #2in Short Walkway Project list in 2015Transportation Plan). PROJECT BENEFIT/ RATIONALE:To provide a safe and desirable walking route. SCHEDULE:2020 COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Engineering & Administration Construction $30,000 1% for Art TOTAL$30,000 * all or part of this project may qualify for 1% for the Arts 48 PROJECT NAME: ESTIMATED PROJECT COST: Maplewood Dr. Walkway $1,591,000 th from Main St. to 200St. SW PROJECT DESCRIPTION:Construct sidewalkon Maplewood Dr. from Main St. to 200 th St. thth SW (~ 2,700’). A sidewalk currently exists on 200St. SWfrom Main St. to 76Ave. W, adjacent to Maplewood Elementary School(rated #22in the Long Walkway list of the 2015 Transportation Plan). : PROJECT BENEFIT/ RATIONALECreate pedestrian connection between Maplewood th Elementary School on 200St. SWand Main St., by encouraging kids to use non-motorized transportation to walk to / from school. SCHEDULE:Engineeringscheduled for 2020and construction in 2022(funding unsecured). A grant application through Safe Routes to School Program was submittedin May 2016 for design funding (response scheduled for Spring 2017). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $230,000 Administration Construction $681,000$680,000 1% for Art TOTAL$230,000$681,000$680,000 * all or part of this project may qualify for 1% for the Arts. 49 PROJECT NAME th ESTIMATED PROJECT COST: :95Pl. W Walkway from $550,000 thth 224ST. SW to 220St. SW ththth PROJECT DESCRIPTION:Install sidewalk along 95Pl. W from 224ST. SW to 220ST. SW, with curb and gutter. This project ranked #9 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:Engineering scheduled for 2020 and construction in 2021 (funding unsecured). A TIB grant application was submitted in August 2016 to fund this project (response scheduled for November 2016). COST BREAKDOWN PROJECT COST2017201820192020202120222023-2036 Planning/Study Engineering & $105,000 Administration Construction $445,000 1% for Art TOTAL$105,000$445,000 50 PROJECT NAME th ESTIMATED PROJECT COST: :218St. SW Walkway $1,305,000 thth from 76Ave. W to 84Ave. W ththth PROJECT DESCRIPTION:Install sidewalk along 218St. SW from 76Ave. W to 84Ave. Wwith curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:The improvements willimprove pedestriansafety. SCHEDULE:2021-2022 (unsecured funding) COSTBREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering &$200,000 Administration & ROW Construction $1,105,000 1% for Art TOTAL$200,000$1,105,000 51 PROJECT NAME: Walnut St. Walkway from 3 rd ESTIMATED PROJECT COST: $105,000 th Ave. S to 4Ave. S PROJECT DESCRIPTION:Construct a missing linkof sidewalk(approximately 350’) on rdth Walnut St. between 3Ave. S and 4Ave. S (ranked #3in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/ RATIONALE:To provide a safe and desirable walking route. SCHEDULE:Engineering &Construction scheduled for 2020(unsecured funding). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $10,000 Administration Construction $95,000 1% for Art TOTAL$105,000 * all or part of this project may qualify for 1% for the Arts 52 PROJECT NAME: 216 th St. SW Walkway from ESTIMATED PROJECT COST: $157,000 nd Hwy. 99 to 72Ave. W PROJECT DESCRIPTION:Install 150’ sidewalk on north side of 216 th St. SW from Hwy. 99 to nd 72Ave. W (completing a missing link on north side of stretch). This project ranked #4 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/ RATIONALE:To provide a safe and desirablewalking route. SCHEDULE:Engineering &Construction scheduled for 2020(unsecured funding). COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $30,000 Administration Construction $127,000 1% for Art TOTAL$157,000 * all or part of this project may qualify for 1% for the Arts 53 PROJECT NAME: 238 th St. SW Walkway from ESTIMATED PROJECT