PC-06-010x4.doc
City of Edmonds
Plan Review Corrections
Plan Check #: Date:
06-010 May 31, 2006
th
Project Name/Address: Korean United Presbyterian Church / 8505 – 240 Street SW
Contact Person/Address: Adam Clark / Fax: (425) 742-8130; e-mail: adam@garyparkinson.com
Reviewer Department
: Meg Gruwell: Planning
I am really close to signing off on this permit. Just a couple of items before I can sign off on it I need the
following:
1.Reduced Site Plan: Please make sure we have a copy of the most recent site plan in a reduced copy
(8.5 by 11 inches). Currently our reduced site plan is dated 12/30/05 and the large C-1.0 has a revised
date of 6/20/06. The large size plan and the reduced copy must match.
2.Conflicts: After a light-table check this morning, we discovered that two fire hydrants proposed to go
in planter beds (see attached) are in approximately the same location as trees that are on the
Landscape Plan. It appears to me that both the trees and fire hydrants will fit, but they will need to
be adjusted a bit so that they are not on top of each other. Please adjust the location of the fire
hydrants on sheet C-3.1 and/or the trees on the Landscape Plan so that they can both be
accommodated within the two planter beds circled on the attached drawing.
If you have any questions, please call me at (425) 771-0220, extension 1330.
Please make all submittals to the Development Services Permit Coordinator, and provide two copies of
any revised plans or elevations and three copies of any site plans. Your existing plans and elevations may
also be red-lined.
Thank you.
DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____