PC-06-199.doc
City of Edmonds
Plan Review Corrections
Plan Check #: Date:
06-199 May 31, 2006
th
Project Name/Address: Korean United Presby. Church / 8505 – 240 St. SW
Contact Person/Address: Grant Middleton / Fax: (253) 872-5797; e-mail: grantm@emeraldaire.com
Reviewer Department
: Meg Gruwell: Planning
I have reviewed the above building permit application for the Planning Division. Before I can sign off on
it I need the following:
1.Screening: Thank you for providing the elevations with the HVAC equipment shown on the roof. It
appears that the units will not be totally screened by the parapet walls. As required in ECDC
20.10.070.A.3 “Mechanical equipment or other utility hardware on the roof, grounds or buildings
should be screened from view.” The screening must be coordinated with the building colors and
materials. Please show how all the roof-mounted equipment will be screened from view.
2.Height:
a.Corrections to height calculations have been requested to the main building permit for the
building. Please update your plans to show the new average grade and maximum allowed height.
b.Note that 72.0 and 71.5 are shown at the same elevation (also noted as 0.0). Please make sure the
average grade is shown correctly.
c.Please show how the HVAC equipment and any screening will meet the 35-foot height limit.
If you have any questions, please call me at (425) 771-0220, extension 1330.
Please make all submittals to the Development Services Permit Coordinator, and provide two copies of
any revised plans or elevations and three copies of any site plans. Your existing plans and elevations may
also be red-lined.
Thank you.
DATE FAXED__________ (Attach fax transmittal) PAGE _____ OF _____