Loading...
PC-06-010x4.doc City of Edmonds Plan Review Corrections Plan Check #: Date: 06-010 May 31, 2006 th Project Name/Address: Korean United Presbyterian Church / 8505 – 240 Street SW Contact Person/Address: Adam Clark / Fax: (425) 742-8130; e-mail: adam@garyparkinson.com Reviewer Department : Meg Gruwell: Planning I am really close to signing off on this permit. Just a couple of items before I can sign off on it I need the following: 1.Reduced Site Plan: Please make sure we have a copy of the most recent site plan in a reduced copy (8.5 by 11 inches). Currently our reduced site plan is dated 12/30/05 and the large C-1.0 has a revised date of 6/20/06. The large size plan and the reduced copy must match. 2.Conflicts: After a light-table check this morning, we discovered that two fire hydrants proposed to go in planter beds (see attached) are in approximately the same location as trees that are on the Landscape Plan. It appears to me that both the trees and fire hydrants will fit, but they will need to be adjusted a bit so that they are not on top of each other. Please adjust the location of the fire hydrants on sheet C-3.1 and/or the trees on the Landscape Plan so that they can both be accommodated within the two planter beds circled on the attached drawing. If you have any questions, please call me at (425) 771-0220, extension 1330. Please make all submittals to the Development Services Permit Coordinator, and provide two copies of any revised plans or elevations and three copies of any site plans. Your existing plans and elevations may also be red-lined. Thank you. DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____