COST: $491,000 Hwy. 99 to SR-104 PROJECT DESCRIPTION:Ranked #12 in Long Walkway list from 2015Transportation Plan. th Install 5’ sidewalkon the north side of 238St. SW. PROJECT BENEFIT/ RATIONALE:Improve pedestrian safety along that stretch and creating th safe pedestrian connection between Hwy. 99 and 76Ave. W. SCHEDULE:The design phase is underway and will be completed by early 2017.Construction is scheduled for 2017. A TIB grant was secured to fund the design and construction phases. COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & Administration Construction $413,000 1%for Art TOTAL$413,000 * all or part of this project may qualify for 1% for the Arts. 54 PROJECT NAME: 15 th St. SW Walkway from 8 th ESTIMATED PROJECT COST: $240,000 th Ave. S to 9Ave. S %£¬®­£² -¤¬®±¨ « #¤¬¤³¤±¸ :ththth PROJECT DESCRIPTIONAdd missing sidewalk link along 15St. SW from 8Ave. S to 9 Ave S PROJECT BENEFIT/ RATIONALE:Improve pedestrian safety along that stretch and providing th pedestrian connection from 9Ave. S. SCHEDULE:The designphasewill be completed in 2017. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $30,000 Administration Construction $200,000 1% for Art TOTAL$30,000$200,000 * all or part of this project may qualify for 1% for the Arts. 55 PROJECT NAMEESTIMATED PROJECT COST: :Elm Way Walkway from $789,000 thth 8Ave. S to 9Ave. S PROJECT DESCRIPTION:Install sidewalk along Elm Way from 8 th Ave. S to 9 th Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2020-2021 (funding unsecured). A Safe Routes to School grant applicationwas submitted in May 2016 to fund the design and construction phases of this project (response scheduled for Spring 2017. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $156,000 Administration Construction $633,000 1% for Art TOTAL$156,000$633,000 56 PROJECT NAMEESTIMATED PROJECT COST: :Minor Sidewalk Programvaries PROJECT DESCRIPTION:Complete missing sidewalkalong short segmentsthroughout the City. PROJECT BENEFIT/ RATIONALE:Improve pedestrian safety. SCHEDULE:annual program COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $10,000$5,000$5,000$5,000$5,000$5,000 Administration & ROW Construction $60,000$45,000$45,000$45,000$45,000$45,000 1% for Art TOTAL$70,000$50,000$50,000$50,000$50,000$50,000 57 PROJECT NAMEESTIMATED PROJECT COST: :191th St. SW Walkway $630,000 thth from 80Ave. W to 76Ave. W thth PROJECT DESCRIPTION:Install sidewalk along 191th St. SW from 80Ave. W to 76Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $90,000 Administration Construction $540,000 1% for Art TOTAL$630,000 58 PROJECT NAME th ESTIMATED PROJECT COST: :104Ave. W Walkway $990,000 thth from 238St. SW to 106Ave. W ththth PROJECT DESCRIPTION:Install sidewalk along 104Ave. W from 238ST. SW to 106 Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COSTBREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $150,000 Administration Construction $840,000 1% for Art TOTAL$990,000 59 PROJECT NAME th ESTIMATED PROJECT COST: :80Ave. W Walkway $315,000 thth from 218St. SW to 220St. SW ththth PROJECT DESCRIPTION:Install sidewalk along 80Ave. W from 218ST. SW to 220ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COSTBREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $55,000 Administration Construction $260,000 1% for Art TOTAL$315,000 60 PROJECT NAME th ESTIMATED PROJECT COST: :84Ave. WWalkway $315,000 thth from 188St. SW to 186St. SW ththth PROJECT DESCRIPTION:Install sidewalk along 84Ave. W from 188St. SW to 186St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $60,000 Administration Construction $255,000 1% for Art TOTAL$315,000 61 PROJECT NAME th ESTIMATED PROJECT COST: :236St. SW Walkway $765,000 th from Hwy 99 to 76Ave. W thth PROJECT DESCRIPTION:Install sidewalk along 236St. SW from Hwy 99 to 76Ave. W. This project ranked #11 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $115,000 Administration Construction $650,000 1% for Art TOTAL$765,000 62 PROJECT NAME th ESTIMATED PROJECT COST: :238St. SW Walkway $1,170,000 th from Hwy 99 to 76Ave. W thth PROJECT DESCRIPTION:Install sidewalk along 238St. SW from Hwy. 99 to 76Ave. W This project ranked #12 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $175,000 Administration Construction $995,000 1% for Art TOTAL$1,170,000 63 PROJECT NAME thth ESTIMATED PROJECT COST: :80Ave. W / 180St. $1,350,000 th SW Walkway from 188St. SW to OVD PROJECT DESCRIPTION:Install sidewalk along 80 th Ave. W from 188 th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $270,000 Administration Construction $1,080,000 1% for Art TOTAL$1,350,000 64 PROJECT NAME th ESTIMATED PROJECT COST: :189Pl. SW Walkway $585,000 thth from 80Ave. W to 76Ave. W ththth PROJECT DESCRIPTION:Install sidewalk along 189Pl. SW from 80Ave. W to 76Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE:This project would improve pedestrian safety. SCHEDULE:2023-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study Engineering & $115,000 Administration Construction $470,000 1% for Art TOTAL$585,000 65 PROJECT NAMEESTIMATED PROJECT COST: :Ferry Storage $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION:Modify existing lane channelization on SR104 to add vehicle storage for ferry users. PROJECT BENEFIT/ RATIONALE:Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2020 (unsecured funding) COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & $50,000 Administration Construction $307,000 1% for Art TOTAL$357,000 66 PROJECT NAME: Trackside Warning System ESTIMATED PROJECT COST: $350,000 @ Dayton and Main St. RR Crossing : PROJECT DESCRIPTIONInstall Trackside Warning System @ Dayton and Main St. Railroad Crossings. PROJECT BENEFIT/ RATIONALE:Reduce noise from train horns at both intersections. SCHEDULE:Construction is scheduled to be completed bylate 2016or early 2017. COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Engineering & Administration Construction $10,000 1% for Art TOTAL$10,000 * all or part of this project may qualify for 1% for the Arts. 67 PROJECT NAMEESTIMATED PROJECT COST: :Edmonds StreetOverpass$24,000,000 PROJECT DESCRIPTION:This project builds a grade-separated overcrossing over the railroad tracks as an extension of Edmonds Street connecting to Brackett’s Landing north park. PROJECT BENEFIT/ RATIONALE:Provide access for emergency vehicles, pedestrians, and bicycles. The overpass could be utilized to offload passenger vehicles from a ferry during an extended closure of the railroad track crossings. SCHEDULE:2017-2037 COST BREAKDOWN PROJECT COST2017201820192020202120222023-2037 Planning/Study $500,000$500,000 Engineering & $500,000$500,000$770,000 Administration Right of Way/ $1,700,000 Environment Mitigation Construction $19,500,000 TOTAL$500,000$500,000$500,000$500,000$2,470,000$19,500,000 68 69 CFP STORMWATER 70 71 $0 $20,000$20,000$50,000$50,000$0$70,000 $70,000 2022 2022 $0$0 $0 20212021 $0 $1,950,000 $650,000$375,000$125,000 $2,600,000$500,000$2,325,000$775,000 $0 $3,100,000 2020 2020 $1,800,000$600,000$375,000 $2,400,000$125,000$2,175,000 $500,000$0$725,000 $2,900,000 20192019 Revenue Summary by Year $50,000$225,000$75,000$337,500$112,500 $300,000$450,000$562,500$237,500 $50,000$0 $800,000 2018 2018 $1,900,000$225,000 $1,900,000$75,000$510,375$170,125 $300,000$680,500$510,375$225,000$2,145,125 $2,880,500 20172017 Total Federal & State (Secured) Debt / Stormwater Fees (Federal or State unsecured)(Federal or State unsecured)(Federal or State unsecured) (Federal or State secured)(Federal or State secured)(Federal or State secured) Total Federal & State (Unsecured) (Debt/Stormwater Fees)(Debt/Stormwater Fees) Annual CFP