Loading...
PC-05-423x4.doc City of Edmonds Plan Review Corrections Plan Check #: Date: 05-423 / BLD20060552 June 13, 2006 th Project Name/Address: R&H Investments LLC / 21920 – 76 Avenue W. Contact Person/Address: Tony Shapiro, A.D. Shapiro Architects / Fax: (425) 778-3032; e-mail: tonys@adshapiro.com Reviewer Department : Meg Gruwell: Planning I have reviewed the above building permit application and resubmittals for the Planning Division. Before I can sign off on it I still need the following: 1.Lot Line Adjustment: I do not see that a lot line adjustment has been submitted since my first corrections. As I stated before, the site currently consists of three lots. In order not to have to maintain setbacks to all the interior lot lines, you must combine the lots. This can be done with a lot line adjustment, which requires a survey, but has no public notice. Or you can use the lot combination process, which does not require a survey, but requires notice to everyone within three- hundred feet of the site (see ECDC 20.75.055). Department policy requires that prior to issuance of any building permit the lot line adjustment or combination decision must be submitted. Since none of the conditions of approval mentioned this requirement, I will just require that a complete application for the lot line adjustment or combination be submitted prior to issuance of the building permit. The lot line adjustment or combination must be recorded at Snohomish County prior to the Planning Division signing off on the final inspection for the building. Please let me know if you have any concerns about this timeframe. 2.Awnings: The awnings shown on the building elevations scale as 3 feet from the edge of the building. On the south and east sides of the building, that would put them 3 feet into the setbacks, but eaves are only allowed to intrude a maximum of 30 inches per ECDC 16.30.040.D. 3.Changes to Sheet A3.1: On sheet A3.1, Building Elevations, please revise as follows: a.Please add the number “381.0” to the average grade line. b.Include a note that if the elevator roof is visible it shall coordinate in color and materials with the rest of the building. c.Change the “height of the highest ridge” and “proposed building height” in the Table labeled “5” to match the table on sheet A1.1 and the elevations shown on the building elevations. d.Correct all the scales which state 1/16” but appear to be a 1/8” scales. 4.Pad South of South Door: What is the purpose of the pad south of the walkway from the south door? If it is for a bike rack or bench, please show that. If it has no purpose, it should be changed to landscaping, and the landscaping added to the Landscape Plan. DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____ 5.Reduced Site Plan: a.The reduced site plan should be to a measurable scale, preferably 1 inch = 20 feet. b.The height calculations should be included, or attached. If you have any questions, please call me at (425) 771-0220, extension 1330. Please make all submittals to the Development Services Coordinator, and provide two copies of any revised plans or elevations. Your existing plans and elevations may also be red-lined. Thank you. DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____