Pavment Compaction report 11.29.16.pdfEarth Solutions NWLLC Field Re
TJD
1805 136" PI NE Bellevue, WA 98005 Time On
Suite 201 FAX (425) 449-4711
TOLLTOOL FREE:
FREE:04 (866) 366-8710 9:00 A
DAILY FIELD REPORT Travel Tin
0.75 RT
Project Name
Top Pot
General Contractor
BDZ _
Grading Contractor
BDZ
Job Location
General Contractors Superintendent
Chad
Grading Foreman
Craig
Are Approved Plans/Permits Onsite ® YES NO Project No
p. Project No.
ES- �c`'] L'
Site Time Off Site
M 9:45 AM
e
Page Report No.
1 of 1 1
Date Day of Week
11/29/16 I Tuesday
Weather
Rainy, 460F
Client / Owner
BDZ
Received Onsite By
Checked By
Permit No.
Onsite Visit
As requested, ESNW representative was onsite to
activities and storm line backfill on Sunset & James.
observe earthwork
Upon arrival, ESNW representative observed that the grading contractor
had installed 4" storm water line and was in the process of backfilling the
storm water line with minus crushed rock off of Sunset & James. ESNW
representative observed that the storm water line was approximately 2' to 3'
below subgrade and well bedded in pea gravel. ESNW representative
observed that the grading contractor was backfilling the storm water line
with minus crushed rock and compacting the material with a jumping jack.
Finally, ESNW representative collected a sample of the minus crushed rock
for modified proctor analysis in ESNW laboratory.
ESNW representative will return onsite
when requested for rther observation of
earthwork activities.
Terry Dunn
ESNW Field Technician
20) 960-9597
COPY TO.
-1 LVP'
CONTINUED ON NEXT PAGE