Totals (Debt/Stormwater) Revenue Source Source TotalTotalTotal $1,950,000$1,950,000$1,420,000$5,620,000$1,087,500$2,180,500$9,750,500 $4,200,000 $5,287,500$3,952,625 (2017-2022) Total Cost $510,375$582,625 $510,375 Totals $0$0$0 Current Project DesignDesign Phase Study Total CFP Possible Grant/TBDPossible Grant/TBD RCO SRF Grant Grant Opportunity Ecology Grant Grant/Date stormwater runoff that erodes the stream, causes flooding Daylight channel to allow better connnectivity with the Puget Find solution to high peak stream flows caused by excessive Add lift station and other new infrastructure to reduce and has negative impacts on aquatic habitat. Sound to benefit fish and reduce flooding. Purpose intersection flooding. Reduction/Management Project - Dayton St and Hwy 104 Drainage Seaview Park Infiltration Facility Project Name Perrinville Creek High Flow Willow Creek/Daylighting Improvements. 72 73 PROJECT NAME:ESTIMATED PROJECT COST: Dayton St and Hwy 104 $2,227,700 Drainage Improvements PROJECT DESCRIPTION:Add lift station in the Beach Place parking lotand other new infrastructure. : PROJECT BENEFIT/ RATIONALETo reduce flooding at the intersection of Dayton St and State Hwy 104. SCHEDULE:2017-2019 COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Eng. & Admin. $100,000 Construction $1,800,000$50,000 1% for Art $10,000 TOTAL$1,900,000$50,000 74 PROJECT NAME:Willow Creek Daylighting ESTIMATED PROJECT COST: $5,825,000 Edmonds Marsh as seen from the viewing platform.Previously restored section of Willow Creek. Source: www.unocaledmonds.info/clean-up/gallery.php PROJECT DESCRIPTION:Buildingonthestudiescompleted in 2013 and 2015 thatassessedthe feasibility of daylighting the Willow Creek channel, thisproject will likely construct anew tide gateand 1,100 linear ft of new creek channel lined with an impermeable membrane. Funds will be used for design and construction but exact breakdown cannot be assessed at this time. PROJECT BENEFIT/ RATIONALE:The daylightingof Willow Creek will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was pipedin the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. This project, along with its companion CIP projects “Edmonds Marsh Channel Improvements” and “Dayton Street Pump Station,” will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. SCHEDULE:2017-2025 COST BREAKDOWN PROJECT COST201720182019202020212022 Planning/Study Eng. & Admin. $459,278$300,000$300,000$300,000$300,000$300,000 Construction 1% for Art TOTAL$459,278$300,000$300,000$300,000$300,000$300,000 75 PROJECT NAME:ESTIMATED PROJECT COST: Perrinville Creek High Flow $2,532,950 Reduction/Management Project Perrinville Creek Perrinville Creek Channel illustrating the channel incision that will be addressedby restoration. PROJECT DESCRIPTION:A flow reductionstudy for the Perrinville Creek basin was completed in 2014. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. The City applied for and won a grant from the Department of Ecology for $633,750to design and construct a stormwater infiltration facility in Seaview Park. The 2017 budget isfor that facility. The dollars allocated in the out years are to implement additional water quality and flow control projects in the Perrinville Creek basin as recommended by the Flow Reduction Study. PROJECT BENEFIT/ RATIONALE:Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low-gradient downstream reaches of the creek. Before any habitat improvements can be implemented, the flows must be controlled orthese improvements will be washed away. SCHEDULE:2017-2022 COST BREAKDOWN PROJECT 201720182019202020212022 COST Planning/Study Eng. & Admin. $35,000$50,0005000050000$50,000$50,000 Construction $944,000$400,000$450,000$450000 1% for Art $3,950$1,125$1,250$1,250 TOTAL$982,950$451,125$501,250$501,250$50,000$50,000 76